LPW 3

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 27

LEVEL 1 LEVEL 2

level 1: planning and


A.1 Site Investigation
admin

A.2 Ground Improvement

A.3 Planning and


Designing

level 2 Foundation
B.1 Setting out of work
and sub structure

B.2 Excavation with


machine
B.3 Preparation of the
base using PCC
B 4.1 RCC footing
B.5 Constuction Plinth
beam
B 6 Anti-termite
treatment
B 7 Soil filling and
compaction
B.8 Damp proof
course(concreting)

level 3 super structure C.1 RCC frame

C.2 RC staircase

C.3 constuction of wall

C.4 Placing Doors and


windows

D.1 plumbing work


E.2 electric work

level 4 Finishing and


D.3 plaster
fitting work
D.4 water proofing
D.5 white wash
D.6 painting
D.7 floor tiles
D.8 finishing work
Work Breakdown Structure

LEVEL 3 List of activities

A 1.1 Primary A 21.1 Primary


Investigation Investigation
A 1.2 Secondary A 1.2 Secondary
Investigation Investigation

A 2.1 Site Clearing A 2.1 Site Clearing

A 2.2 Compacting
A 2.2 Compacting ground
ground
A.3 Planning and
Designing

B 1.1Construction survey B 1.1 Construction


for setting out of survey for setting out
foundation of foundation
B.2 Excavation with
machine
B.3 Preparation of the
base using PCC
B 4 RC footing
B.5 Constuction Plinth
beam
B 6 Anti-termite
treatment
B 7 Soil filling and
compaction
B.8 Damp proof
course(concreting)

C.1.1 Column
C.1.1 Column construction
construction
C.1.2 Beam
C.1.2 Beam construction
construction
C.1.3 Slab casting C.1.3 Slab casting
C.2.1 1st flight with C.2.1 1st flight with
landing landing
C.2.2 2nd flight C.2.2 2nd flight
C.3.1 Brickwork of wall C.3.1 Brickwork of
till sill level wall till sill level
C 3.2 Brickwork of wall C 3.2 Brickwork of
lintal wall till lintal
C 3.3 Constuction of
C 3.3 Constuction of chajja
chajja
C 3.4 Brickwork of wall C 3.4 Brickwork of
above lintal wall above lintal
C.3.5 Brickwork of parapet C 3.5 Brickwork of
wall parapet wall
C.4 Placing Doors
and windows

D.1.1 pipe fitting work D 1.1 pipe fitting work


D.2.1 electric line fitting E 1 electric line fitting

D.3 plaster

D.4 water proofing


D.5 white wash
D.6 painting
D.7 floor tiles
D.8 finishing work
ructure

RENAME OF
ID Time duration (in days)
ID

A.1.1 A1 1

A.1.2 B1 3

A 2.1 C1 1

A 2.2 D1 2

A3 E1 8

B 1.1 A2 1

B.2 B2 3

B3 C2 10

B4 D2 18

B5 E2 8

B6 F2 1
B7 G2 2

B8 H2 3

C1.1 A3 10

C1.2 B3 16

C 1.3 C3 11

C 2.1 D3 9

C 2.2 E3 9

C.3.1 F3 3

C 3.2 G3 3

C 3.3 H3 8

C 3.4 I3 2

C.3.5 J3 2

C4 K3 4

D 1.1 L3 3
E 1.1 M3 2

D3 A4 11

D4 B4 8
D5 C4 3
D6 D4 5
D7 E4 3
D8 F4 2
175
IPA

––—

A1

B1

C1

A1

D1,E1

A2

B2

C2

D2

E2
F2

G2

B2

A3

A3

A3

D3

B3,C3

F3

G3

H3

C3,E3,I3

H3

K3
K3

M3,L3,J3

A4
B4
C4
D4
E4
0
1 C1-1 5
4
A1 - 1 B1 -3
1 2 3 5

0 1 6
E1-8 E1'

4
9
D1-2 A2 - 1 10
5 9 B2 - 3

5 8 9

7 9 10
13 C2 - 10 23 D2 - 18 41 E2 - 8
B2 - 3

10 11 12

13 23 41
E2 - 8 49 F2 - 1 50 G2 - 2
52
13 14
15

49 50
52
16
B3-

52 H2 - 3 55 A3- 10 65
15
16 17

52
55 65
D3
-9
7

81

16 20
B3-

81 90
B3' G3-3

21
C3-11 F3-9
81
90
19
D3
-9 C3'
81
81
E3-9
18

97
101
K3-4
93 H3-8
24

23 101
G3-3
93

I3-2

101 J3-2

22

0
106
105

25
L3-3
108
105
A4-11
27

M3-2
108
J3
'
107

26
108
A4-11
119

28
119

B4-8

127

29

127
C4-3

130

30
130

D4-5

135

135 31

E4-2

137

32
137
32
137

F4-2

139

139 33

You might also like