BILL OF QUANTITIES
MAY, 2010
BILL OF QUANTITIES
1. The rates and prices to be inserted in the Bill of Quantities are to be the full
inclusive value of the work described under the several items, including all costs
and expenses which may be required in and for the construction of the work
described, together with all general risks, liabilities and obligations set forth or
implied in the documents on which the tender is to be based.
3. The quantities indicated against the various Bill items are estimated quantities,
and it therefore must not be taken as a guarantee that they will not be exceeded,
or that they will be carried out.
4. The Contractors must note that materials should be ordered for the Contract from
working drawings, where available and checked by site measurements. They will
not be ordered from the Bill of Quantities.
5. The Contractor must allow in his rates for the delivery of materials to the point
of incorporation in the Works, the costs of storage and double handling and for
any wastage of materials.
Note: Architect = Provincial Health Office in Mongu and Provincial Buildings Department, Ministry of Works and Supply
PRELIMINARY AND GENERAL ITEMS
DESCRIPTION SITE ZMK CZK
The Bill of Quantities, the Preliminaries and specifications are
complementary and are to be read together in association with the
drawings.
Materials shall be ordered from the drawings and not the Bill of
Quantities. Items in the Preliminaries and Bill of Quantities and
unqualified items must be priced.
CONSTRUCTION SUPERVISION
Agree with the Architect before works begin the condition of the water
mains, hydrants, valve boxes and location points and record and
schedule the findings. The conditions shall be maintained and evidence
of disfiguration deterioration and damage dealt with to the Architect’s
satisfaction on completion.
Carefully preserve and protect those trees and shrubs not required to be
removed. Any tree or shrub injured, damaged or removed without
written permission of the Architect shall be replaced at no cost to the
employer with the tree or shrub similar species and size.
The Contractor shall restrict his operations to within the confines of the
site except when providing mains services and drainage works, which
extends beyond the site boundaries.
Provide an electric power supply for lighting and power plant together
with all cables, portable leads ,fitting, all other materials, plant,
equipment and labour.
Ensure the safety of all personnel, and visitors on the site and plan and
arrange the works with safety as one of the major considerations.
Indemnity the employer from all cost claims and charges arising from
trespass and nuisance to users and occupiers of adjoining property.
Rubbish Disposal
Clear up and remove all rubbish and debris as the work proceeds and on
completion and leave the building and surrounding area clear of all
plant and material.
Remove from site all packing materials and rubbish of an inflammable
nature as soon as possible to avoid any danger of fire. Burning of
rubbish on site will not be allowed.
Weather Protection
Take all reasonable measures to prevent of minimize delays during
adverse weather.
Protect the works from damages by adverse weather and strong sun.
Mechanical Plant
Plant, tools and vehicles.
Provide all the plant, tools and vehicles required for the due execution
of the whole of the works.
Personnel transport
Provide for the transport of personnel to and from the site.
Temporary works
Scaffolding
Provide all general scaffolding required for the extension of the works
TOTAL
DESCRIPTION OF MATERIAL AND WORKMANSHIP
SCHEDULE OF WORKS
3.0. WORKMANSHIP
3.01. All workmanship shall be of the highest possible standard and shall accord with the
recommendations in any appropriate current British or Zambian Standard Code of Practice.
CONSTRUCTION OF HOSTEL BLOCK
Item BILL NO:3 HOSTEL BLOCK Unit Qty Rate ZMK CZK
SUBSTRUCTURE
EXCAVATION AND EARTHWORKS
Preambles
The whole of the substructure has been measured
up to the underside of the surface slab
Unless otherwise described, all excavations shall
be in "Pickable material" as described.
SITE PREPARATION
A Treat the surface of hardcore filling and bottom of
excavation with ant-proofing m2 535
B Ditto sides of trenches m2 248
C Excavate oversite average 150mm deep to remove
vegetable soil m2 540
EXCAVATION
D Excavate trench for foundations not exceeding
1500mm deep from stripped level m3 149
E Extra over all types of excavations for excavating
in hard rock as described m3 0
F Backfill trenches with excavated material m3 50
G Redig from spoil heaps and remove surplus
excavated materials as described m3 99
HARDCORE OR THE LIKE
H 150mm bed of hardcore, levelled, compacted and
blinded with 50mm of sand, ditto m2 535
Damp proof membrane
J 500mm gauge polythene sheet damp proof
membrane laid over hardcore to receive concrete
(measured separately) with 300mm end and side
laps m2 535
Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
Described in:
A 50mm Blinding in foundations m2 186
VIBRATED REINFORCED CONCRETE
SUBSTRUCTURE – TOTAL
Item BILL NO3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
D Plinth walls m2 90
CARRIED TO COLLECTION
Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
Brickwork in 190mm x 190mm x 90mm concrete
brick in cement mortar (1:4) as described in:
A Cills m 67
Blockwork in hollow concrete blocks Type 'A' in
cement mortar (1:4) as described
B 100mm Wall m2 216
C 200mm ditto m2 868
D Rough cutting to 200mm wall m 24
E Eaves filling to 200mm wall m 92
F Raking cutting 200mm wall m 24
G Bedding plate in cement mortar (1:4) to 200mm
wall m 92
BRICK REINFORCEMENT as described
H 100mm wide m 385
J 200mm ditto m 1550
Three-ply malthoid damp proof course lapped at
Junctions ends or passings 150mm as described
(measured net-allow for laps)
K To 100mm wall m 77
L To 200mm ditto m 310
SUNDRIES
M Terracotta airbricks, square hole pattern and
building into prepared openings No. 60
Item BILL NO.3 : HOSTEL BLOCK Unit Qty Rate ZMK CZK
CONCRETE WORK
Vibrated reinforced concrete grade 25-20mm
maximum aggregate tamped around reinforcement
(measured separately)
REINFORCEMENT
Mild steel bar reinforcement as described
including tying wire and distance blocks in
structural members
E 10mm diameter bars Kg 131
High tensile reinforcement as described
F 16mm Diameter bars Kg 383
One layer of mesh fabric reinforcement to
concrete as described, including 150mm side and
end laps, all bending, square cutting and notching
ROOFING
ROOFING – TOTAL
Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
CARRIED TO COLLECTION
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
CARPENTRY, JOINERY AND
IRONMONGERY (Cont'd)
A 45mm single ditto size 1125 x 1960mm No. 1
HARDWOOD DOORS: FRAMED, LEDGED,
BRACED AND BATTENED
B 45mm Doors size 825 mm x 1960mm No. 1
C 45mm Double leaf door size 1125x1960mm No 2
The following in Pelmets
D 75mm x 50mm softwood ground steel nailed to
blockwork No. 70
E 18mm thick blockboard top fixed to softwood
ground m 67
F 18mm thick facia fixed to blockboard top m 67
Wrot softwood as described
G 25mm x 75mm coved cornice plugged and
screwed to wall m 510
H 20mm x 250mm facia and barge board m 113
IRONMONGERY
J I' Section Aluminium curtain rail including
runners and brackets and fixing m 67
K 76mm three lever mortice lock No. 28
L 76mm two lever mortice lock No. 16
M 100mm C.P. barrel belt No. 5
N Indicator bolt No. 5
P Cupboard lock No. 18
METAL WORK
PLUMBING&SANITARY lNSTALLATIONS
CARRIED TO COLLECTION
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
PLUMBINGINSTALLATIONS (Cont'd)
COLD WATER INSTALLATIONS
Service pipework, in galvanised mild steel pipes
(medium grade, malleable iron screwed fittings
and fixed as described
Note:
The rates for pipes not exceeding 20mm diameter
are deemed to include all socket connectors
backnuts plugs, caps, elbows, bends and tees
CARRIED TO COLLECTION
Item BILL NO. 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
Chlorination
A Include for sterilising the whole of the plumbing
installations after testing in accordance with the
method laid down in the British Standard Code of
practice No. 310, Clause 506, all to the satisfaction
of the Project Manager
Item
Testing
B Include for testing the whole of the plumbing
installation on completion or as sections are
completed by means of a water pressure test to one
and half times the working pressure. Item
C The contractor is to include for executing a
running test on full completion of the installation
as required by the Project Manager and the correct
operation of all components shall be ascertained
and the system properly balanced on all controls,
valves etc., all to the satisfaction of the Project
Manager including providing all necessary water
etc., required for the testing.
Item
Builder's working connection with plumbing
installation
D Include for cutting or forming holes, chases etc, in
concrete beds, concrete blocks and brick walls
etc., for all plumbing installations covered in this
section and for making good all finishings. Item
CARRIED TO COLLECTION
PLUMBING - TOTAL
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
ELECTRICAL INSTALLATIONS
A Preambles
IN-SITU FINISHING
D Walls m2 390
SUMMARY
SUBSTRUCTURE
BLOCKWORK
CONCRETE WORK
ROOFING
METAL WORK
PLUMBING INSTALLATIONS
ELECTRICAL INSTALLATIONS
GLAZING
CARRIED TO SUMMARY
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZK
EXTERNAL DRAINAGE ALL PROVISIONAL
A Spoon Drain
Spoon drain size 750mmx250mm deep in concrete brick with sides dished to falls m 150
and including 150mm laterite bed with sand blinding and pointing in 1:3c/s
mortar, all necessary excavations, filling and disposal.
100x100A/C gully with gully grating complete with 100mm A/C gully P trap and No. 8
joining to drain and including setting in surrounding with plain insitu concrete
grade 15 as described and carrying concrete to form kerbing and include all
necessary excavations part back filling disposal of excavated materials and form
work.
CARRIED TO SUMMARY
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZK
A Excavating trenches starting from existing ground level to receive pipes not m 100
exceeding 200mm nominal size, grading bottoms, earthwork, supports, backfilling
with excavated material, disposing from site; not exceeding 1.50m deep, average
750mm deep.
D Plain insitu concrete (1:2:4) 20mm aggregate) in 150mm bed and surround to m 13
100mm drain pipe in trenches including additional excavation and any necessary
form work.
ASBESTORS –CEMENT DRAIN PIPES AND FITTINGS AND LAYING
JOINING AS DESCRIBED.
E 100mm diameter asbestos cement drain pipe including laying and joining in m 12
trenches.
F Extra over 100mm asbestos cement drain pipes for soil bend. No. 12
THE FOLLOWING IN 1 NR, MANHOLE
G Excavating in pits size 800x800mm and depth n.e. 1.5m from reduced level. m3 12
H Leveling and compacting bottom of excavations. m2 12
I Remove excavated material and store for reuse m3 20
Plain insitu concrete 1:3:6 grade 20 aggregate in the following
K Benching in bottoms rendered with 13mm c/s mortar before final set, 800x800mm m2
average 200mm thick.
Item BILL NO. 4: EXTERNAL BUILDING Unit Qty Rat ZMK CZK
e
A Reinforced insitu concrete BS 5828, prescribed C25, 20mm aggregate
Reinforcement
B 12mm diameter bar to suspended slab Kg 250
C To softies of slab m2 12
D Edges associated with slab, rectangular, straight sides 2.4m girth in edges n.e. m 100
100mm thick
BLOCKWORK
F Solid concrete block work filled with lean concrete M2 40
I 25mm (average) thick cement and sand hunching to top of concrete cover slabs, m2 12
withered five ways and trolled with wood float.
Standard Unit
J Access cover BS 497 coated, heavy, bedding frame in cement and sand mortar, NO.
size 600x450mm cast iron
Item BILL NO. 4: HOSTELS BLOCK Unit Qty Rate ZMK CZ
K
SUNDRIES
CARRIED TO COLLECTION
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZ
K
m 150
Excavating trenches not exceeding 1.50m deep and average depth 750mm
starting from existing ground level to receive service pipe, including grading
bottoms, earthwork support, backfilling with excavated material, disposal of
surplus excavated material off site.
Sluice valve chamber size 1000mmx1000mm deep overall as previously described No. 1
for fire hydrant chamber but with 150mm thick solid concrete blockwork and
building pipes.
Medium duty Galvanized mild steel pipes, fittings and joining as described.
Extra over medium duty Galvanized mild steel pipes for the following fitting.
CARRIED TO SUMMARY
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZ
K
GENERAL
Including the supporting the faces of all excavations with and including all
necessary planking and strutting.
Item
Including for keeping excavations free from water, mud and silt and for
cleaning bottoms of all excavations prior to pouring concrete.
Including for testing, Chlorinating and flushing out the whole of the water
reticulation system to the entire satification of the Architect and Local
Authority.
Item
Item
GENERAL SUMMARY
BILL OF QUANTITIES
GENERAL SUMMARY
TOTAL CZK