Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE

Tel: 619-861-4155
marc@ncssltd.com

OBJECTIVE: To continue to strive for World Class Excellence thru practical application of; experience, skills
both technical and soft, and institutional knowledge in a highly motivated, proactive, and team orientated
environment.

PROFILE: Internationally Certified Agile Project Management Professional by Project Management Institute,
Registered Professional Engineer in with over 30 years Construction / Engineering Industry Estimating and
Management experience required for Federal DOD / MILCON, Commercial, Institutional, Industrial, Civil and
Municipal Building Construction including; Heavy Waterfront Civil, Special Systems, Anti Terrorist Force
Protection, Access Control, Intrusion Detection and CCTV Surveillance with; Emerging Technologies;
Biometric Recognition, Layered Voice Analysis, Motion Detection and other Physical Control Measures, as well
as Renewable Energy such as Photovoltaic and Wind Energy $10K to $10 million.

PROFESSIONAL EXPERIENCE:
National Consulting Service LLC, July 2011 – Present, Currently providing Independent Consulting Services
of Program, Project, Construction Management, Estimating, Scheduling, Quality Control, Safety, Risk and
Controls Management, Forensic Schedule Delay Analysis, Claim Management, Business Development to
support Small Business, 8a Certified, Veteran, HUB Zone Businesses and similar work in compliance with the
Federal and Municipal Contracts by utilizing Best Management Practices for Control of Scope, Schedule,
Budget to various Clients, and Contractors.

San Diego Unified Port District, November 2002 – July 2011, Project Manager / Contract Manager
Engineers, Construction Managers International, July 1998 – May 2002 Project Engineer
SILVERTON Construction Company, Inc, April 1982 July 1998, Project Manager, Engineer, CQC Manager
KEERS Environmental Inc., January 1996 December 1996, Regional Manager
SamCorp General Contractors, January 1995 December 1995, Project Engineer, CQC Manager
Banes General Contractors: El Paso, Texas, January 1994 December 1994, Project Manager

LICENSES / EDUCATION / CERTIFICATION / TRAINING / ORGANIZATIONS

Registered Professional Mechanical Engineer; California Board #35568, Texas Board #138031
Colorado Board #PE0057350, New Mexico Board #26262, Utah Board 11686864-2202, Nevada Board
#027531, Washington Board #220008489, Wyoming Board #18969, Arizona Board #75673, Georgia Board
#PE048673.

Project Management Institute – Project Management Professional Global Certificate: 2772711

Bachelor of Science in Mechanical Engineering: University of Texas at El Paso, May 13, 1994
US Army Corps of Engineers / NAVFAC Construction Quality Management For Contractors - #784 (2011)
OSHA 30 – Certificate Number 2337601 (2012)

Computer Skills: Microsoft Office to include; Microsoft Word, Excel, Powerpoint, Outlook, Access, Microsoft
Project, Prolog Project Manager, Primavera P, Sure Track, WordPerfect and Quattro Pro, Lotus 123, DBASE
III, AutoCAD, United States Army Corps of Engineers “RMS” Program, SAP, and other vertical software
applications.
Bilingual Fluent English and Spanish
US Army Corps of Engineers / NAVFAC Construction Quality Management For Contractors - #784 (2011)
OSHA 30 – Certificate Number 2337601 (2012), EPA Training: Asbestos Abatement Contractor / Supervisor
Training, Asbestos Inspector and Management Planner, Lead Abatement Contractor / Supervisor Training.

1
Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE
Tel: 619-861-4155
marc@ncssltd.com

PROJECT HISTORY

Controls Management: Support Emerging Business to Execute Scope, Track Budgets, Create
Schedules, Manage Change Orders to Client and Sub-Contractors for Luxury Resort Homes
($70-$80 Million) at Montage Saggio Hills, Healdsburg CA.

Construction Manager for Officer In Charge of Construction (OICC) Naval Air Weapons
Station China Lake: Support Contracting Officer Representative as Construction Manager for
Naval Air Weapons Station China Lake Earthquake Recovery Program. Projects supported:
P1903 Michelson Lab $98 Million, and RM19-1867 Wings 2-5 Renovation $93 Million.

Development of Small Business and Certification with Support (Various Clients and
Projects): Direct and Support Existing and Emerging Business to Execute Process for
Registration and Certification of Federal, State and Municipal Solicitations and Set Aside
Contracts

Project Manager: B St Cruise Ship Terminal North Berth Fender Upgrade-San Diego , CA
Procurement, Scheduling, Contractor Change Orders, Submittals, Close-Out $2.1mil to Replace
Existing Wood Fender Pile System with 24” Square Concrete Pile, Steel Waler and 8’ Foam Filled
Fenders Primary System, 14” Square Concrete Pile, Wood Fender with Composite Camel
Secondary Fender System.

Estimating / Program Management: (Various Clients and Projects). $100K - $2mil Provide
with Oversight to Various General Engineering / Contractor, Structural Concrete and Masonry
Team Managing Estimating, Administration / Management / Controls.

General Management Forensic Schedule Delay Analysis: (Various Clients and Projects)
$10K-$500K Change Orders: Analyze Communications, RFIs, Schedules and Change Order
Request for Delay Cost of Storm Drain System at no fault of the Contractor, and generate
Request for Equitable Adjustment to the Contract

Federal Program Manager: NAVFAC SW Expeditionary Warfare – Marine Corps Air Station
Quantico VA Marine Barriers. IDIQ Contract Task Order of $0.23mil marine barrier
replacement service contract to provide new buoys, and service contract to remove and replace
spring and fall (5 year contract).

Project / Design Manager: National Oceanic and Atmospheric Administration (NOAA) –


Suiteland VA SOF OM4 Cabling Infrastructure Upgrade and 10 Year Design. $0.28mil
Design-Build OM4 Fiber-Optic Cabling and 10 year infrastructure design for future growth.

Design Manager: NAVFAC SW, Naval Air Station El Centro Theatre, $0.53mil Design-Build
interior renovation of NAS El Centro Theatre, including; Acoustic Panels, New Seating, Curtains,
Epoxy Flooring, Carpet, Lighting, and minor electrical.

Design Manager: NAVFAC SW, Marine Corps Combat Complex 29 Palms – Bathhouse
Renovation, $0.35mil Design-Build ADA improvement and renovation of MCCC 29 Palms CA,
bath house including; concrete, doors, frames, hardware, accessories, furnishings, floor finishes,
plumbing, minor electrical.

2
Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE
Tel: 619-861-4155
marc@ncssltd.com

Design Manager: NAVFAC SW, Naval Air Station Coronado – Hotsite Refuling, $0.29 mil
Design-Build Airfield Paving and Petroleum Distribution with controls renovations and upgrades to
provide new concrete fueling hotsites with remote pump controls.

Design Manager: NAVFAC SW, Amphibious Base Imperial Beach – Fishhouse, $0.56 mil
Design-Build Demolish existing Fish house Structure and Utilities, Relocate utilities, New
Concrete Paving, Install New Armag Units with low voltage intrusion detection.

Design Manager: Command 3rd Fleet Complex, Building #56, Naval Training Facility, $1.7
Million Multi-Phase Project. Design Build HVAC System and Fire Alarm System of 55,000 square
foot Training Facility. Replacement of two existing 250 Ton Water Chiller Units with new single
450 Ton Water Chiller Unit, replacement HVAC Fan Coil Units, replacement of Analog Fire Alarm
System and CO2 Subsystem with new I.P Addressable Fire Alarm System.

Design Manager: Command 3rd Fleet Complex, Building #58, Naval Training Facility, $0.5
Million Project. Design Build Fire Alarm System of 24,000 square foot Training Facility.
Replacement of Analog Fire Alarm System and CO2 Subsystem with new I.P Addressable Fire
Alarm System.

Project Manager: Tenth Avenue Marine Terminal Communications and Fire Alarm Upgrade,
$0.96 Million Project to replace 50 year old Communication Cabling and Fire Alarm System with
fiber optic cabling and code compliant I.P. Addressable Fire Alarm System.

Project Manager / Construction Manager: Port-Wide Accessibility Improvements Phase II,


$1.6 Million Project to remove over 350 accessibility barriers to pedestrians in 176 work areas of
the District’s 5 member cities.

Project Engineer / Construction Manager: National Distribution Center, Tenth Avenue


Marine Terminal Communications and Fire Alarm Upgrade, $0.96 Million Project to replace 50
year old Communication Cabling and Fire Alarm System with fiber optic cabling and code
compliant I.P. Addressable Fire Alarm System.

Project Enginer / Construction Manager: Tenth Avenue Marine Terminal and National City
Marine Terminal Security Lighting, $1.3 Million High Mast Lighting Project funded by
Department of Homeland Security Grants.

Project Manager / Construction Manager: Navy Pier North Berth, $0.4 Million Project to
install Concrete Fender Piles.

Project Manager / Construction Manager: Port-Wide Integrated Access Control, $0.6


Million Project to install integrated access control system for 10th Ave Marinte Terminal, National
City Marine, B St Cruise Ship Terminal with Biometrics and TWIX compatibility into District Wide
Homeland Security System.

Project Manager / Construction Manager: Port wide Fender Pile Replacement Program,
$0.5 - $0.75 Million per Fiscal Year; 2009, 2008, 2007, and 2006.

Project Manager / Construction Manager: Tenth Avenue Marine Terminal Perimeter High
Intensity Security Lighting, $2.2 Million High Mast Lighting Project funded by Department of
Homeland Security Grants.

3
Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE
Tel: 619-861-4155
marc@ncssltd.com

Project Manager / Construction Manager: National City Restricted Area Surveillance, $0.8
Million Project to install National City Marine Terminal Restricted Area Surveillance System with
advanced motion detection, and integrate into District Wide Homeland Security System.

Project Manager / Construction Manager: Tenth Avenue Marine Terminal Intrusion


Detection System, $0.7 Million install Tenth Avenue Marine Terminal and Fuel Bunker Facility
Intrusion Detection System and integrate into District Wide Homeland Security System.

Project Manager / Construction Manager: B St. Cruise Ship Terminal CCTV Security, $0.6
Million install B St Cruise Ship Terminal CCTV System and integrate into District Wide Homeland
Security System.

Project Manager / Construction Manager: Searless Valley Minerals Conveyor, $3.5 Million
Project to modify and rehabilitate existing conveyance system.

Project Manager / Construction Manager: Track and Pavement Improvements, Tenth


Avenue Marine Terminal, $1.9 Million Project to modify and rehabilitate existing rail system, and
install HMAC pavement.

Project Manager / Construction Manager: Hydraulic Security Barriers B Street Cruise Ship
Terminal, $0.7 Million Project to install new Hydraulic Bollards and Barriers at existing Cruise
Ship Terminal.

Project Manager / Construction Manager: Port-Wide and National City Marine Terminal
Security Enhancement, $1.9 Million Project to install Wireless Network with real time video
feed and advanced motion detection for waterside surveillance of various District Assets.

Staff Associate Engineer: San Diego Unified Port District Broadway Cruise Ship Terminal,
$15 million Development Project of existing Broadway Pier to support expanding Cruise Ship /
Tourist Industry with Center City Development.

Staff Associate Engineer: San Diego Unified Port District Chula Vista Bay front
Masterplan, $80 million Development Project Tourist Industry with the City of Chula Vista and
other four Port District Member Cities.

Project Manager / Construction Manager: National City Marine Terminal Security Fence
Improvements,$0.35 Million Project to install United States Coast Guard compliant Chain Link
Fence.

Project Engineer / Construction Manager: Southwest Marine Pier 1, Multi Phase $5.2 Million
Project to Demolish existing wood Structure pier and replace with Concrete Structure.

Project Engineer / Construction Manager: San Diego Unified Port District HVAC
Renovation, $1.2 million in Projects to renovate existing HVAC including cooling tower , boiler
and new Direct Digital Control System.

Project Engineer / Construction Manager: San Diego Unified Port District Office
Renovations,$2.0 million in Projects to renovate and or modify staff offices and facilities at
various locations through the use of Job Order Contracting, Public Works, and Negotiated Work.

4
Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE
Tel: 619-861-4155
marc@ncssltd.com

Project Engineer / Construction Manager: Shelter Island Transient Boat Dock, $1.7 Million
Project to construct a New Transient Boat Dock Facility.

Staff Associate Engineer: San Diego Unified Port District North Embarcadero Visionary
Plan, $50 million Development Project of the North Embarcadero and realign Harbor Drive San
Diego CA with Center City Development

Project Manager / Construction Manager: Tenth Avenue Marine Terminal Security Fence
Improvements, $0.4 Million Project to install United States Coast Guard compliant Chain Link
Fence.

Staff Associate Engineer: San Diego Unified Port District Lane Field, $40 million
Development Project of existing Lane Field to Hotel and Parking Structures to support expanding
Cruise Ship / Tourist Industry with Center City Development.

Project Engineer: Fabens ISD Renovation Program, Multiphase $10.0 Million Contract with
FISD as Construction Manager at Risk to complete; Additions, HVAC Renovations, and a new
Junior High School.

Project Engineer: University of Texas Neuhaus Royal Athletic Facility, $10.5 Million
Contract with the University of Texas Systems. Project included: Addition / Alteration of the
existing multistory Athletic Facility. Completed with new; Finishes, Specialties, HVAC and Life
Safety.

Project Engineer: (THAAD) Theater High Altitude Air Defense 1st Objective Battalion O&M
Facilities, $11 Million Contract with the US Army Corps of Engineers, Fort Worth District, Fort
Worth Texas. Project included: 2 ea. State of the Art Multi-level Tactical Equipment Maintenance
Shops with; Elevators, 4 ea. 25 Ton Overhead Cranes, Inspection / Maintenance Pits, Fiber
Optics Communications, 200 KVA Substation, Structural Steel Frame with Thin Shell Composite
Panels. 9 Acres 8 inch Concrete Paving, Site Improvements and Lighting.

Assistant Project Engineer: El Paso International Airport Expansion / Renovation, $13


Million Contract with the City of El Paso to renovate and expand the Municipal Airport. Scope
included; Site Improvements, Renovation Interior and Exterior.

Assistant Project Manager / Assistant Superintendent: Vehicle Maintenance Shops, $11


Million Contract with the US Army Corps of Engineers, Fort Worth District, similar to THAAD as
described above

Project Engineer / Assistant Project Manager / Quality Control Manager: Sergeant Major
Academy Expansion, $6.4 million contract with the US Army Corps of Engineers, Fort Worth
District. Scope included 80,000 SF Multi-Level addition of Structural and Architectural Concrete,
Computer Flooring, Landscaping and Site improvements.

Field / Project Engineer: Northwest Regional Command Center,$4 Million Contract with the
City of El Paso to Build: Multi Level Structural Concrete with Solid Precast Terrazzo Shell, Site
Improvements and Landscaping.

5
Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE
Tel: 619-861-4155
marc@ncssltd.com

Project Manager: Migrant Farmers Center, $0.4 Million Contract with the City of El Paso to
Build: Radial, Multi Level, CMU, Slab on Deck, Site Improvements and Landscaping.

Superintendent: North East Transportation, $0.3 Million Contract with the Ysleta Independent
School District to Design Build / Erect: Single Level Maintenance Shop with Inspection Pits and
Administration Area, Site Improvements

Project / Field Engineer: El Paso High Stadium, $1.2 Million Contract with El Paso
Independent School District to demolish and rebuild Historical Concrete Stadium.

Project / Field Engineer: Diana Ditch Improvements, $1.6 Million Contract with the City of El
Paso to Reline Storm Water Drainage System, to include 5 new Bridges / Box Culverts.

Field Engineer: Indian Hills Middle School, $11 Million Contract with El Paso Independent
School District: Multi Level Facility, Slab on Grade, Slab on Deck, Structural Steel, CMU, Brick
Veneer, Elevators, Physical Plant, SSMR System.

Project Superintendent / Field Engineer: Blackie Chesser Park, $1.8 Million Contract with
the City of El Paso to Build Multi Sport Complex to include; Irrigation, Landscaping, Lighting,
Paving, Fencing, etc.

Field Engineer: US Armed Services Reserve Center, $6 Million Contract with the US Army
Corps of Engineers, Fort Worth District to Build in Harlingen Texas: Administrative and
Maintenance Facilities for the Armed Forces Reserve. Slab on Grade, Structural Steel, CMU,
and SSMR System.

Field Engineer: Montwood High School, $14 Million Contract with Socorro Independent School
District: Multi Level Facility, Slab on Grade, Slab on Deck, Structural Steel, CMU, Brick Veneer,
Elevators, Physical Plant, SSMR System.

Superintendent: La Tuna Federal Correction Facility,$1.8 Million Contract with the US Corps
of Engineers to provide Utility Improvements: Install 300,000 gallon above ground water storage
tank, Well and Pump Station and new water lines. Security Clearance Required.

Field Engineer: Sergeant York Target Range, Contract with the US Corps of Engineers to
provide; Maintenance Facilities, Bleachers, Concrete Paving, Grade Road Access to remote
Target Locations in a 100 Square Mile Area.

6
Program, Project, Controls, Construction, Management, Estimating Marc Uribe, PMP, PE
Tel: 619-861-4155
marc@ncssltd.com

References

Glenn Goddard, PE, PMP. Deputy Director, Military Programs at HQ, U..S. Army Corps of
Engineers, (Reserves) Sr. Project Manager · Parsons

Dixon Smith, Rear Admiral (Ret) · Executive Vice President · R.E. Staite Engineering, Inc.

William Richardson, CEO Veremetrix Security Solutions, LLC.

Hector Romero, Executive, Just Construction, Inc

Ernesto Medina, P.E., Chief Engineer, San Diego Unified Port District.

Robert S. Austin, P.E., Senior Engineer, San Diego Unified Port District.

Amir Liberman, LVA Technology Inventor and CEO of Nemesysco, LTD