Item Description / Component

Air Storage Tanks & supports


Thermal matrix Interconnecting
piping

Air Supply Compressor Air dryer


Cooling tower, pumps, piping

Cooling water system

Shut-Off Valve Butterfly


Electric drive
Flexible Joint Bellows

Pressure Regulating Valve Low noise, quick acting Electric or hydraulic


drive
Hydraulic power
pack

Settling Chamber Pressure shell Screens


Honeycomb
Acoustic baffles

Flexible Nozzle

Electric screw stops


Support structure Flexible plate
Jack system
Hydraulic cylinders
Support structure Flexible plate
Jack system

Hydraulic power
pack

Transonic Test Section Structure, interfaces


Pressure shell
Acoustic treatment

Hydraulic cylinders
Hydraulic power
Locating pins pack

Transport system Bogies

Schlieren windows Covers and windows

Valves(2) and piping


Ejector for upper
Blowoff system transonic

Slotted walls
Slotted wall insert Schlieren /optical
access
Project : ISRO- 1.2m Trisonic Blow Down Wind Tunnel - BDWT
EPC Contractor : Tata Projects Limited
Client : Indian Space Research Organization
Engineering scope Matrix

Item Description / Component

Porous walls
Porous wall insert

Schlieren /optical
access
Model Cart Pressure shell Locating pins
Transport system
Hydraulic cylinders
Model Cart Pressure shell Locating pins
Transport system

Hydraulic power
pack
Bogies

Top and bottom


walls
Re-entry flaps
Actuators

Model support system Fixed strut

Movable strut Link


arms
Hydraulic cylinder
Hydraulic power
pack
Roll drive (electric)

Sting

Choke system Fingers


Hydraulic cylinder
Hydraulic power
pack

Variable Diffuser Top and bottom


Main structure walls
Three-piece
segments
Hydraulic cylinder
Second throat system Hydraulic power
pack

Moveable Diffuser Shell


Main structure
Seal
Transport system Main structure Rail mounted
support
Fixed Diffuser Shell
Project : ISRO- 1.2m Trisonic Blow Down Wind Tunnel - BDWT
EPC Contractor : Tata Projects Limited
Client : Indian Space Research Organization
Engineering scope Matrix

Item Description / Component

Ejector System Main structure Nozzles


Pressure regulation valve
Interconnecting piping

Exhaust Stack Main structure Flow spreaders Concrete shell Steel


Acoustic baffles weldments

Instrumentation, Automation, Pressure and


Control & Data Acquisition temperature Steady
scanned pressures
Unsteady pressures
Primary measurement Model Hot wire/hot film
measurement system
Turbulence measurement Sting
balances

Operator workstation &Server

Instrumentation for Air compressor


and other utilities

Schlieren System Light source


Mirrors Camera system
Planar and focussing
Schlieren System Light source
Mirrors Camera system
Planar and focussing

Commissioning Equipment
Supersonic flow quality Traversing rake

Centreline pole
Transonic flow quality
10deg Cone model

Cone/cylinder model
Porous wall optimization
Project : ISRO- 1.2m Trisonic Blow Down Wind Tunnel - BDWT Tata Projects Limited
EPC Contractor : Client : Indian Space Research Organization
Document : Preliminary & Detail Engineering scope Matrix

Item Description / Component

Buildings & Structural Bldg No.1 - Wind Tunnel Hall


Following Building Interfaces
Main hall crane
Transonic test section insert change
over & storage
Model Access Platform Foundations

Equipment
Foundations
Storage Rack Rails
Drive
Bldg No.2 - Compressor House
Bldg No.3 - Technical Block-1
Bldg No.5- Muffler Exhaust Section
Bldg No.6 - Maintenance room
Bldg No.8 - Technical Block 2
Bldg No.9- Cooling water system for
compressor
Bldg No.11 - Electrical control Room
Bldg No.12 - Fire Water Pump
House
Bldg No.13-Ground Level Reservoir
Bldg No.14-Store Room
Bldg No.15- Substation - MCC Building
DG Set Room
Bldg No.9- Cooling water system for
compressor
Bldg No.11 - Electrical control Room
Bldg No.12 - Fire Water Pump
House
Bldg No.13-Ground Level Reservoir
Bldg No.14-Store Room
Bldg No.15- Substation - MCC Building
DG Set Room
Bldg No.18 - Security room Bldg No.
21- Workshop Instrument air Package
Shed Storm water Drain system-
Watch Tower
RCC Water Tank - Elevated

Fire Fighting System

High pressure air for model

Project : ISRO- 1.2m Trisonic Blow Down Wind Tunnel - BDWT


EPC Contractor : Tata Projects Limited
Client : Indian Space Research Organization
Engineering scope Matrix

Item Description / Component

Electrical / Controls 11 KV system input for ISRO


procurement
Transformers Sizing for ISRO
procurement
Compressor Motor soft starter PMCC
Motor control cabinets
Position control Cabinets
UPS -10 KVA capacity
UPS -30 KVA capacity
Diesel Engine Driven Generator
Cabling/wiring
Electrical / Controls 11 KV system input for ISRO
procurement
Transformers Sizing for ISRO
procurement
Compressor Motor soft starter PMCC
Motor control cabinets
Position control Cabinets
UPS -10 KVA capacity
UPS -30 KVA capacity
Diesel Engine Driven Generator
Cabling/wiring
Earthing
Lighting System
Date : 20/10/2018
Page : 1 of 5
Rev. : V1.0
Annexure 8 for TPL/AEC sub Contract

AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering

Volume and pressure Tubing √ √


Size, GA
√ √

√ √

Mass flow rate and pressure √ √


Mass flow rate, pressure & dew point Type,
performance √ √

√ √

Size, Specs √

Size, drawing √ √

Size, opening speed, prototype testing √ √

Hydraulic schematic by AEC and MR √ √


/PR by TPL detailing of connection to
cylinders
Size, design pressure, internal airline, √ √
fabrication drawings
Size, mesh, vulcanizing & attachments details √ √
and specs
Size, cell size, fabrication drawings by AEC
and MR/PR by TPL √ √
Size, number, performance fabrication
drawings
√ √

Structural definition, fabrication √ √


drawings
Size, thickness , testing, detail fabrication √
drawings
Number and type of jacks; fabn drgs √ √
Resolvers for automatic setting

Number, stroke size load ratings etc. √ √


Hydraulic schematic by AEC and MR √ √
/PR by TPL detailing of connection to
cylinders
Size, design pressure, fabrication drawings √ √

Size, performance , fabrication drawings √ √

Number, stroke size load ratings etc. √ √

Hydraulic schematic by AEC and MR √ √


/PR by TPL detailing of connection to
cylinders
Longitudinal and lateral drives and √ √
detail fabrication drgs
Size, number and pressure loading and detail √ √
procurement specifications for Schlieren and
fabrication drawings forcovers

Size, opening speed , specs Size, range √ √


(drawings)
√ √

Slat and slot number & shape and detailed √ √


fabrication drawings
Size and number and detaildrawing √ √

Date : 20/10/2018
Page : 2 of 5
Rev. : V1.0 Document : Preliminary & Detail

AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering

Air side size, holes with splitter plate √ √


(drawings)
√ √
Backplate size, holes, range (drawings)

Porosity adjustment system (drawings); √ √


Electric drives for backplate

√ √
Size and number and detail drawing
Structural definition (drawings) √ √
Nos, Size, type, loads
√ √
Hydraulic schematic by AEC and MR √ √
/PR by TPL detailing of connection to
cylinders
Longitudinal drive and fabrication dwgs
√ √
Size, range of motionand fabrication dwgs √ √

Size and speed with eletric drives √ √


Structural defn and fabrication dwg √ √
Structural defn and fabrication dwg √ √
Structural defn and fabrication dwg √ √
Nos, Size, stroke, load
√ √

Hydraulic schematic by AEC and MR √ √


/PR by TPL detailing of connection to
cylinders
Fabrication dwg, Power, speed, harmonic
drive √ √

Size, loads, passages for instrumentation √ √


wiring and high pressure air from ISRO BL
√ √ √

Size, stroke, fabrication drawings √ √


Nos, Size, stroke, load
√ √

Hydraulic schematic by AEC and MR √ √


/PR by TPL detailing of connection to
cylinders
√ √
Size GA, Fabrication dwgs
√ √

Size, range of motion, fabrication dwgs Size, √ √


stroke, force
Rating
√ √

Size, loads fabrication dwgs √ √

Size √ √

Axial drive and fabrication dwgs Size and √ √


fabrication dwgs
√ √
Date : 20/10/2018
Page : 3 of 5
Rev. : V1.0 Document : Preliminary & Detail

AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering

Size, GA and fabrication dwgs Size, number, √ √


connection details Size, range
Size, GA by AEC detailing by TPL √ √

√ √

√ √ √
Size √ √
Size, open area ratio, fabrication dwgs Size, √ √
number & performance, fabrication drawings
√ √

√ √

Number, type, range, sprecs Electronic √ √


scanner, type range, specs Number, type,
range, specs √ √
Number, type, range, specs
Number, type, range, specs
√ √

√ √
Process control & Safety PLC √ √
Automation & control ( Software Develoment
, Integration ) √ √
Measuring Instrument & Wiring
Data acquisition
• Tunnel Channels (PPLC / SPLC)
• LSDAS √ √
• HSDAS
• Wireless DAS √ √

Primary Measurement Package PLC √ √


Integration of sub systems

Type, performance, specs Size, type, specs √ √


Still and video, specs
Type, performance, specs Size, type, specs
Still and video, specs
√ √

√ √
Size, range of motion √ √
Pitot tube number
√ √

Size, static hole number and size √ √


Size
√ √

Size √ √

DWT Tata Projects Limited Date : Page : 20/10/2018


Rev. : 4 of 5 V1.0

AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering

Size - 67.5 x 20 x 18m Ht, GA , Detail Design of √ √


Bldg by TPL
Equipment Foundations for PRV , Settling
Chamber , Flexible Nozzle , Canister Section √ √
, Ejector System , Fixed Diffuser Loading By AEC ,
Detail Design by TPL
Size, range Structural definition Size, type,
loads Power, speed
Size, motion (drawing)
Footprint and loads √ √
√ √
√ √
√ √
√ √
√ √

Size- 30 x 20 x 12.5m Ht , Air drier skid √ √


Foundation, Trench for Cables
Size - 48 x 25 x 4m Ht √ √ √
Size-6.4 x 6 ( Hollow ) x 15m Ht. Size - 8 x 6 x
5m Ht
Size - 29 x 26 x 4m Ht Size - - 15 x 10 x 4 m Ht √ √ √
Size -- 12 x 6 x 4m Ht
Size - 19 x 8 x 5m Ht √ √
Size- 36.5 x 18.5 , Compartment for
compressor house,firefighting
Size - - 6 x 6 x 4m Ht
Size - 23 x 12 x 4m Ht, RCC Structure Design
Size- 11 x 10 x 5 m
Size- 8 x 7 x 3m ht. , RCC Structure Design
Size - 29 x 26 x 4m Ht Size - - 15 x 10 x 4 m Ht
Size -- 12 x 6 x 4m Ht
Size - 19 x 8 x 5m Ht
Size- 36.5 x 18.5 , Compartment for
compressor house,firefighting
Size - - 6 x 6 x 4m Ht √ √
Size - 23 x 12 x 4m Ht, RCC Structure Design
Size- 11 x 10 x 5 m √ √
Size- 8 x 7 x 3m ht. , RCC Structure Design
Size-12 x 12 x 5m ht , RCC Structure √ √
Design
Capacity - size -3 x 3 x 4 m ht , Layout , sizing ,
Design Detailing √ √
for drinking water purpose - 40 m3 size
Layout , Hydraulics calculation , Water √ √
Demand calculation
Piping from ISRO supply to model support √ √

√ √

√ √

√ √

√ √

√ √

√ √

√ √

√ √

√ √

Date : 20/10/2018
Page : 5 of 5
Rev. : V1.0 Document : Preliminary & Detail

AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering

HT Panel Detailing √ √
Compressor and everything else
11 KV compressor motor soft starter
Design of PMCC for Compressor Aux. Air drier , Air
cooling System ,HVAC , UPS inside MCC
substation.
Number and type
Detailing of VFD Panels with VFD Feeders for
flexible nozzle ,screw stop motors,Model
Cart ,Variable Diffuser, TTS wall porosity drives etc
inside MCC substation
HT Panel Detailing
Compressor and everything else
11 KV compressor motor soft starter
Design of PMCC for Compressor Aux. Air drier , Air
cooling System ,HVAC , UPS inside MCC √
substation.
Number and type
Detailing of VFD Panels with VFD Feeders for √ √
flexible nozzle ,screw stop motors,Model
Cart ,Variable Diffuser, TTS wall porosity drives etc
inside MCC substation √ √
Design for battery back up duration 1
Hr.Located in MCC substation
Design for battery back up duration 1
Hr.Located in UPS/ Battery Room of technical √ √
block-1
Detailing of 415 Volt 3 Phase 125 KVA DG for √ √
Emergency power
Power and Control cabling
Design as per latest IS requirement
For Lighting Transformer , LDB,Panels ,
Fixtures Layout √