Mechanical Data Sheet For Nitrogen Hold-UP RECEIVER 320-00-V-005A
Mechanical Data Sheet For Nitrogen Hold-UP RECEIVER 320-00-V-005A
Mechanical Data Sheet For Nitrogen Hold-UP RECEIVER 320-00-V-005A
APPROVED FOR
00 18-Mar-21 AFC M.Bertolotto M.Di Ruvo G.Stagni
CONSTRUCTION
This document is property of the COMPANY and it shall not be disclosed to third parties, or reproduced, without permission of the COMPANY. This
document is tracked by Integrated Document Management System (IDMS). When it is printed, it shall be considered as “For information only”. The controlled
copy is the IDMS version, and thus, it is the document holder’s responsibility to make sure that the latest version is in use.
ENGINEERING, PROCUREMENT &
CONSTRUCTION OF PRODUCED WATER
TREATMENT & WATER INJECTION
FACILITIES EXPANSION PHASE 1, WEST
QURNA-2 (PHASE 2) CONTRACT AREA
MECHANICAL DATA SHEET FOR NITROGEN HOLD-UP RECEIVER 320-00-V-
Rev.: 00 Status AFC
005A
COMPANY Doc, No.: 8015-0151-SC03-22-320-ME-DS-00005
Page: 2 of 6
CONTRACTOR Doc, No.: IQ077-00-1621-EN-0301
DATE
REV STATUS UPDATE / AMENDMENT DETAILS
ISSUED
A IDC 09-Nov-20 ISSUED FOR INTERNAL DISCIPLINE CHECK
B IFR 28-Dec-20 ISSUED FOR REVIEW
C IFR 26-Jan-21 ISSUED FOR REVIEW
D IFA 22-Feb-21 ISSUED FOR APPROVAL
00 AFC 18-Mar-21 APPROVED FOR CONSTRUCTION
ENGINEERING, PROCUREMENT &
CONSTRUCTION OF PRODUCED
WATER TREATMENT & WATER
INJECTION FACILITIES EXPANSION
PHASE 1, WEST QURNA-2 (PHASE 2)
MECHANICAL DATA SHEET FOR NITROGEN HOLD-UP RECEIVER 320-00-V-005A Rev.: 00 Status AFC
This document is Company property. The Company lawfully reserves all rights.
ENGINEERING, PROCUREMENT &
CONSTRUCTION OF PRODUCED WATER
TREATMENT & WATER INJECTION
FACILITIES EXPANSION PHASE 1, WEST
QURNA-2 (PHASE 2) CONTRACT AREA
MECHANICAL DATA SHEET FOR NITROGEN HOLD-UP RECEIVER 320-00-V-005A Rev.: 00 Status AFC
Note 4, 12, 14
This document is Company property. The Company lawfully reserves all rights.
ENGINEERING, PROCUREMENT &
CONSTRUCTION OF PRODUCED
WATER TREATMENT & WATER
INJECTION FACILITIES EXPANSION
PHASE 1, WEST QURNA-2 (PHASE 2)
MECHANICAL DATA SHEET FOR NITROGEN HOLD-UP RECEIVER 320-00-V-
Rev.: 00 Status AFC
005A
COMPANY Doc. No.: 8015-0151-SC03-22-320-ME-DS-00005
Page: 5 of 6
CONTRACTOR Doc. No.: IQ077-00-1621-EN-0301
SKETCH
This document is Company property. The Company lawfully reserves all rights.
ENGINEERING, PROCUREMENT & CONSTRUCTION
OF PRODUCED WATER TREATMENT & WATER
INJECTION FACILITIES EXPANSION PHASE 1, WEST
QURNA-2 (PHASE 2) CONTRACT AREA
MECHANICAL DATA SHEET FOR NITROGEN HOLD-UP RECEIVER 320-00-V-005A Rev.: 00 Status AFC
COMPANY Doc. No.: 8015-0151-SC03-22-484-ME-DS-00005
Page: 6 of 6
COTRACTOR Doc. No.: IQ077-00-1621-EN-0301
1 Notes
2
3 1. DELETED
4 2. Liquid accumulation during operation will be extremely low.
5 3. Steam-out is not applicable to this vessel
6 4. DELETED
7 5. Dimensions given are in mm., unless specified differently
8 6. For Ambient conditions, Utilities and Codes Pls. See the following Document:
9 8015-0151-SC03-00-000-AL-BD-00001 "Design Basis and Basic Engineering Design Data"
10 7. Thickness is preliminary and shall be confirmed by Vendor.
25 Vendor to verify preliminary calculations.
26 8. Vendor should supply the anchor bolts designed according to the Project Standards.
27 9. Installed gaskests and blind flanges (for transport) to be supplied.
28 10. Vessels supply and weights shall be including the following items:
29 - Ladders (internal / external) , access platforms, supports for instruments and piping
30 - Lifting lugs, tailing lugs,etc
31 - Manways complete of flanged covers and Davit.
32 11. Scope of supply, Design, Inspections, Tests and fabrication and Documentation required shall be as per Material Requisition
33 8015-0151-SC03-22-320-ME-RQ-00005 and related documents stated therein
34 12. Nozzle orientation and projection is in hold . Shall be confirmed at a later stage.
35 13. CODE AND STANDARDS
36 Applicable ASME, U stamp.
37 14. Connections shall be according to Doc. "Vessel Std. Drawings" 8015-0151-SECL-00-000-MS-ST-00001
38 All flanges shall be RF acc. To ASME B16.15 with facing 125 to 250 min aarh
39 15. Gaskets thickness acc. To ASME B 16.20
40 16. Painting shall be acc. to Spec. 8015-0151-SECL-00-000-PI-SP-00003 Engineering Design Specification for Painting
41
42
43 * : VENDOR TO ADVISE
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72