4 2,
GHGGITDaseAt oss v ; - ae
ws Su sGagsiuras GruACvd - 03
peepee Dis CENTRAL EXPRESSWAY PROJECT - 03
Oboe eObda qdardo
EY 218 21558558 osiy70 SEB Fle, yuIem Sue, ousBoere, deface
ROAD DEVELOPMENT AUTHORITY YB Ag pAROND ny, Crain, usesaoe
ceinad mines em. 30.808 nc adenoe Stage |, 3” Floor, Sethsiripaya, Bataramulla
BE SRE Be IS Aomwte SA. womens pirax- 494112877708, ~94112862801, 494112877189
Sub Office, No. 962, Negambe Road, Kurunegala
evra ~ 193972036396 tomull- eladpdcepsagimaitcam Emil ~ rdapslesp@gmeilcom / rdapdeepi@gmail com
® CmObe coass@ Oa89 GIeHS OHO OseaBe - 03
x8 72° |poa/cep 3/ch/PK 10/0n-068 S88 IS | 24.02.2022
a Fourh Da __
Authorized Representative,
K.D.A. Weerasinghe and Company (PVT) Ltd,
Mahawaththa,
Panagamuwa,
Pothuhera.
Dear Sir,
CENTRAL EXPRESSWAY PROJECT-SECTION-3 POTHUHARA TO GALAGEDERA,
(FROM CH.0+000KM TO 32+450KM) CONSTRUCTION OF PACKAGE 1
FROM CH.3+090 KM TO CH. 4+400 KM)
Contract No: - RDA/CEP3/PACK 1D.
Subject: - Asphalt Pavements uu Bridge Decks
Reference is based on Director General’s - Road Development Authority letter RDA/DG/R&D dated
11" October 2018 addressed to all Project Directors.
Accordingly, please follow the asphalt thickness on viaduct bridges and other structures as mention in
the cross section given in figure (1) & (2) of annexed 01
Further to that, the thickness of wearing course should match with same for the other part of the
xpressway.
Thanking You,
Yours faithfully,
Package ID.
CEP -3/RDA.Somm Asphalt Wearing Course
(surface layer) Pavement structure
‘40mm asphalt leveling layer
/. Le - ei ; / rs fe fo pf eae ning a
Bridge deck concrete
slob
Figura <1
‘Adhesive leyer
A (water proofing materalto
— T¥*~ |_pavement (Ac)
ss 4——— water prooting aver
ae —— ee
Adhesive layer
{slab surface-water proofing material
Slab water proofing
Figure -2
‘A.B. Rathninda
Project Engineer
02
oral eres) Poet
car peelopmert Author
Pree ore