GOVERNMENT OF THE REPUBLIC OF ZAMBIA

MINISTRY OF WORKS AND SUPPLY


BUILDINGS DEPARTMENT

BILL OF QUANTITIES

FOR THE PROPOSED

CONSTRUCTION OF HOSTELS BLOCK AT LEWANIKA SCHOOL OF MIDWIFERY FOR

CONSULTANT: PROVINCIAL BUILDINGS ENGINEER


MINSTRY OF WORKS & SUPPLY
BUILDINGS DEPARTMENT
PRIVATE BAG
MONGU

MAY, 2010
BILL OF QUANTITIES

1. The rates and prices to be inserted in the Bill of Quantities are to be the full
inclusive value of the work described under the several items, including all costs
and expenses which may be required in and for the construction of the work
described, together with all general risks, liabilities and obligations set forth or
implied in the documents on which the tender is to be based.

2. A price or rate is to be entered against each item in the Bill of Quantities


irrespective of the absence of a quantity. Items against which no prices or rates
are entered will be deemed to be covered by prices and rates for other items
indicated elsewhere in the Bill of Quantities.

3. The quantities indicated against the various Bill items are estimated quantities,
and it therefore must not be taken as a guarantee that they will not be exceeded,
or that they will be carried out.

4. The Contractors must note that materials should be ordered for the Contract from
working drawings, where available and checked by site measurements. They will
not be ordered from the Bill of Quantities.

5. The Contractor must allow in his rates for the delivery of materials to the point
of incorporation in the Works, the costs of storage and double handling and for
any wastage of materials.

Note: Architect = Provincial Health Office in Mongu and Provincial Buildings Department, Ministry of Works and Supply
PRELIMINARY AND GENERAL ITEMS
DESCRIPTION SITE ZMK CZK
The Bill of Quantities, the Preliminaries and specifications are
complementary and are to be read together in association with the
drawings.

Materials shall be ordered from the drawings and not the Bill of
Quantities. Items in the Preliminaries and Bill of Quantities and
unqualified items must be priced.

In general the Bill of Quantities are measured in accordance with SMM


5 (metric) Edition 1975.

CONSTRUCTION SUPERVISION

Construction supervision will be carried out by the Architect.


The Contractor will closely cooperate with the Architect.

Management of the work Labour Returns


Submit each month to the Architect a statement of manpower employed
on the works in the various skills and trades and whomsoever employed
.

Programme and Progress Chart


Submit to the Architect before commencement two copies of the
Programme the form of a progress chart for each of the principal
operation.

Measurement of Covered Works


Allow the Architect or his representative at least 3 days notice before it
is covered. Work covered without prior notice have to be exposed and
reinstated for the Architect to inspect and measure.

Test and Samples


Submit as required by the Architect and before orders are placed.
Samples of materials and products to be used in the works. The
samples. Which shall be accompanied by a letter identifying the
supplier and manufacturer, shall when approved, set the standard
acceptability to be attained and maintained.
Allow for the provision of samples of materials and goods required by
the Architect.

Used and disposal Materials found on site.


Sand and aggregates found on the side and considered acceptable for
the use in the works may be substituted for the imported material if
instructed by the Architect.
The right to dispose of sand aggregates and top oil found on the site
reserved by the Architect.
Live Drains Service Mains
Ascertain the location of and protect all water, electric, telephone
services, drains and sewers. Afford access to the controlling utilities for
disconnection, inspection, and other activity that may be required to
deal with the presence of all services and drains.

Agree with the Architect before works begin the condition of the water
mains, hydrants, valve boxes and location points and record and
schedule the findings. The conditions shall be maintained and evidence
of disfiguration deterioration and damage dealt with to the Architect’s
satisfaction on completion.

Security, Safety, Protection


Protection to trees and shrubs

Carefully preserve and protect those trees and shrubs not required to be
removed. Any tree or shrub injured, damaged or removed without
written permission of the Architect shall be replaced at no cost to the
employer with the tree or shrub similar species and size.

Access and possession or use of site

The contractor shall make his own arrangement for providing;


maintaining and reinstating on completion adequate safe access to and
agrees from the site. His proposals for access and agrees shall be
submitted to the Architect for his approval prior to their
implementation.

Limitations of working space Management and staff direction and


control

The Contractor shall restrict his operations to within the confines of the
site except when providing mains services and drainage works, which
extends beyond the site boundaries.

Contractor’s General Cost Items Management and staff Directions


and Control

Direct control and operate with staff in such skills of management,


control and supervision needed to realize the conditions of the contract
standard of performance and quality control with diligence and
efficiency.

Site accommodation, offices, stores, compounds and sanitary


facilities.
In necessary provide temporary accommodation for welfare of
personnel, secure storage weather protection of material and fire
resistance storage of inflammable material. If necessary provide
temporary offices and pit latrine accommodation of standard and in
such positions as Architect may approve.
Keep the building in a clean sanitary condition, remove on completion
make good all works disturbed.

Services and Facilities


Water

Provide a supply of clean fresh water, include costs of connection,


consumption, temporary storage and distribution all other materials,
plant, equipment, labour and comply with the requirements of water
authority.

Light and Power

Provide an electric power supply for lighting and power plant together
with all cables, portable leads ,fitting, all other materials, plant,
equipment and labour.

Safety, health and Welfare


Provide all safety, health and welfare facilities and other statutory
regulations and local working rules.

Ensure the safety of all personnel, and visitors on the site and plan and
arrange the works with safety as one of the major considerations.

Site Administration and Security

Administer the works as to avoid trespass obstruction.


Nuisance, damage, injury to persons and property outside the
boundaries of the site. Take such measures of protection and security
as to avoid trespass and unrestricted entry, damage wanton and
inadvertent theft and injury by and of that access to the site is
unauthorized paying particular attention to children.

Indemnity the employer from all cost claims and charges arising from
trespass and nuisance to users and occupiers of adjoining property.

Rubbish Disposal
Clear up and remove all rubbish and debris as the work proceeds and on
completion and leave the building and surrounding area clear of all
plant and material.
Remove from site all packing materials and rubbish of an inflammable
nature as soon as possible to avoid any danger of fire. Burning of
rubbish on site will not be allowed.

Control of Noise and Pollution


Take all reasonable precautions to reduce the noise and vibration
emanating from plant on the works.
Submit to the Architect for approval, proposals for controlling noise in
those parts of the works where excessive noise in the opinion of the
Center Administrator.
Take precautions to minimize annoyance from dust to premises
adjacent to the site and persons passing by the site by damping down or
the use of screens.

Rodent and pest control


Keep the site and works at all times and on completion free from
vermin us and other pestilential to the satisfaction of the Architect.

Weather Protection
Take all reasonable measures to prevent of minimize delays during
adverse weather.
Protect the works from damages by adverse weather and strong sun.

Mechanical Plant
Plant, tools and vehicles.
Provide all the plant, tools and vehicles required for the due execution
of the whole of the works.

Personnel transport
Provide for the transport of personnel to and from the site.

Temporary works
Scaffolding
Provide all general scaffolding required for the extension of the works

Temporary roads and hard standing


If necessary provide temporary roads, hard standing and paths.

TOTAL
DESCRIPTION OF MATERIAL AND WORKMANSHIP

SCHEDULE OF WORKS

DESCRIPTION OF MATERIALS AND WORKMANSHIP


1.0. Standard specification for materials and workmanship
1.1. The specification for materials and workmanship is the Standard General Specification of
materials and Workmanship for Building Works” interim metric 1970 edition current at time of
tendering with any amendments, addenda or supplements thereto, together with any
particular specifications, if any all as detailed in the tender documents and on the drawings.
These shall be as mutually explanatory one with the other. Where a particular specification is
incorporated, it will take precedence and shall prevail over the standard general specification
should any conflict discrepancy arise between these documents.
All materials shall be properly protected from snow, frost and inclement weather and any
materials damaged shall be removed from the site immediately and replaced with sound
materials.
2.02. The Director of Buildings may require the Contractor to submit samples of any samples
materials to be used in the works and if so required the Contractor shall submit samples
without delay. The Director of Buildings may give or withhold approval of any submitted
samples, and in the latter case may require the Contractor to re-submit further samples until
an approved sample is submitted. All materials in the works in respect of which samples have
been submitted shall be equal in all respects to the samples in order to check that actual
materials used in the works correspond thereto.
2.03. The Director of Buildings may require the Contractor to test any of the material used
testing in the works and so required the Contractor shall at his own expense supply test
samples, of pack in suitable containers and forward them to a firm or testing laboratory
nominated or materials approved by the Director of Buildings for such tests as the Director of
Buildings may require. If the results of those tests are satisfactory and are approved by the
Director of Buildings then the fees or charges of the firm in testing laboratory shall be paid by
the Employer, but if the results of those test are unsatisfactory and are not approved by the
Director of Buildings then the said fees or charges of the firm or testing laboratory shall be
borne by the Contractor.
2.04. All materials shall be used in the works which have not received the Director of Buildings
of approval. Any materials sent onto the site of the works in respect of which the Director of
Materials Buildings may withhold approval shall be removed from the site within twenty four
hours.
2.05. Where approved materials or articles of every description and kind detailed in the
Specification are of local manufacture or fabrication, these will be given preference over
imported materials and must be used in the works.
2.06. Where a specific article or material is referred to by a trade or manufacture’s name or is
specified by a catalogue, or other reference number of description, it shall be deemed to
indicate only the style type of the article or materials required and shall in no way restrict the
Contractor’s choice of supplier, provided that the alternative article or material offered is
“equal and approved” to that specified in the opinion of the Director of Buildings.
No claim will be entertained for any reason if any article or material is rejected as unsuitable
by the Director at any time.
2.07. Where a British Standard is referred in the specification the relevant material or article
shall comply therewith. Where a Zambian Standard, exists which properly covers an article, at
the Date of tender then the conditions of the Zambian Standard shall apply, provided always
that the cost of the material or article so supplied shall not exceed the cost of the complying
with the British Standard.

3.0. WORKMANSHIP
3.01. All workmanship shall be of the highest possible standard and shall accord with the
recommendations in any appropriate current British or Zambian Standard Code of Practice.
CONSTRUCTION OF HOSTEL BLOCK
Item BILL NO:3 HOSTEL BLOCK Unit Qty Rate ZMK CZK
SUBSTRUCTURE
EXCAVATION AND EARTHWORKS
Preambles
The whole of the substructure has been measured
up to the underside of the surface slab
Unless otherwise described, all excavations shall
be in "Pickable material" as described.
SITE PREPARATION
A Treat the surface of hardcore filling and bottom of
excavation with ant-proofing m2 535
B Ditto sides of trenches m2 248
C Excavate oversite average 150mm deep to remove
vegetable soil m2 540
EXCAVATION
D Excavate trench for foundations not exceeding
1500mm deep from stripped level m3 149
E Extra over all types of excavations for excavating
in hard rock as described m3 0
F Backfill trenches with excavated material m3 50
G Redig from spoil heaps and remove surplus
excavated materials as described m3 99
HARDCORE OR THE LIKE
H 150mm bed of hardcore, levelled, compacted and
blinded with 50mm of sand, ditto m2 535
Damp proof membrane
J 500mm gauge polythene sheet damp proof
membrane laid over hardcore to receive concrete
(measured separately) with 300mm end and side
laps m2 535
Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

PLAIN IN-SITU CONCRETE GRADE IS AS

Described in:
A 50mm Blinding in foundations m2 186
VIBRATED REINFORCED CONCRETE

GRADE 20 AS DESCRIBED TAMPED


AROUND REINFORCEMENT
B In foundations m3 112
REINFORCEMENT
C 16mm Diameter high tensile steel bars in
foundations Kg 1000

D 10mm Diameter mild steel bars in ditto Kg 400

SUBSTRUCTURE – TOTAL
Item BILL NO3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

BLOCKWORK IN HOLLOW CONCRETE


BLOCKS FILLED SOLID WITH
CONCRETE 1:3:6 IN CEMENT MORTAR
1:3 IN:

A 190 mm Wall m2 248


BRICK REINFORCEMENT as described
B 160mm wide every course m 310
RENDERING

19mm ONE COAT CEMENT AND SAND 1:4


RENDERING TO:
C Plinth walls m2 90
PAINTING

PREPARE AND APPLY TWO COATS


BLACK BITUMINOUS PAINT TO:

D Plinth walls m2 90

CARRIED TO COLLECTION
Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
Brickwork in 190mm x 190mm x 90mm concrete
brick in cement mortar (1:4) as described in:
A Cills m 67
Blockwork in hollow concrete blocks Type 'A' in
cement mortar (1:4) as described
B 100mm Wall m2 216
C 200mm ditto m2 868
D Rough cutting to 200mm wall m 24
E Eaves filling to 200mm wall m 92
F Raking cutting 200mm wall m 24
G Bedding plate in cement mortar (1:4) to 200mm
wall m 92
BRICK REINFORCEMENT as described
H 100mm wide m 385
J 200mm ditto m 1550
Three-ply malthoid damp proof course lapped at
Junctions ends or passings 150mm as described
(measured net-allow for laps)
K To 100mm wall m 77
L To 200mm ditto m 310
SUNDRIES
M Terracotta airbricks, square hole pattern and
building into prepared openings No. 60
Item BILL NO.3 : HOSTEL BLOCK Unit Qty Rate ZMK CZK

CONCRETE WORK
Vibrated reinforced concrete grade 25-20mm
maximum aggregate tamped around reinforcement
(measured separately)

A Ring beam and lintels m3 5


B Thickening to edge of surface slab m3 2
C 100mm surface slab m2 540
Labours on concrete of any description
D Treating the surfaces of unset concrete, trowelled
to level surface m2 540

REINFORCEMENT
Mild steel bar reinforcement as described
including tying wire and distance blocks in
structural members
E 10mm diameter bars Kg 131
High tensile reinforcement as described
F 16mm Diameter bars Kg 383
One layer of mesh fabric reinforcement to
concrete as described, including 150mm side and
end laps, all bending, square cutting and notching

G Conforce, reference 257 weighing 2.57 Kg per


square Meter m2 540
FORMWORK
Sawn Formwork as described
H To sides and soffits of beam and lintels m2 67
J To edges of surface slab not exceeding 100mm
high m 113

CONCRETE WORK - TOTAL


Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

ROOFING

Use for corrugated Iron sheeting

A Corrugated roof sheets laid with minimum 200mm


endlaps with galvanised hook bolts, nuts and felt
washers to spider trusses (measured nett - no
allowance made for laps) including all straight
cutting and waste.
m2 644

B Adjustable ridge capping m 46

C End finials No. 2

D General purpose patch soaker including making


hole for large pipe and pointing around pipe with
mastic No. 1

ROOFING – TOTAL
Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

CARPENTRY, JOINERY AND


IRONMONGERY

Note: All timber in this section shall be treated to


the approval of the Project Manager.
Roof and ceiling Construction in Sawn Softwood

A 150mm x 50mm Ceiling joist m 663


B 150mm x 50mm Rafters m 714
C 100mm 50mm Struts and ties m 810
D 50mm x 75mm purlins m 585
E 40mm x 40mm Brandering nailed to walls m 310
F 40mm x 40mm Ditto nailed to softwood m 1770
G 50mm x 250mm Beam m 23
H 50mm x 150mm sproquets m 7
JOINERY
Flush Doors
Interior quality flush semi-solid core door as
described and hanging on hinges provided with
pressed steel door frames
J 45mm Single leaf door size 625mm x 1960mm
high No. 48

K 45mm Ditto size 825mm x 1960mm No. 20

CARRIED TO COLLECTION
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
CARPENTRY, JOINERY AND
IRONMONGERY (Cont'd)
A 45mm single ditto size 1125 x 1960mm No. 1
HARDWOOD DOORS: FRAMED, LEDGED,
BRACED AND BATTENED
B 45mm Doors size 825 mm x 1960mm No. 1
C 45mm Double leaf door size 1125x1960mm No 2
The following in Pelmets
D 75mm x 50mm softwood ground steel nailed to
blockwork No. 70
E 18mm thick blockboard top fixed to softwood
ground m 67
F 18mm thick facia fixed to blockboard top m 67
Wrot softwood as described
G 25mm x 75mm coved cornice plugged and
screwed to wall m 510
H 20mm x 250mm facia and barge board m 113
IRONMONGERY
J I' Section Aluminium curtain rail including
runners and brackets and fixing m 67
K 76mm three lever mortice lock No. 28
L 76mm two lever mortice lock No. 16
M 100mm C.P. barrel belt No. 5
N Indicator bolt No. 5
P Cupboard lock No. 18

CARPENTRY, JOINERY AND


IRONMONGERY – TOTAL
Item BILL NO 3 : HOSTEL BLOCK Unit Qty Rate ZMK CZK

METAL WORK

Pressed steel door frames building in and fixing in


position
A 900mm wide x 2400mm high overall to suit
200mm wall No 42
B 900mm wide x 2400mm high overall to suit
200mm wall No. 9

C 1200mm wide x 2600mm cupboard door frame to


suit 100mm wall No. 23
Cottage section steel window frames and fittings
and building in
D Ditto size 11c6/11c6/11f611f6/11c6/11c6 size
1100 mm x 3600mm overall No. 1
E Ditto size 11c6/11c6/11f611f6/11c6/11c6 size
1100 mm x 3600mm overall No 18
F Ditto size 11c6/11f6/11c6 size 1100mm x
1800mm overall No. 2
G Ditto size 9c6/9f6/9f6/9c6 size 900mm x 600mm
overall No. 1
H Ditto size 5v6/5v6 size 500mm x 1200mm overall No. 1
J Ditto size 5v6/5f6/5v6 size 500mm x 1800mm
overall No 1
K Ditto size 5V6 size 500x600mm ditto No 5
Mild steel pipe supports to roof members
L 75mm diameter pipe 2200mm long one and cast
into concrete and other sand carrying timber beam
No. 10

METAL WORK – TOTAL


Item BILL NO 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

PLUMBING&SANITARY lNSTALLATIONS

Galvanised mild steel waste pipework (medium grade)


malleable iron screwed fittings in the running length
and fixing as described
A 32mm diameter piping m 28

B Extra Over ditto for bending with screwed inspection


eye No. 10

C Extra over ditto splay cut end No. 14

D 38mm diameter piping m 12

E Extra over for tee No. 6

F Ditto for bend No. 8

Traps to waste outlets and fixing and jointing


as described

Sanitary fittings and fixing as described


G Low level W.C. suit White Vitreous China wash down
WC Pan 'P' trap 9.08 litre plastic siphon ball valve,
silence tube plastic white plastic flush bend, inlet
connection 13mm supply pipe to wall with flange
black heavy duty plastic seat and cover fixed to pan
screwed with Domex screws with plastic heads and
connected to soil pipe and cistern fixed to wall with
brackets.
No. 6
14 
H Wash hand basin in vitreous china complete with 2No.
13mm taps one chromium plated waste, outlet plug
and chain and union joint to steel piping including C.P.
bottle trap 32mm diameter joined to waste pipe and
fixing with brackets plugged to wall
No.
I Wash troughs in vitreous china complete with 2No.
19mm taps, one chromium plated waste outlet, plug
and chain and union joint 10 steel piping including
C.P. 38mm bottle trap ditto
No. 6

G 13mm shower mixer fitting with chromium plated riser


pipes with taps lettered or colour designated "COLD
and HOT" and jointing to pipework No. 6

H Plastic Shower curtain size 800mm wide x 200 high


and fixing to and including curtain rail No. 6

Double kitchen sink No. 1


J
Sundry Appliances
K 150mm x 150mm toilet roll holder in vitreous china No. 6
including fixing in recess

L 150mm x 150mm soap holder in ditto No. 6

CARRIED TO COLLECTION
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

PLUMBINGINSTALLATIONS (Cont'd)
COLD WATER INSTALLATIONS
Service pipework, in galvanised mild steel pipes
(medium grade, malleable iron screwed fittings
and fixed as described

Note:
The rates for pipes not exceeding 20mm diameter
are deemed to include all socket connectors
backnuts plugs, caps, elbows, bends and tees

A 13mm diameter piping m 17


B 19mm ditto m 16
Valves and joining and fixing as described
C 13mm diameter brass stop valve including jointing
to steel tubing. No. 8

D 19mm Ditto No. 14


Copper or Lead service Connectors

E 13mm Copper connector 300mm long and jointing


to pipe No. 8
F 19mm Ditto No. 4
EQUIPMENT
G 180Liter type WCF geyser including brackets and
fixing No. 2

CARRIED TO COLLECTION
Item BILL NO. 3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
Chlorination
A Include for sterilising the whole of the plumbing
installations after testing in accordance with the
method laid down in the British Standard Code of
practice No. 310, Clause 506, all to the satisfaction
of the Project Manager
Item
Testing
B Include for testing the whole of the plumbing
installation on completion or as sections are
completed by means of a water pressure test to one
and half times the working pressure. Item
C The contractor is to include for executing a
running test on full completion of the installation
as required by the Project Manager and the correct
operation of all components shall be ascertained
and the system properly balanced on all controls,
valves etc., all to the satisfaction of the Project
Manager including providing all necessary water
etc., required for the testing.
Item
Builder's working connection with plumbing
installation
D Include for cutting or forming holes, chases etc, in
concrete beds, concrete blocks and brick walls
etc., for all plumbing installations covered in this
section and for making good all finishings. Item
CARRIED TO COLLECTION

PLUMBING - TOTAL
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK

ELECTRICAL INSTALLATIONS

A Preambles

The contractor is deemed to have included in his


retes for the following:
Cutting or forming holes, changes and other
general building work required including making
good finishing and other works disturbed.

Constant supervision by a supervisor possessing


approved qualifications.

Protection of installation until handed over,


for taking requisite precautions to protect
workmen and the public from electric shockor
burns.

Comply with all necessary bye-laws and rules with


which installation shall be required to comply

Allow for bonding all roofs, water pipes, waste


pipes sink etc.

All service are to be sub-contracted to specialized


service providers as per relevant National Council
for construction category.
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
 A ELECTRICAL INSTALLATIONS
METAL BOX item
The following in one number 3 phase meter box
1 No 100 TP MCB
3No.Surge Arrestors
1 No. Earth Bar
Distributor Board
Distributor Board, labeled 7 way SP&N embedded
in wall, comprising:

1 No 100A MCB TP & N (incoming) No 1


10No 30A SP MCB
3No 10A SP MCB
3NO 10A SP MCB
Earth bar

Supply, install and connect all conduits


fittings, cables and cable connections from
Distribution Board to supply points , connected
conduit installations, switches and light fittings
(measured separately)

Single ceilling mounted light points on one gang


one way switch No 18
Two ceilling mounted light points on one gang one
way switch No 5
Two ceilling mounted light points on one gang
two way switch No 18
Five ceilling mounted light points on one gang one
way switch No 3
Five ceilling mounted light points on one gang one
way switch No 3

Ten ceilling mounted light points on one gang one


way switch No 1

Eight outside wall mounted security light points


on one gang one way No 1
Item BILL NO.3: HOSTEL BLOCK Unit Qty Rate ZMK CZK
ELECTRICAL INSTALLATIONS
 A Supply, install and connect all conduits
fittings, cables and cable connections from
Distribution Board to supply points , connected
conduit installations, switches and light fittings
(measured separately)
item

24 No. double socket outlets mounted 450mm


above finished floor level No 18
1 No single socket outlets mounted 420mm above
finished floor level No 16
1 No cooker control unit mounted 1600mm above
finished floor level No 1

Supply, install and connect the following light


fittings fixing in accordance with manufacturers
instructions: Philips range or other equal and
approved

120mm long 3x36W recessed floorecent fittings


completed with aluminium reflectors and staters as
PHILIPS . No 5
1200mm long 1x36W fluorescent fittings
complete with diffuser as PHILIPS . No 16
1200mm long 1x36W fluorescent fittings
complete with diffuser as PHILIPS . No 3
Opal recessed ceilling down lights complete with
bulbs as PHILIPS or any approved. No 16
MK or other equal and approved lights
switches
6Amp one gang one way switch as MK including
3”x3” metal box No 23
13A single socket outlet as MK including 3”x3”
metal box No 23
Ditto But one gang two way switch as MK
including 3”x3”metal box No 18
Socket outlet as MK or any other equivalent
13AM double socket outlet as MK including
3”x3” metal. No 45
13AM double socket outlet as MK including
3”x3” metal No 10
Uni Qty Rate ZMK CZK
t
BILL NO.3: HOSTEL BLOCK
ELECTRICAL INSTALLATIONS

45AMP cooker control Unit complete with 6”x6”


metal box No 2

Fire extinguisher, etc

Portable carbon dioxide gas extinguisher with wall


fixing brackets, capacity 9kg No 10

Portable dry powder extinguisher with wall fixing


brackets, capacity 9kg No 10
Item BILL NO.3: HOSTEL BLOCK Uni
t Qty Rate
ZMK
CZK

FLOOR,WALL AND CEILING FINISHING

IN-SITU FINISHING

Cement and sand(1:3) finished with a steel


trowel
A 40mm screed laid flat on concrete m2 532

B Ditto finished to received vinyl asbestos tiling m2 532


C 20mm x 100 mm high wood skirting with rounded
top. m 259
One coat 19mm thick cement and sand 1:4
plastering finished with steel trowel internally
to:

D  Walls m2 390

E Reveals or return not exceeding 100mm wide m2 95

TILES,SLAB OR BLOCK FINISHING

300mm x 300mm vinyl asbestos tile paving and


fixing with approved adhesive including two
coats of wax polish.

F 2mm tiling on screed(measured separately) m2 532

300mm x 250mm white ceramic tile paving and


fixing with approved adhesive including two
coats of wax polish.

G 6mm tiling on water closet wall ( measured


separately) m2 30

FLOOR, WALL AND CEILING FINISHINGS


(Cont’d)

White glazed ceramic wall tiles size 150mm x


6mm and fixing with approved water proof
adhesive to plastered walls and pointing in white
cement including all square cutting and waste.

A Walls and splash backs m2 20


CEILING FINISHINGS

Particle Board Ceiling

B 6mm Particle board sheeting set horizontal and


fixed to timber ceiling joists (measured separately)
including 10mm x 38mm wrot softwood cover
sinking nail heads as necessary m2 535
Item BILL NO. 3: HOSTEL BLOCK Uni CZK
t Qty Rate ZMK
PAINTING AND DECORATION
Prepare and apply one undercoat and two finishing
coats of PVA as described to the following
surfaces
A To soffit of ceiling m2 535
B To plastered walls internally m2 286
C Ditto externally m2 322
D Ditto to reveals or returns not exceeding girth m 45
Touch up manufacturer's priming coat and apply
one undercoat and two hard gloss finishings coats
as described internally or externally on the
following metalwork
E To window surfaces (both sides measured flat – no
allowance made for panes m2 56
F To door frames m2 117
G Small galvanised pipe m 37
H Large asbestos cement pipe m 26
Prepare and apply one undercoat and two gloss
finishing coats
J To plastered walls internally m2 1851
K Reveals or returns not exceeding 100mm girth m 45
Knot, Prime, Stop and Paint one undercoat and
two Hard Gloss finishing coats as described
internally or externally on the following
woodwork
L General surfaces of doors m2 90

PAINTING AND DECORATING – TOTAL


Uni
Item BILL NO. 3: HOSTEL BLOCK Qty Rate ZMK CZK
t

SUMMARY

SUBSTRUCTURE

BLOCKWORK

CONCRETE WORK

ROOFING

CARPENTRY, JOINERY AND


IRONMOPNGERY

METAL WORK

PLUMBING INSTALLATIONS

ELECTRICAL INSTALLATIONS

FLOOR, WALL AND CEILING FINISHINGS

GLAZING

PAINTING AND DECORATIONS

TOTAL CARRIED TO GRAND SUMMARY

CARRIED TO SUMMARY
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZK
EXTERNAL DRAINAGE ALL PROVISIONAL
A Spoon Drain
Spoon drain size 750mmx250mm deep in concrete brick with sides dished to falls m 150
and including 150mm laterite bed with sand blinding and pointing in 1:3c/s
mortar, all necessary excavations, filling and disposal.

B The following in 8 No. Gully.

100x100A/C gully with gully grating complete with 100mm A/C gully P trap and No. 8
joining to drain and including setting in surrounding with plain insitu concrete
grade 15 as described and carrying concrete to form kerbing and include all
necessary excavations part back filling disposal of excavated materials and form
work.

Apron and paving

C Apron in 600x600x50mm concrete paving laid to slope all round. m 25


D Kerb stone in 100x150 precast concrete laid and embedded in mortar (1:4). m 15
STEP
E Steps in solid block including stepped concrete slab and finished to the satisfaction Item
of the Site Engineer.

CARRIED TO SUMMARY
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZK
A Excavating trenches starting from existing ground level to receive pipes not m 100
exceeding 200mm nominal size, grading bottoms, earthwork, supports, backfilling
with excavated material, disposing from site; not exceeding 1.50m deep, average
750mm deep.

B Extra over excavating in hard rock, (Provisional) m3 100


C 75mm thick compacted bed of selected gravel to 100mm diameter drain pipes in m 105
trenches including additional excavations.

D Plain insitu concrete (1:2:4) 20mm aggregate) in 150mm bed and surround to m 13
100mm drain pipe in trenches including additional excavation and any necessary
form work.
ASBESTORS –CEMENT DRAIN PIPES AND FITTINGS AND LAYING
JOINING AS DESCRIBED.

E 100mm diameter asbestos cement drain pipe including laying and joining in m 12
trenches.

F Extra over 100mm asbestos cement drain pipes for soil bend. No. 12
THE FOLLOWING IN 1 NR, MANHOLE
G Excavating in pits size 800x800mm and depth n.e. 1.5m from reduced level. m3 12
H Leveling and compacting bottom of excavations. m2 12
I Remove excavated material and store for reuse m3 20
Plain insitu concrete 1:3:6 grade 20 aggregate in the following

J Beds laid on earth 100mm thick to bottom of machine. No.

K Benching in bottoms rendered with 13mm c/s mortar before final set, 800x800mm m2
average 200mm thick.
Item BILL NO. 4: EXTERNAL BUILDING Unit Qty Rat ZMK CZK
e
A Reinforced insitu concrete BS 5828, prescribed C25, 20mm aggregate

100mm thick suspended slab m2 12

Reinforcement
B 12mm diameter bar to suspended slab Kg 250

Form Work Generally

C To softies of slab m2 12
D Edges associated with slab, rectangular, straight sides 2.4m girth in edges n.e. m 100
100mm thick

Sundries in all concrete

E Treating surface of un set concrete by tamping and leveling. m2 12

BLOCKWORK
F Solid concrete block work filled with lean concrete M2 40

150mm thick block work in 1.3 c/s mortar


G Sundries
Building in ends of pipe, large, through 200mm block work and making good No. 42
finishing disturbed.

H Mortar, cement and sand 1:3 steel throweled to block work m2 78


15mm thick plaster to walls

I 25mm (average) thick cement and sand hunching to top of concrete cover slabs, m2 12
withered five ways and trolled with wood float.
Standard Unit
J Access cover BS 497 coated, heavy, bedding frame in cement and sand mortar, NO.
size 600x450mm cast iron
Item BILL NO. 4: HOSTELS BLOCK Unit Qty Rate ZMK CZ
K
SUNDRIES

Testing whole of the drainage system as work proceeds and completion


water pressure method.
Item

CARRIED TO COLLECTION
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZ
K

WATER RETICULATIONS (ALL PROVISIONAL)

m 150
Excavating trenches not exceeding 1.50m deep and average depth 750mm
starting from existing ground level to receive service pipe, including grading
bottoms, earthwork support, backfilling with excavated material, disposal of
surplus excavated material off site.

Extra Over excavating in hard rock (Provisional) m2 2

Sluice valve chamber size 1000mmx1000mm deep overall as previously described No. 1
for fire hydrant chamber but with 150mm thick solid concrete blockwork and
building pipes.

Medium duty Galvanized mild steel pipes, fittings and joining as described.

19mm diameter pipe and laying in trench m 100

25mm diameter pipe and laying in trench m 150

38mm diameter pipe laying in trench m 70

Extra over medium duty Galvanized mild steel pipes for the following fitting.

19mm diameter Bend nr 10

38mm diameter Bend nr 10

50mmx19mmx38mm Tee diameter Reducer nr 10

25mmx19mm19,, Tee diameter Reducer. nr 10

CARRIED TO SUMMARY
Item BILL NO. 4: EXTERNAL WORKS Unit Qty Rate ZMK CZ
K

GENERAL

Including the supporting the faces of all excavations with and including all
necessary planking and strutting.
Item
Including for keeping excavations free from water, mud and silt and for
cleaning bottoms of all excavations prior to pouring concrete.

Including for testing, Chlorinating and flushing out the whole of the water
reticulation system to the entire satification of the Architect and Local
Authority.

Item

Item
GENERAL SUMMARY

BILL OF QUANTITIES

FOR THE PROPOSED

CONSTRUCTION OF HOSTES BLOCK AT


LEWANIKA SCHOOL OF MIDWIFERY IN
MONGU FOR MINSTRY OF HEALTH

GENERAL SUMMARY

BILL 1 – PRELIMINARY AND GENERAL ITEMS

BILL 3 – CONSTRUCTION OF HOSTEL BLOCK

BILL 4 – CONSTRUCTION OF EXTERNAL WORKS

TOTAL CZK