2.3.1 Packing
Storage life depends on the types of packing material and drying agent being used. Unless otherwise stated, items
should remain in the original packing. The storage time indicated in the delivery documents shall not be exceeded.
INFORMATION Immediately unpack modules in damaged packing. Parts supplied sealed in plastic
or aluminium foil without damages shall be handled with care and shall not be un
packed until shortly before required.
If the storage period exceeds the period for the provided corrosion protection, the packaging will not be covered
by the warranty meaning that equipment may be subject to moisture infiltration and consequential equipment
damages. HITACHI ENERGY is not responsible for any damages which occurred to the equipment during the
storage period for which the purchaser is in charge of.
1HDG518623A 2.31
Hitachi ABB Power Grids Product Manual ELK-04 C, 145kV
Delivery
2.3.4 Classification
Every product must be protected from being damaged. This requires a definition of the individual storage condi
tions. The classification will be defined from A through F as follows:
A B C
F
D
E
Classification A B C D E F
Paints D
Robust switchgear D
Aluminium parts D
1HDG518623A 2.32
Hitachi ABB Power Grids Product Manual ELK-04 C, 145kV
Delivery
Classification A B C D E F
Mechanical damage D D D D D D
Salty air D D D D
Detrimental humidity D D D
Dust pollution D D
Temperatures below −5 °C D
Classification A B C D E F
Fully enclosed D D
With ventilation D
With tarpaulin at minimum 400 mm above the product, sloped for water shedding D
1HDG518623A 2.33
Hitachi ABB Power Grids Product Manual ELK-04 C, 145kV
Delivery
GIS bays and Store in the original pack Refer to Instructions for
subassemblies ing F Installation and Com
missioning
If delivered on heavy
goods vehicle
C
Control Electrical Store in the original pack Measure humidity ev Touch up any damages
cabinets, equipment ing ery 6 months to the paint finish
control B
centers If relative humidity ex
ceeds 60 %, renew
drying agent
Bushings Porcelain Do not bend during stor Check every Clean the surfaces with
and age 12months whether all Rivolta MTX forte
silicon parts are dry; if not, re
Bushings with sealing B fer to Checks before
rings − refer to rubber Use"
parts below
Make sure that the
Refer to the instructions parts are not subject
on the packing to stress of any kind
Flat gaskets Rubber Store in the original pack Check elapsed stor If necessary, clean with
orings ing age time soap and water or a
oseals solution of 1.5 % soda
sealing rings Protect from compres Check surfaces for in water
sion, tension and twisting scoring or scratches
B
Protect from direct sun Check the condition of Rinse with clear water
light and artificial light with the vulcanized joints after cleaning
a high ultra violet con
tents Note:
The water temperature
Do not store together must be equal to the
with copper, manganese ambient temperature
metals or plastic foils
Steel sections Hot dipped Material must be stored Check tarpaulins for Remove the white rust
galvanized on beams raised at mini damages and replace, preventive coating
mum 30cm above the if necessary
floor E
1HDG518623A 2.34
Hitachi ABB Power Grids Product Manual ELK-04 C, 145kV
Delivery
Silver plated al Galvanic The parts can be Check elapsed stor Remove the transport
uminium and and special stacked, but must be se age time packing
copper processes cured against any move
ment Randomly check silver Degrease the silver
plated surfaces plated surfaces with
Flexible copper and alu B Rivolta MTX forte
minium connections shall Check cycle: every Fully remove all remain
be stored in an upright 6months in the first ing spots and marks
position and slotted into year, every 12 months
each other thereafter Grease the contact sur
faces with acid free pe
Check 6 months prior troleum jelly (vaseline)
to use and protect them with
crepe paper
Castings, sheet Aluminium Store in the original crates Check for water pene Use in accordance with
metal, sections tration after heavy rain manufacturer’s instruc
and tubes out Crates must be stored on D fall tions
of aluminiumm beams raised at minimum
30 cm above the floor Check tarpaulins for
damages and replace,
if necessary
2.3.6 Checks
The following checks shall be performed and documented upon delivery to site and periodically thereafter (take
photos of any damages):
− Product designation
− Tightness of packing, covering, sheds and other protective means
− Check the heater connections / activate the heaters
− Check the transport gas filling for appropriate pressure
− Document any mechanical damages
− Keep the storage area clean
− Conform with any additional storage requirements of the manufacturer
− Conform with any additional site storage instructions
− Keep all packing properly sealed to reduce the oxidizing effect of the air
1HDG518623A 2.35