Professional Documents
Culture Documents
Foundation-1.5 SA & DA
Foundation-1.5 SA & DA
Foundation-1.5 SA & DA
300 SQ.
Ø180
SECTION B-B
Customer :
650 4 NOS. M24 x 750LG. Patna Smart City Ltd.
FOUNDATION J. BOLTS
ON 275 P.C.D. System Integrator :
100
F.G.L. F.G.L.
L&T Smart World
3 THK. Safe & Smart Cities | Communication
Ø50 PVC PIPE FOR TEMPLATE
SCALE 1 : 5
Project Name :
CABLE ENTRY
Selection of Master Systems Integrator (MSI) to Design,
Development, Implementation, Operations & Maintenance of
Command and Control Centre (CCC), CCTV Surveillance, Smart
B B
GENERAL NOTES :- Traffic Solution and Integration of various ICT components with
Integrated Command and Control Center Platform (ICCC)
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
T1 - Ø12 - 8 NOS 2. MATERIAL & CONSTRUCTION TO BE IN ACCORDANCE WITH IS : Drawing No. Rev.
456 POB-LE21M915-TEDD-ED-0500-0323 1
1350