Professional Documents
Culture Documents
Rd-011 Future Process Model HCM v1.0 Delta
Rd-011 Future Process Model HCM v1.0 Delta
Approvals:
<Approver 1>
<Approver 2>
1 Document Control
1.1 Change Record
5
1.2 Reviewers
Name Position
Arun Samal HCM Track Lead (TCS)
Madhusudan Jakkam Program Manager (TCS)
Mahesh Sahoo Program Director (TCS)
Contents
Contents
1 Document Control ..................................................................................................... iii
1.1 Change Record ........................................................................................................... iii
1.2 Reviewers .................................................................................................................... iii
Introduction ..................................................................................................................................... 6
1.3 Core Human Resource ................................................................................................. 7
1.4 Self Service Management ............................................................................................ 7
Introduction
The Future Business Process Model document is to describe the detailed process design for each level 3
process. This document specifically focuses on the following human capital management areas:
This document is intended to provide a holistic view of all the key elements of the future process design. This
document is a key output of the global design phase and is intended to support the system configuration and cluster
rollouts.
L1 L2 L3
Manage Work
L3.1.1.1 Maintain Organization Hierarchy
Structure
L3.1.2.1 Manage New Hire
Human Capital Management (HCM) Event Catalog for Human Capital Management 8 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Human Capital Management (HCM) Business Actors for Human Capital Management 9 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
This document is intended to provide a holistic view of all the key elements of the future process design and is a key output of the global design
phase and is intended to support the system configuration and cluster rollouts. Business Process Model for HCM Processes are depicted in the
diagram below which gives an overview of L1 to L3 level processes.
Human Capital Management (HCM) Process Descriptions for Human Capital Management 10 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Core HR module provides the functionality of managing employee life cycle effectively which includes:
Human Capital Management (HCM) Process Descriptions for Human Capital Management 11 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Human Capital Management (HCM) Process Descriptions for Human Capital Management 12 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
1.2.2.1 Submit a request through Self Services to update qualification information On Request
Notes Automation
Employee will submit a request to update his/her qualification information from employee self- System Assisted
service responsibility.
Output ID Title Type
ID Description Frequency
This is a decision making point. Employee Services specialist will review the request raised System Assisted
by the employee and verifies the details prior to approval. If request is approved, there will be
system update else reject notification will be triggered for employee.
Output ID Title Type
ID Description Frequency
1.2.2.3 If employee has chosen primary qualification, previous qualifications become On Request
secondary
Notes Automation
System validates and checks if the request is for primary qualification, previous qualifications System Assisted
become secondary.
Output ID Title Type
Human Capital Management (HCM) Process Descriptions for Human Capital Management 13 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
If request is rejected, employee is notified of request rejection as a self-service notification. System Assisted
Output ID Title Type
Process ends
ID Description Frequency
Once Self-service specialist approves the request, employee is notified of qualification System Assisted
request approval.
Output ID Title Type
Process ends
Human Capital Management (HCM) Process Descriptions for Human Capital Management 14 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Human Capital Management (HCM) Process Descriptions for Human Capital Management 15 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Employee can cancel and update the approved leave even after the leave start date. The approval flow remains the same as the original approval flow
(as per leave type) with an additional approver as City Leaves Team.
Human Capital Management (HCM) Process Descriptions for Human Capital Management 16 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Human Capital Management (HCM) Process Descriptions for Human Capital Management 17 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Human Capital Management (HCM) Process Descriptions for Human Capital Management 18 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
2.1.7.1 Submit request through self-service to enroll/re-new/cancel dependent enrollment for On Request
medical insurance
Notes Automation
Employee submits request through self-service to enroll/re-new/cancel the dependent enrollment System Assisted
for medical insurance. For father and mother, employee has to choose the class of insurance. After
request submission it goes for approval to Medical Insurance Officer.
Output ID Title Type
ID Description Frequency
Medical Insurance Officer reviews the request and do the needful whether to approve or reject the System Assisted
request.
Output ID Title Type
ID Description Frequency
Medical Insurance Officer if approves the insurance request, employee will be notified of request System Assisted
approval.
Output ID Title Type
End of Process.
Human Capital Management (HCM) Process Descriptions for Human Capital Management 19 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
Medical Insurance Officer if rejects the insurance request, employee will be notified of request System Assisted
rejection.
Output ID Title Type
End of Process.
Human Capital Management (HCM) Process Descriptions for Human Capital Management 20 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
2.1.8.1 Employee submits request for update in existing bank details On Request
Notes Automation
Employee submits request through self-service to update his account details which may include System Assisted
change in IBAN, Account No etc.
Output ID Title Type
2.1.8.2 System checks for validations and allows if all criteria is met
ID Description Frequency
2.1.8.2 System checks for validations and allows if all criteria is met On Request
Notes Automation
There are many validations that system checks as follows: System Assisted
The Requestor will not be able to initiate the request if the flag Fixed has a value ‘Yes’
Requestor will only able to update the existing IBAN. They cannot Create a new or Delete
an existing one
The Account Number should be same as the last digits in the IBAN
The Length of the IBAN field should be of 24 digits
Attachment is Mandatory while submitting the Request
Human Capital Management (HCM) Process Descriptions for Human Capital Management 21 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
Payroll manager reviews the account update request and takes necessary action. System Assisted
2.1.8.4 System updates employee account details with the new IBAN from previous period
pre-payment+1 day
Employee is notified of request rejection
2.1.8.6
ID Description Frequency
2.1.8.4 System updates employee account details with the new IBAN from previous period On Request
pre-payment+1 day
Notes Automation
The Bank details should be changed in the system. The Bank details will get changed effective System Assisted
from the day+1 last prepayment completion date in the system. The Previous Bank details will be
end dated and stored as a history
Output ID Title Type
ID Description Frequency
Process ends.
Human Capital Management (HCM) Process Descriptions for Human Capital Management 22 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
Process ends.
Human Capital Management (HCM) Process Descriptions for Human Capital Management 23 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
2.1.9.1 Employee submits request for adding new documents with relevant details and On Request
attachments
Notes Automation
Employee submits request through self-service to add/update new documents. System Assisted
Output ID Title Type
2.1.9.2 Checks for attachments and duplication of documents. Validation Check cleared?
Human Capital Management (HCM) Process Descriptions for Human Capital Management 24 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
ID Description Frequency
2.1.9.2 Checks for attachments and duplication of documents. Validation Check cleared? On Request
Notes Automation
Employee submits request through self-service to add/update new documents System Assisted
Output ID Title Type
ID Description Frequency
City Insurance custodian reviews the request through self-service and does the needful. System Assisted
Output ID Title Type
ID Description Frequency
City Insurance custodian reviews the request through self-service and approve. System Assisted
Output ID Title Type
ID Description Frequency
Human Capital Management (HCM) Process Descriptions for Human Capital Management 25 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
Process Ends
ID Description Frequency
Process Ends
Human Capital Management (HCM) Process Descriptions for Human Capital Management 26 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
HCM process flows have been included in the Process Step Catalog section for Core Human Resource and Self Service.
Human Capital Management (HCM) Process Flow Diagram for Human Capital Management 27 of 30
RD.011 Future Process Model Doc Ref: NWC_HCM
8 Inflight Projects
Attached here with the inflight project items
The below list of inflight projects has to be considered for Central and Eastern cluster. These projects have been rolled out for NWC between 25
Jun 2020 – 03 Dec-2020. This is in alignment to list shared by EY.
11 Glossary of terms
Terminology Definition