Professional Documents
Culture Documents
Bingulcakaci Portfolyo
Bingulcakaci Portfolyo
2016-2021
Bi n g ül Çakac ı
e d u c at i o n
- MEF University
Alternative Architectural Practices/ 2021 Cycle/ Waste
Master in Architecture
september 2021- ongoing
- Akdeniz University
Bachelor’s Degree of Architecture
september 2016- july 2020
Antalya,Turkey
3
I N D E X
06 competition
18 academic
26 teamwork
28 workshop
29 organisation
5
To-Gather
To-Gather
Kaira Looro
Kaira Looro Competiton-Women’s
Competiton-Women’s House
House‘21
‘21
w/Elif
w/ElifSeyhun
Seyhun
Humans have been gathering around circles which is oldest form of
social interaction.
The fire was in the center as the people cooked and ate their food, heard stories,
worshiped their gods and goddesses, and passed down the traditions and wisdom
that kept them alive and healthy.
Our purpose with this project, revive this ancient sense of
empowering through their individual growth.
Given context illustrates, unfair income distrubution altough the capacity of women
farmers in agriculture because of the gender gap in Senegal. Besides these
socio-economic issues, there are more vital problems like hunger, drought and
desertification.As a solution,we define collective activities in three sub-catagories,
education,art and agriculture and created a sustainable workflow system between
these functions.
7
8
9
To-Gatherand Technology Development Center
ITU KOZA:Start-up
Kaira Looro
w/Mina Erten,Elif SeyhunCompetiton-Women’s House
(Architecture)/Alihan ‘21
Büyükeken,Emrah Kaya (Statics)/Harun Yüce
10 w/Elif Seyhun(Mechanical)
The basis of the design is to protect existing trees while physical
structure that the building establishes with its environment and
conceptual relationships.
The concept of knowledge, thought and invention built on the
relationship between the concept of mass which in one direction:
ongoing scientific knowledge, innovative axis with approaches and
inventions can change. As a representation of thought, Hackerspace is
also emphasize in the third dimension.
Brainstorming and interaction in Hackerspace feeds the production
process in the workshops. Therefore, offices and workshops are
located around Hackerspace.
11
The seating areas inside Hackerspace face a green wall.
It is aimed to increase the user comfort in the interior by strengthening the microclimatic effects of the green wall, by the
fact that the top windows act as a channel that directs the heated air to the outside when opened in hot summer months
and natural light is taken into the interior.
12
13
The Station
Çuhadaroğlu Alüminyum 2019 Öğrenci Proje Yarışması:Mimarlık İşliği
w/ Elif Seyhun,Mina Erten
Turning the architectural workshop spaces
into a station by creating a route between
cultural and public spaces constitutes the
backbone of our design decision.
The station, thanks to the route, becomes
an intersection where society observes the
practice of architecture.
15
characteristic
topography
-caves
-streams
-scrubs
experience of nature
16
Workshops and laboratories; The visual contact between the station and the train passing through the heart of the station is provided by the transparency of the dividing elements. In this way, other stakehol-
ders of the society will be able to observe the architectural workshop. An experimental space arrangement has been worked on, with the aim of providing a common platform for the students of architecture,
and later for interdisciplinary collaborations.
17
ArcheoCAVE
Antalya Regional Archeological Museum
ArcheoCave is located in the old city center
and surrended by artifacts from the
Hellenistic period to the Republican period.
It has emerged from the idea of being a part
of the continuity in the historical layers; the
last stop.
19
There are two shells rising from the earth in the east-west direction. This shell gives an imaginative reference to the
cave, an artificial stone* processed by human hands by leaving the concrete texture. In addition to preserving artifacts
from the past, it points to the materials and technology of its own age.
20
As a continuation of journey between the historical layers, the visitor also observes the conservation and restoration stages of the exhibits. By
transferring the conservation history,as you climb through the layers, the stages that the artifacts made visible. It is envisaged that this un-
derstanding will stimulate the visitors’ sense of curiosity, lifelong learning instinct and awareness of protection history.
In this context, the mass is placed in a transparent and elegant steel construction that centers the laboratory. The processes in which the works
are illuminated with today’s technology are made visible by means of a ramp connecting it to an upper level.
21
ARTER
Social Housing Project
Memurevleri,Antalya
AKDENİZ ÜNİVERSİTESİ MİMARLIK FAKÜLTESİ MİMARLIK BÖLÜMÜ
ANESİ
ET HAST
K DEVL
ATATÜR
YOL
18M
CADDESİ
SOKULLU
Yaya
giriş
çıkışı
BAHÇE DUVARI
BAHÇE DUVARI
%8 EĞİRAMPA
M
-1.50 -1.50
Yaya
giriş
çıkışı GİRİŞ
M.A
GİRİŞ
GİRİŞ
.ER
GİRİŞ
SOY
ORT
AOK
ULU
+15.00
(Y,X
) -354
0.20
77 ,
4375
.175
0
(Y,X)
(-24
86.
097
7,
Çocu
253
k Oy
6.1
622
)
-1.50
K
un Ala
+24.20 nı
DOĞ
AL TAŞ
DOĞ
AL TAŞ
(Y,X
) (-20
OFİS 93.7
890
(Y,X)
(-3058.1
BLOĞ , 397
7.30 964,
4241
U 84) .7294)
1/1 Sa
(Y,X tranç
) -450
5.99
(Y,X
) -42 /Dinle
38 ,463 40.386 nme
7.96
73 3 , 560
2.7683 +21.90 alanı
BAHÇE DUVARI
(Y,X)
-3058.19 (Y,X)
64 , 4241 -2661.564
.7294 8 , 5688
.3404
ÇEKM (Y,X)
E SIN -5207
.0375 (Y,X
) -48 (Y,X
) -48
IRI
, 5866 09.8
.0109 793 09.879
, 731 3 ,73
1.93 11.936
63
+18.50
3
+0.20
(Y,X)
-3625.806 (Y,X
9 , 5953 ) -419
.3642 3.74
79 ,
766
3.79
35
(Y,X)
-5772.56
94 , 7578 (Y,X
(Y,X ) -322
±0.0
.2214 ) -57
BAHÇE DUVARI
9.34
72.569 06 ,
0
7399.37
4 , 757
25
8.2214
+15.10 -1.50
A +0.20
(Y,X
-5.00 A
) -53
76.854
9, 902 (Y,X)
2.4697 -39
29.
326
9,
862
Ortak
Alan -1.50 8.2
008
ANAFAR
GİRİŞ
GİRİŞ
GİRİŞ
GİRİŞ
+15.00
TALAR CA
Ramp
a
DDESİ
%10
BAHÇE DUVARI
GÜV
ENLİ
K
Açık
Otop
ark
-1.50
DOĞ Araç
AL TAŞ
Giriş
Çıkışı
GİRİŞ
GİRİŞ
TİCAR
İ ME
KANL
DOĞ
AL TAŞ AR
+15.00
L
YO
DOĞ
AL TAŞ
Misa
fir Ot
opark
ı
22 M -1.50
BAHÇE DUVARI
Çocu
k Oy
un Ala
nı
+0.20
BAHÇE DUVARI
+15.00
GİRİŞ
GİRİŞ
GİRİŞ
GİRİŞ
BAHÇE DUVARI
-1.50
RAM
BAHÇE DUVARI
-1.50 PA -0.75
%8 EĞ
İM
Yaya
YOL
giriş
+0.20
6M
çıkışı
+0.20
A.F
ER
DA
The main purpose of the Arter project is to provide a living space where members of the society with different income levels can live together and
KA
HR
AM
AN
İ.Ö
socialize. Within the scope of the project, pedestrian movements are observed and a pedestrian axis is defined in the north-south axis. The social life
in the site is 1.5 meters below the main road level; In the basement of the apartment buildings, the pedestrian-scale integrity and permeability of the
land has been ensured by removing the dividing elements.
23
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5500
K
389 196 196 691 764 260 343 143 243 501 407 343 260 745
K
1491 745 745 244 502 750 260 746
5 6 7 8 9 10 11 12 13 14 15 787 713 53 249 114 249 172 80 115 240 229 67 80 266 249 233 80 160 228 80 38 260 80 137 80 80 216 80 37
4002
A
111
742 260 343 143 243 500 407 343 260 746
80
22 21 20 19 18 17 16 15 14 13 12
289
82
12 90 49 80 80 80 80 80 80
+4.20
80
761 720 20 229 20 482 20 730 20 243 39 80 137 80 80
10 216 80 37
+6,61
1 2 3 4 5 6 7 8 9 10 11
220
220
220
220
220
220
80
80
80
80
80
80
245
120
100
200
690
C
147
20
20
220
479
90
166
166
20
145
145
1005
377
20 34 110 33 20 34 110 33 20
219
177 177
196 196
-1,30
220
220
220
220
220
220
80
80
80
80
80
80
707
ORTAK ALAN
476
476
103,9 M²
DÖŞEME:DÖKME TERAZZO 180 166 216 216 15 90 32 80 80 80 80 80 80
DUVAR:TERAZZO KAROLAR 90
80
TAVAN:SU KONTRAPLAK
220
85
1481
1472
1500
1472
722 20 720 20
742 740
200
205
1483
720
99
720
250
D
P1 P1 P2 P1
1001
248
300
248
300
300
248
300
80
C
44
33 249 68 31 234 209
35 249 16
264
264
146 80 63 YATAK ODASI
13,4 M²
DÖŞEME:SU KONTRAPLAK
160
160
DUVAR:AHŞAP DUVAR PARKESİ
P3
TAVAN:SU KONTRAPLAK
300
279
612
480
582
E
610
206 185
1503
1505
426
476
1480
435
445
20
1481
300
70
EBEVEYN YATAK ODASI
220
350
90
1479 16,7 M²
20
537
540
289
10
DÖŞEME:SU KONTRAPLAK
YATAK ODASI
DUVAR:AHŞAP DUVAR PARKESİ
498 482 498 TAVAN:SU KONTRAPLAK 95 12,8 M²
201 ÇOCUK YATAK ODASI K2
DÖŞEME:SU KONTRAPLAK 15,5 M²
210 138
90
62
DUVAR:AHŞAP DUVAR PARKESİ BANYO BALKON
TAVAN:SU KONTRAPLAK
DÖŞEME:SU KONTRAPLAK 5 34 3,4 M²
DUVAR:AHŞAP DUVAR PARKESİ 3,8 M² 187
740
740
241
260
260
TAVAN:SU KONTRAPLAK DÖŞEME:DÖKME TERAZZO DÖŞEME:SU KONTRAPLAK
241
333
DUVAR:TERAZZO KAROLAR DUVAR:AHŞAP DUVAR PARKESİ
TAVAN:SU KONTRAPLAK TAVAN:SU KONTRAPLAK
80
80
215
213
225
K1
220
220
HOL
90
3 M²
-1,30
D
DÖŞEME:SU KONTRAPLAK
158
10
50 137 DUVAR:AHŞAP DUVAR PARKESİ
17
K2 K4
F
TAVAN:SU KONTRAPLAK
220
120
995
80 90 7 85 208
90
77
100
90
90
75
75
K1 K2 K2
220 220
100
220
72
20
100
200
22
190
8
E. BANYO
106
5,4 M²
20
DÖŞEME:DÖKME TERAZZO HOL 480
11,5 M² 190
86
78
80
50
K3 DUVAR:TERAZZO KAROLAR
146
146
271
264
264
80
11 12 13 14 15 16 17 18
P4
122
TAVAN:SU KONTRAPLAK
80
+0,14 250 DÖŞEME:SU KONTRAPLAK
80
115
ÇEKİRDEK 336 60 DUVAR:AHŞAP DUVAR PARKESİ 100 160
160
194 60 129
160
7,2 M²
P3
TAVAN:SU KONTRAPLAK
186
BANYO
300
685
DÖŞEME:TERAZZO
169
ÇAMAŞIR ODASI
80
245
211
4,8 M² 289
170
DUVAR:AHŞAP DUVAR PARKESİ 4,2 M² SALON
DÖŞEME:DÖKME TERAZZO
80
80
100
K1 11 M²
119
TAVAN:SU KONTRAPLAK DÖŞEME:SU KONTRAPLAK
220 DUVAR:TERAZZO KAROLAR
DÖŞEME:SU KONTRAPLAK
108
80
80
DUVAR:SUKONTRAPLAK K1
220
20
TAVAN:SU KONTRAPLAK
120
88
E
115
200 280
104
104
36
20
10
H
83
A
83
A
10 9
141
34
49
165
460
498
10
670
94
103
±0.00
108
8
MUTFAK
YANGIN MERDİVENİ
120
5,5 M²
81
81
289
I
17,5x19/25 25 9,8 M² 452 MUTFAK DÖŞEME:DÖKME TERAZZO
260
260
240
233 160
160
7,2 M² DUVAR:TERAZZO KAROLAR
120 225 DÖŞEME:TERAZZO
160
100
240
BALKON
250
P3
DÖŞEME:DÖKME TERAZZO
10 9 8 7 6 5 4 3 2 1 DUVAR:TERAZZO TAVAN:SU KONTRAPLAK
11,3 M²
300 P1 P2 P3 P2
209
DUVAR:TERAZZO KAROLAR 29 115
GİRİŞ HOLÜ 89 10 237
20
115
DUVAR:AHŞAP DUVAR PARKESİ
180
K4
721
156
DÖŞEME:SU KONTRAPLAK
220
110
TAVAN:SU KONTRAPLAK
166
249
209
248
300
300
300
300
20
721
160
K5 DUVAR:AHŞAP DUVAR PARKESİ
199
220 -0,40
80
80
-1,30
TAVAN:SU KONTRAPLAK
89
F
11 12 13 14 15 16 17 18 19
P2
151
151
35
35
1 4 3 2 5 6 7
21 20
107
100
36
1000
K3 18x18/25
100
200
117
300
145 200 180 115 39 150
10
942
80
25
950
100
10 80
45
200
145 80
A
48 249 68 80 6 161 227 80 18
86
86
146
K3
146
80
11 12 13 14 15 16 17 18
67 80 207
122
9 115
ÇEKİRDEK 336 220
160
746
7,2 M²
236
G
746
211
216
8,8 M² DUVAR:SU KONTRAPLAK 3,6 M²
160
160
SİSTEM DETAYI 492
231
160
100
SALON
P3
DÖŞEME:SU KONTRAPLAK TAVAN:SU KONTRAPLAK DÖŞEME:DÖKME TERAZZO
70
25,3 M² DUVAR:TERAZZO KAROLAR
300
20
DUVAR:AHŞAP DUVAR PARKESİ
100
115
ORTAK ALAN DÖŞEME:SU KONTRAPLAK K3 TAVAN:SU KONTRAPLAK
200
TAVAN:SU KONTRAPLAK
103,9 M² DUVAR:AHŞAP DUVAR PARKESİ
SİRKÜLAYSYON
104
TAVAN:SU KONTRAPLAK
104
DÖŞEME:DÖKME TERAZZO 38 M² 355
242
257
257
H A
DUVAR:TERAZZO KAROLAR
242
DÖŞEME:DÖKME TERAZZO(FARKLI RENKLERDE) 498 482
TAVAN:SU KONTRAPLAK
4500
4500
TAVAN:SU KONTRAPLAK 362
10 9
29
165
145
102
49
460
228
470
470
-1,30 80
291
495
EBEVEYN YATAK ODASI
80
P2
17 M²
80
8
115 300
200
DÖŞEME:SU KONTRAPLAK
73 322 228 20 482 20 730 20 YANGIN MERDİVENİ 131 72
81
81
25 40 BANYO 36
I
DUVAR:AHŞAP DUVAR PARKESİ
17,5x19/25 9,8 M²
YATAK ODASI 4,4 M²
2002
J
TAVAN:SU KONTRAPLAK
120 225 137
100
DÖŞEME:TERAZZO 16,6 M² DÖŞEME:DÖKME TERAZZO
20 708 20 482 20 250 347 110 26 10 9 8 7 6 5 4 3 2 1 DUVAR:TERAZZO
3505
3502
20
TAVAN:TERAZZO EBEVEYN YATAK ODASI
DUVAR:AHŞAP DUVAR PARKESİ TAVAN:SU KONTRAPLAK
+7,05 +5,30 +6,56
1499
24 M²
180
20
TAVAN:SU KONTRAPLAK
229
741
20
20
220
285
313
741
40
80
209
DÖŞEME:SU KONTRAPLAK
20
K5
199
90
9
220 90 8 267 DUVAR:AHŞAP DUVAR PARKESİ
184
164
256 10
6
11 12 13 14 15 16 17 18 19 TAVAN:SU KONTRAPLAK
154
190 20
154
1 4 3 2 5 6 7 K1
107
249
100
107 142 K3
90
18x18/25
ORTAK ALAN 145 200 180 115 39 150 117
95
942 112 36K2
İ
107,6 M²
25
220
220
220
100
HOL
200
90
90
DÖŞEME:DÖKME TERAZZO
-1,30
189
8 M²
1020
DUVAR:TERAZZO KAROLAR
261
261
DÖŞEME:SU KONTRAPLAK
TAVAN:SU KONTRAPLAK
14
K2 DUVAR:AHŞAP DUVAR PARKESİ
K2
P4 P4 P2 P2
TAVAN:SU KONTRAPLAK
-1,30
HOL
100
11 M² 80
100
100
122
DÖŞEME:SU KONTRAPLAK K1
SİSTEM DETAYI 220
143
98
DUVAR:AHŞAP DUVAR PARKESİ
352
300
300
300
248
TAVAN:SU KONTRAPLAK BANYO
492
80
60
80
60
80
80
K
GİRİŞ HOLÜ 5,8 M²
160
±0.00
43 115 579 90 29 90 6
160
36 50
50
YATAK ODASI
255
255
12,5 M² DÖŞEME:DÖKME TERAZZO
50
P3
1002
80
TAVAN:SU KONTRAPLAK
P2
P1 DUVAR:AHŞAP DUVAR PARKESİ DÖŞEME:SU KONTRAPLAK
80
80
300 TAVAN:SU KONTRAPLAK
90 DUVAR:AHŞAP DUVAR PARKESİ
200
100
95
95
TAVAN:SU KONTRAPLAK
+0,45 K2
220
311
390 100 10 451
80
10
18x18/25 K3 K1
220
83
148
148
82
7 6 5 4 3 2 1 E. BANYO
-1,30 4,2 M²
187
L B
DÖŞEME:DÖKME TERAZZO
133
153
718
WC
11 12 13 14 15 16 17 18 19
128
133
718
10
2,8 M² DUVAR:TERAZZO KAROLAR
54
8
10
DÖŞEME:DÖKME TERAZZO TAVAN:SU KONTRAPLAK
-0,40 DUVAR:TERAZZO KAROLAR EBEVEYN YATAK ODASI
243
7
TAVAN:SU KONTRAPLAK 17 M²
248 208
94
P1
BANYO 163 45
10
E. BANYO DÖŞEME:SU KONTRAPLAK
80DÖŞEME:DÖKME
6
300 4,5 M²
B
5,4 M² DUVAR:AHŞAP DUVAR PARKESİ K1 TERAZZO MUTFAK
DÖŞEME:DÖKME TERAZZO
220DUVAR:TERAZZO GİRİŞ HOLÜ
228
TAVAN:SU KONTRAPLAK
5
KAROLAR 11,9 M²
259
215
215
260
80
DUVAR:TERAZZO KAROLAR 13,8 M²
380 TAVAN:SU KONTRAPLAK DÖŞEME:DÖKME TERAZZO 501
242
80
DÖŞEME:SU KONTRAPLAK
P2
TAVAN:SU KONTRAPLAK
85
DUVAR:TERAZZO KAROLAR
P4 P4 P2 P2
4
MUTFAK
300
220
8
DUVAR:AHŞAP DUVAR PARKESİ
80
TAVAN:SU KONTRAPLAK
847
12 M²
185
185
TAVAN:SU KONTRAPLAK
501
3
DÖŞEME:DÖKME TERAZZO
10 9
100
160 482
160
DUVAR:TERAZZO KAROLAR
104
347 18
160
P3
300
300
TAVAN:SU KONTRAPLAK
2
K1
300
60
60
80
80
80
80
K
68
M
69
1
240
980
1004
200
100
111
6
379 481 10 111 128 +7,05
149
GİRİŞ HOLÜ 10 101 218 80
10 M² 19 23 104 80 10 80 17
113 150 64 115 18
-1,30 80
761
178
61
100
61
DÖŞEME:SU KONTRAPLAK
10
80
18x18/25
+0,14 K1
148
K3
148
DUVAR:AHŞAP DUVAR PARKESİ
E. BANYO
220
123
20164601022-BİNGÜL ÇAKACI
7 6 5 4 3 2 1
90
4,2 M²
K3
233
233
TAVAN:SU KONTRAPLAK 327 18
200
223
9
DÖŞEME:DÖKME TERAZZO
212
L
K2 25
744
11 12 13 14 15 16 17 18 19
B
11 12 13 14 15 16 17 18 80
220
DUVAR:TERAZZO KAROLAR
122
197
80
P2
8
TAVAN:SU KONTRAPLAK
K3
80
230
230
300 +6,56 WC EBEVEYN YATAK ODASI
7
248
249
2,8 M²
372
17 M²
1354
200
P1
B
DÖŞEME:DÖKME TERAZZO
100
DÖŞEME:SU KONTRAPLAK
6
13 109 249 119 208 27 ÇEKİRDEK DUVAR:TERAZZO KAROLAR
TAVAN:SU KONTRAPLAK
184 DUVAR:AHŞAP DUVAR PARKESİ 300
20
7,2 M²
TAVAN:SU KONTRAPLAK
5
90
DÖŞEME:DÖKME TERAZZO
DUVAR:SU KONTRAPLAK 6 80 36
140
4
K2
220
25
220
8
TAVAN:SU KONTRAPLAK
14020
80
185
185
405
405
SALON
50
145
3
100
E. BANYO 29 M²
10 9
+5,30
SALON
210
3,5 M²
80 23,4 M² 208 DÖŞEME:SU KONTRAPLAK
15 27
210
2
137
BANYO K1
140
DÖŞEME:DÖKME TERAZZO YATAK ODASI DÖŞEME:SU KONTRAPLAK DUVAR:AHŞAP DUVAR PARKESİ
25
117
BANYO K1 250
220
M
131
243
4,2 M² 240 TAVAN:SU KONTRAPLAK
DUVAR:TERAZZO KAROLAR 11 M²
248 DUVAR:AHŞAP DUVAR PARKESİ
1
4,2 M²
83
TAVAN:SU KONTRAPLAK DÖŞEME:DÖKME TERAZZO TAVAN:SU KONTRAPLAK 6 81 230
P1
DÖŞEME:DÖKME TERAZZO DÖŞEME:SU KONTRAPLAK
DUVAR:TERAZZO KAROLAR
DUVAR:TERAZZO KAROLAR DUVAR:AHŞAP DUVAR PARKESİ
300
51
TAVAN:SU KONTRAPLAK GİRİŞ HOLÜ
9 M² TAVAN:SU KONTRAPLAK TAVAN:SU KONTRAPLAK GİRİŞ HOLÜ
DÖŞEME:SU KONTRAPLAK 20 10 115 10 M²
270
+5,30
267
183
100
213
170
DÖŞEME:SU KONTRAPLAK
11
DUVAR:AHŞAP DUVAR PARKESİ
+7,10
739
80 80 TAVAN:SU KONTRAPLAK
120 120 DUVAR:AHŞAP DUVAR PARKESİ
115
115
K3
90
75
80 TAVAN:SU KONTRAPLAK
152
P4
120
120
200
115
K1
P2
90
90
80
BALKON BALKON
220
K4 K4 K2
60 11 12 13 14 15 16 17 18
117
80
300 220 6,4 M²
109 249 124 220 6,7 M²
220
N
K3
82 250 DÖŞEME:SU KONTRAPLAK DÖŞEME:SU KONTRAPLAK 117
220
115 208
44
2
TAVAN:SU KONTRAPLAK TAVAN:SU KONTRAPLAK
200
100
25
22
22
42
5 10
49
32
7
27
27
13
K1
90
38
BANYO
90
K2
EBEVEYN YATAK ODASI
K2
4,2 M²
DÖŞEME:DÖKME TERAZZO
220
111
427
80 13 M² E. BANYO
220
75
DUVAR:TERAZZO KAROLAR
P2
3,5 M²
80
146
DÖŞEME:SU KONTRAPLAK TAVAN:SU KONTRAPLAK
141
300
143
DÖŞEME:DÖKME TERAZZO BANYO K1 YATAK ODASI
DUVAR:AHŞAP DUVAR PARKESİ
220
300
300
248
248
248
249
DUVAR:TERAZZO KAROLAR 4,2 M² 11 M²
TAVAN:SU KONTRAPLAK 191 TAVAN:SU147
KONTRAPLAK
P1
DÖŞEME:DÖKME TERAZZO DÖŞEME:SU KONTRAPLAK
176
55 208 DUVAR:TERAZZO KAROLAR DUVAR:AHŞAP DUVAR PARKESİ
300
240
239
238
GİRİŞ HOLÜ
240
275
275
TAVAN:SU KONTRAPLAK TAVAN:SU KONTRAPLAK
HOL MUTFAK P1 P1 9 M²
3,4 M² 6,8 M² DÖŞEME:SU KONTRAPLAK
12 80
117
DÖŞEME:DÖKME TERAZZO 55
179
BALKON DUVAR:AHŞAP DUVAR PARKESİ
DÖŞEME:SU KONTRAPLAK
204
DUVAR:AHŞAP DUVAR PARKESİ
DUVAR:TERAZZO KAROLAR 9,6 M² 80 80 TAVAN:SU KONTRAPLAK
80
80
80
P4
TAVAN:SU KONTRAPLAK K1
80
TAVAN:SU KONTRAPLAK DÖŞEME:SU KONTRAPLAK
K4 60 220 393
N
DUVAR:AHŞAP DUVAR PARKESİ 67 100 210
MUTFAK
220
TAVAN:SU KONTRAPLAK
220
80
120
-1.30
6,7 M²
17
17
14
34
39
248
1500
1000
DÖŞEME:DÖKME TERAZZO
54
SU ÖGESİ(DURGUN)
DUVAR:TERAZZO KAROLAR
30
K1
80 TAVAN:SU KONTRAPLAK
10
75
P2
12 80 308
EBEVEYN YATAK ODASI 90
111
300
101
K2
80
111
13 M²
220
90
201
80
P2
DÖŞEME:SU KONTRAPLAK
80
401
7 300 DUVAR:AHŞAP DUVAR PARKESİ
TAVAN:SU KONTRAPLAK HOL 191
196
3,4 M²
1220
240
DÖŞEME:SU KONTRAPLAK
240
400 MUTFAK
747
747
DUVAR:AHŞAP DUVAR PARKESİ
22
80 SALON+MUTFAK 6,8 M²
75
DÖŞEME:DÖKME TERAZZO
122
41 M² BALKON
-1.30
22,5 M²
300
123
MUTFAK DUVAR:TERAZZO KAROLAR 9,6 M² 27
DÖŞEME:SU KONTRAPLAK DÖŞEME:SU KONTRAPLAK TAVAN:SU KONTRAPLAK
6,7 M² DÖŞEME:SU KONTRAPLAK
DUVAR:AHŞAP DUVAR PARKESİ DUVAR:AHŞAP DUVAR PARKESİ DÖŞEME:DÖKME TERAZZO
K4
DUVAR:AHŞAP DUVAR PARKESİ
TAVAN:SU KONTRAPLAK TAVAN:SU KONTRAPLAK DUVAR:TERAZZO KAROLAR
227
TAVAN:SU KONTRAPLAK
220
235
120
TAVAN:SU KONTRAPLAK
-1.50
980
SU ÖGESİ(DURGUN)
24
972
44
80
80
P2
500
300
221
190 9 117 7
201
12
176
249
248 80 SALON+MUTFAK
725
725
725
725
SALON
80
P2
P1
22,5 M² 41 M²
85
BALKON DÖŞEME:SU KONTRAPLAK
DUVAR:AHŞAP DUVAR PARKESİ DUVAR:AHŞAP DUVAR PARKESİ
5,5 M²
167
TAVAN:SU KONTRAPLAK TAVAN:SU KONTRAPLAK
DÖŞEME:SU KONTRAPLAK
410
-1.50
DUVAR:AHŞAP DUVAR PARKESİ
120 TAVAN:SU KONTRAPLAK
39 13
80 K4
80
220
P2
300
221
I
221
55
13
248
77
249
249
P1
BALKON
240
300
5,5 M²
120
DÖŞEME:SU KONTRAPLAK
120
120
DUVAR:AHŞAP DUVAR PARKESİ
TAVAN:SU KONTRAPLAK
120
300
300
80
248
248
K4
220
80 35
P2
300 80 102
I
249 249 369
35
50
P1 P1
27
6
ZEMİN KAT (-1,30 )PLANI
518 483 732 501 270 102 249 152 241 123 249 389 122
300
300
248
248
996 1501 502 240 760
In Arter, steel construction and wood-coated sandwich panels are used instead of conventional construction techniques due to the pace of life and variability of its time. are separated by the elevation difference.
24
DÖKME TERAZZO(4CM)
KORUMA BETONU(5CM)
SU YALITIMI(3+3MM)
LAMİNE AHŞAP DIŞ CEHPE KAPLAMASI ISI YALITIMI(5CM)
EĞİM BETONU(5CM)
AKDENİZ ÜNİVERSİTESİ MİMARLIK FAKÜLTESİ MİMARLIK BÖLÜMÜ U PROFİL(20MM) SU YALITIMI(3+3 MM)
BETON+TRAPEZ
CRC BOARD(3.2CM) YALITIM+DEMİR KONSTRÜKSİYON
SU KONTRAPLAK(2.4CM)
YALITIM(SU(3+3MM)+ISI(10MM)
ÇAKIL
FİLTRE(GEOTEKSTİL) UYGULAMA PROJESİ 1 FİNAL TESLİMİ 02.01.19 CRC BOARD(3.2CM)
AKDENİZ ÜNİVERSİTESİ MİMARLIK FAKÜLTESİ MİMARLIK BÖLÜMÜ UYGULAMA PROJESİ 1 FİNAL TESLİMİ 02.01.19
POLİETİLEN FOLYO
MEMBRAN
GEOTEKSTİL KEÇE
BETON+TRAPEZ
YALITIM+DEMİR KONSTRÜKSİYON
2.4 cm SU KONTRAPLAK
2530
DÖKME TERAZZO(4CM)
IPE200 ÇELİK KİRİŞ
KORUMA BETONU(5CM)
SU YALITIMI(3+3MM)
ISI YALITIMI(5CM)
EĞİM BETONU(5CM)
SU YALITIMI(3+3MM)
BETON+TRAPEZ
YALITIM+DEMİR KONSTRÜKSİYON
SU KONTRAPLAK(2.4CM)
7(5$==2
7(5$==2
NDUR
LAMİNE AHŞAP DIŞ CEHPE KAPLAMASI
YALITIM+DEMİR KONSTRÜKSİYON
7(5$==2
2230
IPE200 ÇELİK KİRİŞ+ISI YALITIMI
U PROFİL
SU YALITIMI(3+3MM)
ISI YALITIMI(5CM) CRC BOARD
EĞİM BETONU(5CM)
SU YALITIMI(3+3MM)
&068.2175$3/$. BETON+TRAPEZ
&068.2175$3/$. 7(5$==2
7(5$==2NDUR
SU KONTRAPLAK(2.4CM)
YALITIM(SU+ISI)
YALITIM+DEMİR KONSTRÜKSİYON
7(5$==2
1890
SU KONTRAPLAK
&068.2175$3/$. &068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON
YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$. &068.2175$3/$.
<$/,7,0/,&$0
7(5$==2NDUR
YALITIM+DEMİR KONSTRÜKSİYON
1550
IPE200 ÇELİK KOLON
7(5$==2
&068.2175$3/$. &068.2175$3/$.
7(5$==2
7(5$==2NDUR
1210
YALITIM+DEMİR KONSTRÜKSİYON
7(5$==2
ALÜMİNYUM KORKULUK
&068.2175$3/$. &068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$. &068.2175$3/$.
&068.2175$3/$.
7(5$==2
7(5$==2NDUR
YALITIM+DEMİR KONSTRÜKSİYON
7(5$==2
870
YALITIM+DEMİR KONSTRÜKSİYON(40*40MM KUTU PROFİL)
&068.2175$3/$.
&068.2175$3/$. &068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$. 7(5$==2
7(5$==2NDUR &068.2175$3/$.
7(5$==2
530
&068.2175$3/$.
%$ DÖŞEME
&068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON YALITIM+DEMİR KONSTRÜKSİYON
TESVİYE BETONU
&068.2175$3/$. 7(5$==2
7(5$==2NDUR &068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON
ÇAKIL
7(5$==2
190
7(0(/
TESVİYE BETONU
.2580$%(7218
7(0(/
<$/,7,0
.2580$%(7218
%/2.$-
<$/,7,0
DÖKME TERAZZO(4CM) &068.2175$3/$. SIKIŞTIRILMIŞ TOPRAK
%/2.$- %(72175$3(=PP
YALITIM+DEMİR KONSTRÜKSİYON
DEMİR KONSTRÜKSİYON+YALITIM
68.2175$3/$.&0 &068.2175$3/$.
SIKIŞTIRILMIŞ TOPRAK YALITIM+DEMİR KONSTRÜKSİYON
7(5$==2
-150 A-A KESİTİ
13 12 11 10 9 8 7 6 5 4 3 2 1
DRENAJ(20CM ÇAPLI)
2230
.2580$%(7218
2530
+24,90 DÖKME TERAZZO(4CM)
%/2.$-
SU YALITIMI(3+3MM)
MAKİNE DAİRESİ
DÖKME TERAZZO
BETON+TRAPEZ
YALITIM+DEMİR KONSTRÜKSİYON 7(5$==2
&0.$52
SU KONTRAPLAK(2.4CM)
DEMİR KONSTRÜKSİYON+YALITIM
%(72175$3(=
68.2175$3/$.&0
1890
SIKIŞTIRILMIŞ TOPRAK
EĞİM BETONU(5CM)
SU YALITIMI(3+3MM)
&068.2175$3/$. &068.2175$3/$.
BETON+TRAPEZ
YALITIM+DEMİR KONSTRÜKSİYON
+20,00 YALITIM+DEMİR KONSTRÜKSİYON 7(5$==2
&0.$52 YALITIM+DEMİR KONSTRÜKSİYON
1550
1890
SİSTEM DETAYI
&068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$.
7(5$==2
&0.$52
DEMİR KONSTRÜKSİYON+YALITIM
YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$.
1/20
68.2175$3/$.&0
+16,00
1210
1550 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
routines. &068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$.
&068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$.
7(5$==2
&0.$52
DEMİR KONSTRÜKSİYON+YALITIM
68.2175$3/$.&0
&068.2175$3/$.
YALITIM+DEMİR KONSTRÜKSİYON
&068.2175$3/$.
870
+12,00 1210
530
870
TESVİYE BETONU
+8,00
&068.2175$3/$. &068.2175$3/$.
%$ DÖŞEME 7(0(/
YALITIM+DEMİR KONSTRÜKSİYON 7(5$==2
&0.$52 YALITIM+DEMİR KONSTRÜKSİYON
TESVİYE BETONU
.2580$%(7218
68.2175$3/$.&0
ÇAKIL
190
7(0(/ zemin kat planı
530
.2580$%(7218
<$/,7,0
<$/,7,0
%/2.$-
%(72175$3(=PP %(72175$3(=PP
DEMİR KONSTRÜKSİYON+YALITIM DEMİR KONSTRÜKSİYON+YALITIM DEMİR KONSTRÜKSİYON+YALITIM
68.2175$3/$.&0 68.2175$3/$.&0 68.2175$3/$.&0
-150
B-B KESİTİ
190
c
1/100 SIKIŞTIRILMIŞ TOPRAK
0,00
b
107 249 142
-150
a
GÜNEY CEPHESİ
1/100
300
248
tip kat planı +2.20
+5,60
+9,00
+12,40
+15,80
+19,20
P1
1 2 3 4 6 8 9 10 11 12 13
20164601022-BİNGÜL ÇAKACI
+27,90
+25,30
+24,90
25
+24,00
+22,30
27
Tasarım,Sanat ve Düşünce Topluluğu(TSD)
Design,Art and Tought Community 2019-2020
28 poster designs made by bingül çakacı
Nesin Mimarlık Yaz Okulu-I (2018) Nesin Mimarlık Yaz Okulu-I (2018)
Workshops
upper/from left to right: Betonart,BTF’18,Depo Pergamon Nesin Mimarlık Yaz Okulu-I (2018) Nesin Mimarlık Yaz Okulu-I (2018)
OVADA YAPI ATÖLYESİ Gabion Duvar ve Jeodezik Kubbe Uygulaması
downer/Ovada I-II,Nesin Sanat Köyü,TAK Kapadokya 29
CONTACT
bingulcakacii@gmail.com in/bingül-çakacı-961983142
@experi.ments (+90) 539 356 28 96