Professional Documents
Culture Documents
Primavera P6 Schedule
Primavera P6 Schedule
COM
PROJECT PLANNING
With
PRIMAVERA P6
ABOUT
CADADDA
CADADDA is an Autodesk Authorized Training Center and ISO 9001:2015 certified company,
registered in 2014 and it is a trademark (registered ®) company involved in CAD/CAM software
training and consultancy. CADADDA having 8+ years and 3000+ students training experiences.
Best customer services are the reasons behind the fast growth of the company. The company
founded by Mr. Bhupesh Kumar (Diploma in Mechanical Engineering & BE in Production & Industrial
Engineering) in year 2014 covers the all the following fields.
Civil / Arch.
Mechanical
Project Management.
Interior design &
Furniture Design Etc.
CADADDA has shown a great strength though it’s comprehensive, qualitative & updated training
programs. It’s vast experience of training of 3000+ individuals, 10 + corporate houses and most
importantly great customer satisfaction record has uniquely placed the CADADDA among the
other CAD centers.
At the CADADDA, we have worked out for the industries requirements, placements criteria and
courses of engineering colleges. Broadly the engineering college has major focus on all field our
working.
CADADDA offers industry oriented and high-quality courses and certification in different field. 30+
courses of different level CADADDA was founded in 2014 with the vision of expend this creative skill
development and expertise soon.
SCHEDULE
Part 1 Part 4
Introduction to Project Planning Activity Relationship Different Types
Introduction to Primavera 1. SS
user interface 2. FS
User Preference 3. SF
Creating New Units for Measurement 4. FF
Different Types of Views
Activity Network Linking Relationship Between Activities
Admin Preferences Lead & Lag
User Preferences Float
Introduction to OBS (Object Breakdown
Scheduling
Structure) Critical Path
OBS Creation Risk creation & Assignment
Introduction to EPS (Enterprise Breakdown
Structure) Part 5
INTRO
EPS Creation. Resources (Create & Assign)
Linking O.B.S to E.P.S Roles (Create & Assign)
Resources Curve
Part 2 Resource Usages profile
Introduction to Calendar Resource Leveling
Creating a New Calendar (Global, Project,
Part 6
Resource) Introduction to baseline
Creating a New Project Baseline creation
Project Parameters Baseline assignment
Project Note Managing Baseline
Project Code Working with Layouts
Project Funding Working with Columns
Preferences & Other. Project updating
Project Tracking
Part 3 Progress Line
Introduction to Work Breakdown Structure
Method of Updating Project & Earn value Analysis
(W.B.S) Part 7
Creating W.B.S Project Optimization by various method
WBS Code, WBS Notes. Changing duration of critical activity
Creating new Activity By increasing recourse
Define Activity Type By dividing activity in small segment
Activity ID, Description, Duration By changing Relation etc.
Activity Code, Project Scheduling.
Activity Notes. Part 8
Activity Steps Different type of Report creation
Activity Expense Report Wizard
Grouping, Sorting & Filtering Print Setup & Printing
Bars Import & Export projects
Timescale Project Issue
Project threshold
S curve
Resource curve etc.
N O T E : P R O J E C T W I L L S T A R T P A R A L L E L L Y A L A R G E P R O J E C T W I L L BE A S S I G N E D
AT THE END.
THANK YOU, AND WE
LOOK FORWARD TO
WORKING WITH YOU.
Contact US
+91-9261077888
info@cadadda.com
TRAINER PROFILE
Autodesk Certified Instructor
having More than 8 years of
Bhupesh Kumar
(Director CADADDA)