Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

General Recommendation

1. Custody Metering System

The metering system shall be provided with N+1 metering streams, where N is the number of
streams required to meet the full flow range and other stream is standby (spare stream). The
system is designed to meet the Iraqi National Code/ API MPMS / OIML / ISO
/ASTM/IEC/ISA /API RP/IEEE/ IP/GPA standards for the custody transfer Requirements.
2. A prover unit suitable for fiscal metering systems installed in the skid shall be provided.
SUPPLIER shall guarantee that the prover unit will be suitable for the calibration at maximum,
normal and minimum flow rate of the metering unit.

3. A suitable calibration unit to calibrate the prover unit to be provided.

4. IFAT , FAT and SAT

The CONTRACTOR/COMPANY reserves the right to test and inspect the metering units prior
to the delivery in the SUPPLIER's factory. Factory tests shall include: Pre-FAT - internal test
carried out by SUPPLIER to ensure that all tests intended to be carried out as part of the FAT
under CONTRACTOR witnessing, should be executed and any faults rectified prior to FAT
execution.

IFAT (Integration FAT) with supplier shall be witnessed by COMPANY; SAT Procedure and
check list shall be submitted to COMPANY for review and approval;

FAT shall be witnessed By THIRD PARTY, BOC specialized measurements personnel,


CONTRACTOR and COMPANY representatives.

Flow Meters Calibration, Prover unit calibration, the calibration unit of prover calibration .., to
be witnessed by THIRD PARTY, BOC specialized measurements personnel, CONTRACTOR
and COMPANY representatives.

SAT on metering systems and Measurement Unit shall be performed by THIRD PARTY and
witnessed by CONTRACTOR/SUPPLIER, BOC and COMPANY
5. Training:

The SUPPLIER shall provide training courses for the COMPANY’s personnel. The SUPPLIER
in his proposal shall quote price per trainee for on-site and off-site trainings, provide training
course details, locations etc. Training shall be in English language. Training topics shall cover the
commissioning, operation and maintenance aspects of the Equipment and software.

A certificate authorizing the trainee to work independently and managing of all level software
Configurations with right to make corrections and introduce changes to the system shall be issued
by SUPPLIER upon completion of training program. The SUPPLIER shall provide appropriate
instructors, venue (for off-site training), and training Manuals, equipment & lab stations.

6. Suitable Quality Measurement Unit with Automatic Sampling System shall be supplied.

You might also like