ANNEXURE-23
DRAWINGS, SOIL REPORT, DETAIL OF WORKS & ITEM RATES FOR THE
CONSTRUCTION OF MOUNDED VESSELS AT BIKANER LPG BP
Note:
Drawings attached with the tender document are for reference purpose only. Tenderers are advised to
quote by rechecking the quantum of work.
Estimate for construction of 2 x 450 MT capacity Mounded Type Pressure Vessels at LPG
Bottling Plant Project Bikaner (RJ)
SL PART A - Fabrication, erection and testing of 2 x 450 MT Qty Unit Rate in Rs Amount in Rs
No. Mounded type pressure vessels for storage of LPG
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas of all kind of
soil (average depth 3 M for ground improvement ) including
1 disposal of excavated earth within and outside site to 6,425 m3 146.00 938,050.00
unobjectionable place, disposed earth to be levelled and neatly
dressed.
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas of all kind of
soil (average excavation 3 M excavation) on account of
2 Retaining Wall) including disposal of excavated earth within 587 m3 146.00 85,702.00
and outside site to unobjectionable place, disposed earth to be
levelled and neatly dressed.
Supply and filling with 75mm thick murrum/gravel in layers not
exceeding 20cm in depth, each deposited layer to be
3 6,425 m3 693.00 4,452,525.00
compacted by ramming,watering and dressing complete(3 M
for Ground Improvement upto FGL)
Providing and laying in position ready mixed concrete
of M30 grade, manufactured in fully automatic batching plant
and transported to site of work in transit mixer for all leads
having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work
4
including pumping of R.M.C. from transit mixer to site of laying ,
2,368 m3 6,673.00 15,801,664.00
including the cost of centering, shuttering finishing and
reinforcement including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
ESTIMATE FOR ALLIED WORKS ASSOCIATED WITH 2 x 450 MT MOUNDED TYPE PRESSURE
VESSELS FOR LPG STORAGE AT LPG BOTTLING PLANT,BIKANER (RJ)
TOTAL 976025
Name of Work: Supply and Installation of GMS System for proposed 2 x 450 MT Mounded Storage
Bullets including its Integration with the existing system at Bikaner BP (RJ).
FLP On/Off switch with FLP JB for FTU isolation No. 2 1,814 3,628
5 Supply of FLP Hooter and fittings No. 2 12,892 25,784
FLP Hooter with Intrinsically Safe Output and Auto Reset Timer facility suitable for
above FTUs.
6 FTU MOUNTING ACCESSORIES No. 2 2,148 4,296
FLP 4 Way junction boxes with gland
Job includes erection & installation of FLP/. WP enclosures for FTUs in Hazardous
Area.
7 New Microprocessor Based Intelligent Mimic Repeater Panel complete with No. 1 24,142 24,142
arrangement suitable for mounting in secuirity cabin and having -
Multicoured Plant Mimic & 3 LED indications for each detector
ACC, RES, TEST CONTROLS
Panel Buzzer
Master Indiactions
RS-485 Interface for Main Controller
8 Computer interface controller unit (CIU) suitable for communication with FTUS Set 1 60,356 60,356
and PC and to be installed in safe area and having -
Micro controller based operations
Suitable keyboard & LED display for programming & % LEL
RS-232 interface for PC
RS-232 interface for mimic repeater
Relay OP for external alarms
9 Supply and Fitting of Windows Based GMS Sofware customised to the specific Set 1 50,137 50,137
requirements of LPG Plant and Compatible with software of main GMS controller
with provision for system programming and having following features
2 Erection & installation of FLP/weatherproof enclosures for field mounded FTUs No. 2 2,387 4,774
3 Digging trenches for cable lying and back filling, spreading extra soil, levelling etc. M 350 120 42,000
4 Laying of armored cable under ground in trenches or above ground in tray 3C x 1.5 M 1,500 76 114,000
sq.mm.
5 Fixing of GI tray 100 width M 80 138 11,040
6 Laying of GI pipes 50 mm dia. M 50 184 9,200
7 Testing & commissing of system including loop checking, cable testing, calibration etc. LS 1 23,875 23,875
TABLE OF CONTENTS
Sheet No.
TABLES
Table No.
Soil Profiles ·············· .-.. 1 & 2
Add! tional Laboratory Tet'ftRe suIts •.••.....•.. 3
Engineering Descpiption of Soils ••••.•...•••.. 4
ILLUSTRATIONS Fig. No.
1• a INTRODUCTION
~
~ 1.1 Project Description
l
from Bikaner city. C.R. Engineering Works Ltd. a re
installing a 14m diameter' Horton Sphere at the project
site.
A11 t est 10cat ion s ;'1(' e s h 0'." non t:,i g • No.1 and
given to us by the client.
Sheet No.
CENG~S GEOTECHNICA PVT. LTD. Job No.
95334
-
sampler to IAI rods and driving it by 45cm using a 65 kg
hammer falling freely from a height of 75cms. The test
was conducted in accordance wi th IS: 2131. The number. of
.1
~
loose mater-ials or cuttings from the bor-ing operations .•
The cumulative number of blows r¢quired to penetrate the
balance 30cm of the split spoon sampler is termed the
_: SPT value or the 'N' value. The. IN' values are presented
on the soil profiles for each bore~ole.
1
-.1
samples were collected by attaching a 75cm diameter thin
walled 'Shelby' tubes and dr-iving the sampler using a 65
kg hammer in accordance wi th IS: 2132. The tubes were
sealed wi th wax at both '..:;ds. All samples were
.1 transported
examination
to our
and testing.
Delhi laboratory for further
IS : 1498 -1970
!cLAY ~ SILT
FINE
SANO
I MEDIUM IcoARSE
~~o\itJ
90
~t/
~
L,..-- •.... -~-.. ~
V
I-
:r:
80
V V- i••••~.
-,V I.---
I
V ~-
~
~70 -- I 1/ , v .1 t '" ~"I
I I I ,
~~
~V L" ~IT,
~ 60
a: I.•••• ~
n,' V
I I,
~ 50 I I
t....
j
~V v I
40
I-
z V [j' ii-I'
I
I
"
I .
w I ;
u 30
./ v
a: I I 'i I
I
\oJ
o, 20 I •...
i
10
i"""'"' - - ..•.~~
./ ~
,Y
I PieoRE n.:'~,..n'PTION
PARTICLE
GRAVE SAND
SIZE, mm
~L T
.'
CL AY D60 D,O Cu
I
. . ~f: ~~ ~ l' Z Z
~--~---~----~--------------+-~--~~~~~~--~~----~~
1o o
0.00 FINE SANO(SP_ S ••••
) 95 5 0.16 0.09 1.78
.-...
GPAVEL (S ••••) 20 62 18 0 0.37
~-.---
SANDY SILT WITH
1 4.50 GRAVEL (twlL) 9 38 41 12 0.18
..
.
t.~t
TENDER NO: HCC/LPG-02/PT-08/2017-18
!cLAY SILT
I SAND
~~--J
100
FINE
I MEDIUM !COARSE
. V
90 / ~ .•.• ""'"
....•... ~
~ 80 ~~ 10- l-
X ~ 'J -
o ./" :,.....
w
~ 70
. I~
I}
~ 60 - I
liJ
z 50
W
j I
I,j,.
J I
~ 40
Z I
uJ ·1,
U 30 ,
a:
IoU
o..
20
i /i t-
. r7 I
10
~
1/y
'1,,'
r... J,..ooll
.j I
000 001 0·1 10 10
PARTICLE. SIZE, mm
L)~· ~BORE ~~
!-OLE m
C£ SCRIP T ION I~E4S~
1 z ! Z
SlLT
i'
, CLAY
I ~
0
60
D.,...
IV ..
COo
", I
- 2 10.00
flNf SAND (SP r
0 97 03 0 ~.165 0.099 1.67
---- 2 1.50 FI HE SAND (SP 05"')
8 82 !O 0 ,.
~.21 10.075 2.80
Sil TV FINE SAND WITH
-~-.- 2 2.25 GRAVEL 15M) 18 68 14 0 p.20 10.064 ~.13
..
.
G~ 5aE ANALVSIS
.. 6
FIG NO.
IS . ;498 -1970
SAND
1r.D&x.1
CLAY SIL T
.I
FINE MEDIUM fcoAASE
! I ' II II i , I : 1
, I I.
I~
90 ..•
,
~ 80
V
~
I! i<"""
~
/
~ //
UJ
3'70
I / ' ,
~ !
/ ,..~'
lii 60 - I ,,/ -' " I
-.: V I I '
~ 50
/ .~i-'
~ ;
I / .I. 111
I- 40 ~.1
z
~ 30
J i/
, II
I
I'! I,
C!
IfJ
(~,20 _- - _ ..
'-
- I-
I
/ ... -. -
I
----- I ._.,-- >--- ---
- ..•.
•.... I«- / .. -.-- ..
I
"
--
,....- ~ ••.. ,....1-'
~ 11
I-"
j
i ! I
OCQI 001 10 I()
PARTICLE SIZE, mm
"
. -,
#\BOR£
rO...E ~SCR1PTION
GAA.\/E
4
SAND
Z
SILT
Z
CLAY
" 7.
\' . 0
60
010 CI..I
-I 2 3.00
SANOY SILT WITH
GRAVEL (S~) 8 35 44 13 0.088
SANDY SILT WITH
---- 2 5.00 GRAVel (S~) 15 35 41 9 0.19 0.032 59.38
• t',
r t----------~~~
PRO.JEeT' JOCI. IfOR'l'ON SPHERES
---.
-..-.--
....
AT n I ~ANER. JOB No. 95334
-------t-----.--..~--_t
5HEET No.
I
Page 252 of 502
-----------_ TENDER NO: HCC/LPG-02/PT-08/2017-18
.. _._---
§
5 ._
I t------L...------------
I-
BOREHOLE NO : 1
I OEPT"
IIUL~ oe-tlsny
: 2.25
: 1.84
•
,mice
DRY OI[NSITY : 1.67 ,./ee
I MOISTURE CONTENT
TYPE CW SAMPLE
: Satut.te4t
; Ae","'''' -.
_ SILTY FINE SAND
TYPE" SOIL
l
WITH GRAVEL
,
po
2. ..,
I C ; 0 kg/em
2
-
"E2. 0
tJ: 35"
-
~
II)
11).
L.I.I •.
a:
5
I
II i
/.
.> I
•••
II)
~
V
-:
V
o. 5
V ';
-:
..
o 0.5 1.0 1.5
".•
2.0 .2~5 3.0 3.5
NORMAL STRESS (kg/em! )
,- ,
...'
,
'.
DAAIN£D DIRECT SHEAR TEST'
I 0 CL H 0 r ~0 n 5 ph ere at 8 ik a n e r
I,
,
•t;
M
I '
~--~~------~~----------
BOA£HOl~ 2 NO
DEPTH 2.25
BULK DEMSIIY i ou
DRY D~N5ITY 1. &1.
• I
MOISTURE CONTENT., ': ~tura'CII
~ <
e:
I
2.
..
J '\
~~
~
c: 0 kg/cm
2 "r ,
I
-
~
0
~: JJO
':
-:
i
5
'1
"::d -:
V
V i
o. 5
V
/ -- ~.---
i
V
0 0.5 1.0 1.5 2.0 2.5
I
3.0 3.5
I
I
DRAINED DIRECT SHEAR TEST'
JOel Horton Sphere at Bikaner I
\.
1
Page 254 of 502
-------------------------------~~---~--~'~~,.--------------------
-.- ..- .-.. ---
TENDER NO: HCC/LPG-02/PT-08/2017-18
8.0 CLOSURE
mIl
'..
i.-
.; .
. . '
,.
,.., .,
__ ~
••
·u
c (.)
,0
.,e' 01
Triak4'
~;
T.!:S_t__
,I
C
.2
co
-
l
s:
!
c
C. SOIL DESCRIPTIGN e.-:-
4>
>
'~'
< v e
I.
I
I ~ ~
,0
u
-;:
0-
50
'"
';iE ;c
.. -
-cu
.~ ~t"'I
.s ~ E u"::
E ,
~ °iiic
•...-
-Ceo
-",u
:;-
z
--.,
e
C i
E
•
II)
§round Elevation : _226.~_J
~
~
"tI
;
Vl
e >,
~
II) L
~
U
>- :>
a
:J
•••
IQ
ii: •
z
- c
00
~u
I
cw--
0 •• 01
UCL:w:
:31
:..: i Ollil-
c-o
011(._c·-
.:
0.0
I
I -
Refusal to auger penetrati n.
I
!
oS 'Drai~d Di ~ect hear Test.
, ,
i ,
I! i
I
j
I
: ..
I I
i \ .
I
j I
I !
d
Page 256 of 502
IoeL Horton Sphere
-
p- 'i.ct : ' B. H. No. 1 r.bl. No.2
1 at Blkaner.
-
J T,,~i""ion0••"
- -,
.'-I'''
~r SOIL PROFILE
TENDER NO: HCC/LPG-02/PT-08/2017-18
-;,•• ,d'n.... Wlter rlbl. JJb No. 9533"
~ N-97, E-309. 5.20m. Not met.
- Grain Sizl Anll)'sis __ limit. > TriL'l',J T.!!L-
l.'! - ,..,
.'•... .E
·u .c..
I
II
Ii e
. I
! ,. c U
c. '. , 0
...•
.- . .~ ~,...
C>
~
HI
;;: '
e
..-05
II·'
•.•.. ,
e .s ;: E•... u..!:!
ii s: SOIL DES'.:RIPTIJN III
'
v'
0
c' ••
~ '0 ,~
50 -"' • ~
.., ,2
>
Z
. E.
0
III
E
•
to . 22·6.5m o -
>
•
"0
C
•••
tn to
I
i
I
U
>
.s ::J
,g-
..J
•
~
•••
:F.u
;
Z
Ce>-
o ~ 01
ua..~
01
~ '0 _u
c:
~ £.E
Ground Elevation i .
-- I I
0.00 Medium dense light gray I
1.00
Dsl
calcareous fine sand (SP)
0 97 3 ;
0
I I I I
Om) n. ! I
I
I I I
I
1. 50 Dense light brown calcareous a
31 SPTl 8 82 10 1
1. 95 fine sand with gravel, weakl I
I
cemented (SP-SM) 0
- silty fine sand (SM) , below - 33
2.25 UDSI 18 68 14 0 11. ec i 9. 7 0.5,LO ,
I
3.00 Dense to very dense light 8 35 44 i 13 30.2121. 7 ! !
37 SPT2 I
, I
3.4S b r own ce Lc a ro o us sandy silt
I I I ,
II
with calcareous nodules low
plas tic, weakly cemented (ML
I
I I ;
I ! I,
I 40/
4.50 SP!3I-
- dense, to 4.0m
very dense, below 4. Om i 29.5 20.7 I
4..
4.69 I
i
4cm
.•..
~
50/
5.0..0
,5.,20
SPT, :
I
"
•
'
•.
," 15 35 41 '
, 9
i
28.8 19.8 I i
;
5crn ;". .
.,' I
I - (5.2rn) i
Refusal to auger penetration. I
DS . oraJed 0 rect Shea) Test,
I \
I j
I
I
I
I
I I
I I -
.~
CENGRS GEOTECHNICA PVT. LTD. Job No. 95334 Table No. J
--
f
.
,.-
_. J
:t.,
~ i
~~ ~ CENGRS GEOTECHNICA PVT. LTD. Job He: 95334 Tablc He: I,
"7
I ,
CONSISTENCY OF COHESIVE SOILS BASED ON UNDRAINED
SHEAR STRENGTH TESTS
CONSISTENGY UNDRAINED SHEAR STRENGTH
KG/CM2
Very Soft Less than 0.1
Soft 0.1 to 0.L5
Firm/Medium o • 25 to O. 5 •.'!'
Stiff 0.5 to 1.0 ..
Very'·Stiff 1.0 to 2.0
Hard > 2.0
\l:.-.-.-.~.
I ~.
I (
I I
I L. C. ~~=======::::
I
I
EXISTING WALL
---',
I
I
-. I
I
I
I 5 P HERE
I
I '0_ 60 M BHI "
60 30 M j
!
I COLD
o 5
REPAIR:»
• I
I I
SHED
I I
SYMBOL o ESCRI PT ION
I •
6
BO REH OLE
OYNAIo4IC CON f PENETR
ATION TEST
~~
,
1 '- - --- --- -- '- -- I
i
I
I
2
I ~
,
'-
~ ....••.....
..•')
J
~ ,
....
,~
~ . .I
4 - - --.
'-r~~--------~
I • r--...
,
I
E
r--;
."
I
~
. '"
x
~ I
~ 6
'c"
~
7 .
-1
8 .l•••;:...
.~)
. ~.
.
'
-;
i
e~::
.... ;.
9
.:
..•~',.
~" LEGEND
SYMOOL TEST NO
DCPT 1
10 ----- DCPT 2
BH.l BH 2
o -r,
eo
. .i.
-.
r VALUE
7
.. .
r VAlU
[
'. '
"
.... '. -4'
-:.
,
. '
'
I.O~
"
, "
.. '
'
, "
·· ....
,
'
,
Z.O :, : 35
2 2.0 ~f-31
~".'..,
-,'
, "
.. ....
, ' , "
o. e.
·.-. '....
•.
,
"
"
I--
5012 em 40/4em
_;r
-
Q.
UJ 7 Symbol
LEG END
D2scription
Q
Sandy Silt
.' .
.
•
~.
2
,
I
3
\
,
l
'~ -.. ....
e 4 <,
1--
:z:
•••
Q.
5 K' \
........ '""' .....•.•.••.
...•.
-..,
\
\
"
I.IJ
Q 6
1
- .
8 I
1
I
1
I
~ ,
9 I
LEGENG
~ SYMBOL TEST NO
.-:-~8H - 1
JO ---- ., -_BH - 2
2.2 Groundwater
l
verifying the field classificat~on and developing
parameters for engineering analysis. All testing was
,'r- fo r med in accordance wi th the Current applicable IS
t
~--------~-----------------------------~----------~----
~
4.1 Geology
'.
Page 265 of 502
-'-
___ ----------------------------------------------------
TENDER NO: HCC/LPG-02/PT-08/2017-18
$-- --~"~.w.------------~
»:
"!Y
CENGRS GEOTECHNICA PVT. LTD. ;)1)5541
I 5
\-_ .•....
4.3 Groundwater
5.1 General
·....<i9-} QNGRS GEOTECHNICA PVT. LTD. Job No.953~1 " Sheet No.7
Where:
Wf = weight of foundation
Af = area of foundation
6.1 Excavations
I,~------------------------~
Page 269 of 502
r
I
I
----_. -----_.-----_ .._ ........•
»:
"':Y 9
___
l CENG~S GEOTEOiNICA PVT. LTD.j Job N'95334
L
I Sheet No. 11
_
SUMMARY OF PRINCIPAL FINDINGS AND RECOMMENDATIONS
l---" ---~--,I'---
TENDER NO: HCC/LPG-02/PT-08/2017-18
DRAWINGS, SOIL REPORT, DETAIL OF WORKS & ITEM RATES FOR THE
CONSTRUCTION OF MOUNDED VESSELS AT UNA LPG BP
Note:
Drawings attached with the tender document are for reference purpose only. Tenderers are advised to
quote by rechecking the quantum of work.
Estimate for construction of 2 x 600 MT capacity Mounded Type Pressure Vessels at LPG
Bottling Plant Project UNA (HP)
SL PART A - Fabrication, erection and testing of 2 x 600 MT Qty Unit Rate in Rs Amount in Rs
No. Mounded type pressure vessels for storage of LPG
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas of all kind of
soil (average depth 3 M for ground improvement ) including
1 7,211 m3 183.00 1,319,613.00
disposal of excavated earth within and outside site to
unobjectionable place, disposed earth to be levelled and neatly
dressed.
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas of all kind of
soil (average excavation 3 M excavation) on account of
2 1,380 m3 183.00 252,540.00
Retaining Wall) including disposal of excavated earth within and
outside site to unobjectionable place, disposed earth to be
levelled and neatly dressed.
Supply and filling with 75mm thick murrum/gravel in layers not
exceeding 20cm in depth, each deposited layer to be compacted
3 7,211 m3 867.00 6,251,937.00
by ramming,watering and dressing complete(3 m for Ground
Improvement upto FGL)
Providing and laying in position ready mixed concrete
of M30 grade, manufactured in fully automatic batching plant
and transported to site of work in transit mixer for all leads
having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work
4 including pumping of R.M.C. from transit mixer to site of laying , 2,828 m3 8,358.00 23,636,424.00
including the cost of centering, shuttering finishing and
reinforcement including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Supply of Reinforcement for R.C.C. including straightening,
cutting, bending, placing in position & binding all complete at all
5 285 MT 80,000.00 22,800,000.00
levels Thermo Mechanically Treated (TMT)Bars Fe- 500
grade,Conforming to IS1786
Providing and laying in position cement concrete of specified
grade below Raft excluding cost of centering and shuttering - All
6 552 m3 5,698.00 3,145,296.00
work up to plinth level 1:3:6(1 Cement : 3 Coarse Sand : 6
Graded stone aggregate of 20mm)
Concrete paver block 80 mm thk., of Grade M 40, on top of
7 973 m2 1,646.80 1,602,336.00
mound & slopes incl. 100 mm thk PCC M10 (1:3:6) (sqm)
Supply and laying of 80 mm thick paver block of Grade M 40 for
8 3,021 m2 1,077.00 3,253,617.00
pavement
All other civil work for mound including soil investigation, civil
design, sand filling and compaction, terram sheet supply and
laying at top, bottom & sides. PCC below pavement &
pathway(75 mm tck- M7.5), RCC (M15) for drains & underside
of gutter, RCC (M20) for beam on top (250 mm SQ) & stairs,
9 UPVC/RCC pipes and covering the PVC pipes with Pea Gravel, 1 LS 10,059,935.08 10,059,935.00
PVC sheet supply and laying on top and on sides,provision of
SS railing on top and on ladder, centering and shuttering,
painting, mound cover, stair, railing, pavement, drain, vapour
trap, kerb wall, etc. as per specifications & drawings, Snowcem
painting on retaining walls.
Supply of various sizes LPG Pipe line( 10" to 2") , Flanges, TEE,
Ebow, ROV, Gate Valve, Three Way Valves, EFCV, NRV, TSVs
etc as per site requirement for connecting the bullet to LPG
2 1 LS 14,059,950.50 14,059,951.00
pump house. Detail of item are given in tender document.
Details of this item are given & to be executed & measured
seperately
Composite Service tax @ 6%
Total For allied works- Part B 39,049,410.00
TOTAL AMOUNT WITHOUT SERVICE TAX (PART -A & B) 184,216,046.00
COST OF BQ PLATES(FREE ISSUE MATERIAL)FOR SER.TAX PURPOSE 25,335,000.00
COMPOSITE SERVICE TAX ON WORKS CONTRACT (%) 6.000 12,573,063.00
GRAND TOTAL 196,789,109
ESTIMATE FOR ALLIED WORKS ASSOCIATED WITH 2 x 600 MT MOUNDED TYPE PRESSURE
VESSELS FOR LPG STORAGE AT LPG BOTTLING PLANT,UNA (HP).
Plaster in side(6 mm) 0.50 800.00 0.000 400.00 SqM 158.00 63200.00
TOTAL 1222841
Supply and Installation of GMS System for proposed 2 x 600 MT Mounded Storage Bullets including its
Integration with the existing system at UNA BP (HP).
FLP On/Off switch with FLP JB for FTU isolation No. 2 1,814 3,628
5 Supply of FLP Hooter and fittings No. 2 12,892 25,784
FLP Hooter with Intrinsically Safe Output and Auto Reset Timer facility suitable for
above FTUs.
6 FTU MOUNTING ACCESSORIES No. 2 2,148 4,296
FLP 4 Way junction boxes with gland
Job includes erection & installation of FLP/. WP enclosures for FTUs in Hazardous
Area.
7 New Microprocessor Based Intelligent Mimic Repeater Panel complete with No. 1 24,142 24,142
arrangement suitable for mounting in secuirity cabin and having -
Multicoured Plant Mimic & 3 LED indications for each detector
ACC, RES, TEST CONTROLS
Panel Buzzer
Master Indiactions
RS-485 Interface for Main Controller
8 Computer interface controller unit (CIU) suitable for communication with FTUS Set 1 60,356 60,356
and PC and to be installed in safe area and having -
Micro controller based operations
Suitable keyboard & LED display for programming & % LEL
RS-232 interface for PC
RS-232 interface for mimic repeater
Relay OP for external alarms
9 Supply and Fitting of Windows Based GMS Sofware customised to the specifice Set 1 50,137 50,137
requirements of LPG Plant and Compatible with software of main GMS controller
with provision for system programming and having following features
2 Erection & installation of FLP/weatherproof enclosures for field mounded FTUs No. 2 2,387 4,774
3 Digging trenches for cable lying and back filling, spreading extra soil, levelling etc. M 350 150 52,500
4 Laying of armored cable under ground in trenches or above ground in tray 3C x 1.5 M 1,500 96 144,000
sq.mm.
5 Fixing of GI tray 100 width M 80 173 13,840
6 Laying of GI pipes 50 mm dia. M 50 230 11,500
7 Testing & commissing of system including loop checking, cable testing, calibration etc. LS 1 23,875 23,875
FW
`B'
'
`Y
'
`Y
`X' `X'
`X' `X'
D1
TO DRAIN
Indian Oil
PROJECT
BY INITIALS WORK
DSGN
CHKD
APPD TITLE
SCALE
NUMBER REV SHEET
ALL DIMENSIONS IN MM
UNLESS MENTIONED OTHERWISE
LPG/ENG/STD/KERB WALL 0
Page 367 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
DRAWINGS, SOIL REPORT, DETAIL OF WORKS & ITEM RATES FOR THE
CONSTRUCTION OF MOUNDED VESSELS AT RAIPUR LPG BP
Note:
Drawings attached with the tender document are for reference purpose only. Tenderers are advised to
quote by rechecking the quantum of work.
Estimate for construction of 2 x 600 MT capacity Mounded Type Pressure Vessels at LPG
Bottling Plant Project Raipur
SL PART A - Fabrication, erection and testing of 2 x 600 MT Qty Unit Rate in Rs Amount in Rs
No. Mounded type pressure vessels for storage of LPG
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas of all kind of
soil (average depth 2 M for ground improvement and
1 3,189 m3 156.00 497,484.00
excavation on account of retaining wall) including disposal of
excavated earth within and outside site to unobjectionable
place, disposed earth to be levelled and neatly dressed.
Earth work in excavation by mechanical means /
manual means over areas of rock (average depth 1 M for
ground improvement and excavation on account of Retaining
2 1,594 m3 244.00 388,936.00
Wall) including disposal of excavated earth within and outside
site to unobjectionable place, disposed earth to be levelled and
neatly dressed.
Supply and filling with 75mm thick murrum/gravel in layers not
exceeding 20cm in depth, each deposited layer to be
3 4,783 m3 746.00 3,568,118.00
compacted by ramming,watering and dressing complete(3 m
for Ground Improvement upto FGL)
Providing and laying in position ready mixed concrete
of M30 grade, manufactured in fully automatic batching plant
and transported to site of work in transit mixer for all leads
having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work
4 including pumping of R.M.C. from transit mixer to site of laying , 2,828 m3 7,443.00 21,048,804.00
including the cost of centering, shuttering finishing and
reinforcement including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Supply of Reinforcement for R.C.C. including straightening,
cutting, bending, placing in position & binding all complete at all
5 285 MT 68,000.00 19,380,000.00
levels Thermo Mechanically Treated (TMT)Bars Fe- 500
grade,Conforming to IS1786
Providing and laying in position cement concrete of specified
grade below Raft excluding cost of centering and shuttering -
6 690 m3 4,836.00 3,336,840.00
All work up to plinth level 1:3:6(1 Cement : 3 Coarse Sand : 6
Graded stone aggregate of 20mm)
Concrete paver block 80 mm thk. Of Grade M 40 on top of
7 973 m2 1,397.60 1,359,865.00
mound & slopes incl. 100 mm thk PCC M10 (1:3:6) (sqm)
Supply and laying of 80 mm thick paver block of Grade M 40
8 949 m2 914.00 867,386.00
for pavement
All other civil work for mound including soil investigation, civil
design, sand filling and compaction, terram sheet supply and
laying at top, bottom & sides. PCC below pavement &
pathway(75 mm tck- M7.5), RCC (M15) for drains & underside
of gutter, RCC (M20) for beam on top (250 mm SQ) & stairs,
UPVC/RCC pipes and covering the PVC pipes with Pea
9 1 LS 8,639,890.05 8,639,890.00
Gravels, PVC sheet supply and laying on top and on
sides,provision of SS railing on top and on ladder, centering
and shuttering, painting, mound cover, stair, railing, pavement,
drain, vapour trap, kerb wall, etc. as per specifications &
drawings, Exterior emulsion painting on retaining walls and
white wash on kerb wall.
ESTIMATE FOR ALLIED WORKS ASSOCIATED WITH 2 x 600 MT MOUNDED TYPE PRESSURE
VESSELS FOR LPG STORAGE AT LPG BOTTLING PLANT, RAIPUR (CG).
Fabrication & erection of piping works including flanges, elbows, Tee etc complete with NDT & painting:
38 Seam less #300 Pipe 10" 40 75 Mtrs 7200 540000
39 Seam less #300 Pipe 8" 40 10 Mtrs 5500 55000
40 Seam less #300 Pipe 6" 40 170 Mtrs 4700 799000
41 Seam less #300 Pipe 4" 40 75 Mtrs 3150 236250
42 Seam less #300 Pipe 2" 80 170 Mtrs 1800 306000
Erection of valves including supply of studs & gaskets etc.
43 NRV/l Valve #300 8" 6 Nos. 10000 60000
44 NRV/l Valve #300 6" 8 Nos. 8500 68000
45 NRV/l Valve #300 4" 2 Nos. 8000 16000
46 NRV/l Valve #300 2" 12 Nos. 5000 60000
47 TSVs 1" 15 Nos. 4500 67500
48 RCC foundation for pipe RCC 50 Nos. 2041 102050
49 Structural Work For Catwalks cross overs 20 Tonne 92000 1840000
TOTAL FOR EXECUTION OF MECHANICAL PIPING WORKS: 10966248
TOTAL AMOUNT INCLUDING 6% COMPOSITE SERVICE TAX 11624222.9
TOTAL FOR ALL ALLIED WORKS WITHOUT SERVICE TAX 22910860
TOTAL FOR ALL ALLIED WORK INCLUDING COMPOSITE TAX 24285512
Supply and Installation of GMS System for proposed 2 x 600 MT Mounded Storage Bullets including its
Integration with the existing system at Raipur LPG BP (CG)
FLP On/Off switch with FLP JB for FTU isolation No. 2 1,900 3,800
5 Supply of FLP Hooter and fittings No. 2 13,500 27,000
FLP Hooter with Intrinsically Safe Output and Auto Reset Timer facility suitable for
above FTUs.
6 FTU MOUNTING ACCESSORIES No. 2 2,250 4,500
FLP 4 Way junction boxes with gland
Job includes erection & installation of FLP/. WP enclosures for FTUs in Hazardous
Area.
7 New Microprocessor Based Intelligent Mimic Repeater Panel complete with No. 1 25,280 25,280
arrangement suitable for mounting in secuirity cabin and having -
Multicoured Plant Mimic & 3 LED indications for each detector
ACC, RES, TEST CONTROLS
Panel Buzzer
Master Indiactions
RS-485 Interface for Main Controller
8 Computer interface controller unit (CIU) suitable for communication with FTUS Set 1 63,200 63,200
and PC and to be installed in safe area and having -
Micro controller based operations
Suitable keyboard & LED display for programming & % LEL
RS-232 interface for PC
RS-232 interface for mimic repeater
Relay OP for external alarms
9 Supply and Fitting of Windows Based GMS Sofware customised to the specifice Set 1 52,500 52,500
requirements of LPG Plant and Compatible with software of main GMS controller
with provision for system programming and having following features
2 Erection & installation of FLP/weatherproof enclosures for field mounded FTUs No. 2 2,500 5,000
3 Digging trenches for cable lying and back filling, spreading extra soil, levelling etc. M 350 127 44,450
4 Laying of armored cable under ground in trenches or above ground in tray 3C x 1.5 M 1,500 81 121,500
sq.mm.
5 Fixing of GI tray 100 width M 80 146 11,680
6 Laying of GI pipes 50 mm dia. M 50 75 3,750
7 Testing & commissing of system including loop checking, cable testing, calibration etc. LS 1 25,000 25,000
FW
`B'
'
`Y
'
`Y
`X' `X'
`X' `X'
D1
TO DRAIN
Indian Oil
PROJECT
BY INITIALS WORK
DSGN
CHKD
APPD TITLE
SCALE
NUMBER REV SHEET
ALL DIMENSIONS IN MM
UNLESS MENTIONED OTHERWISE
LPG/ENG/STD/KERB WALL 0
Page 415 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
DRAWINGS, SOIL REPORT, DETAIL OF WORKS & ITEM RATES FOR THE
CONSTRUCTION OF MOUNDED VESSELS AT BUDGE BUDGE LPG BP
Note:
Drawings attached with the tender document are for reference purpose only. Tenderers are advised to
quote by rechecking the quantum of work.
Estimate for construction of 2 x 900 MT capacity Mounded Type Pressure Vessels at LPG
Bottling Plant Project Budge Budge
SL PART A - Fabrication, erection and testing of 2 x 900 MT Qty Unit Rate in Rs Amount in Rs
No. Mounded type pressure vessels for storage of LPG
Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (average depth 3 M on
1 account of Retaining Wall) including disposal of excavated earth 1,524 Cum 176.00 268,224.00
within and outside site to unobjectionable place, disposed earth to be
levelled and neatly dressed.
Mobilization and demobilization of all necessary plant, personnel,
equipment, tools and ancillaries, handling, assembling, erecting,
2 dismantling & removal off the site on completion of ground 1 LS 2,064,825.00 2,064,825.00
improvement works and soil investigation works.
Carry out pre-treatment & post tretment Soil Investigation Works
(Including Boreholes, electric Cone penetrometer tests (eCPT's) and
3 laboratory testing :
Supply of various sizes LPG Pipe line( 10" to 2") , Flanges, TEE,
Ebow, ROV, Gate Valve, Three Way Valves, EFCV, NRV, TSVs etc
as per site requirement for connecting the bullet to LPG pump house.
2 1 LS 14,059,950 14,059,950.00
Detail of item are given in tender document. Details of this item are
given & to be executed & measured seperately
ESTIMATE FOR ALLIED WORKS ASSOCIATED FOR FOR 2 x 900 MT MOUNDED TYPE PRESSURE
VESSELS FOR LPG STORAGE AT LPG BOTTLING PLANT, BUDGE BUDGE (WB)
TOTAL 1172058.00
C CONSTRUCTION OF CULVERT FOR CROSSING OF PIPING BED:
Total length of Culvert 7M Number of Culverts 2
Width of culvert 3M
Supply and Installation of GMS System for proposed 2 x 900 MT Mounded Storage Bullets including its
Integration with the existing system at Budge Budge LPG BP (WB)
FLP On/Off switch with FLP JB for FTU isolation No. 2 1,814 3,628
5 Supply of FLP Hooter and fittings No. 2 12,892 25,784
FLP Hooter with Intrinsically Safe Output and Auto Reset Timer facility suitable for
above FTUs.
6 FTU MOUNTING ACCESSORIES No. 2 2,148 4,296
FLP 4 Way junction boxes with gland
Job includes erection & installation of FLP/. WP enclosures for FTUs in Hazardous
Area.
7 New Microprocessor Based Intelligent Mimic Repeater Panel complete with No. 1 24,142 24,142
arrangement suitable for mounting in secuirity cabin and having -
Multicoured Plant Mimic & 3 LED indications for each detector
ACC, RES, TEST CONTROLS
Panel Buzzer
Master Indiactions
RS-485 Interface for Main Controller
8 Computer interface controller unit (CIU) suitable for communication with FTUS Set 1 60,356 60,356
and PC and to be installed in safe area and having -
Micro controller based operations
Suitable keyboard & LED display for programming & % LEL
RS-232 interface for PC
RS-232 interface for mimic repeater
Relay OP for external alarms
9 Supply and Fitting of Windows Based GMS Sofware customised to the specifice Set 1 50,137 50,137
requirements of LPG Plant and Compatible with software of main GMS controller
with provision for system programming and having following features
2 Erection & installation of FLP/weatherproof enclosures for field mounded FTUs No. 2 2,387 4,774
3 Digging trenches for cable lying and back filling, spreading extra soil, levelling etc. M 350 142 49,700
4 Laying of armored cable under ground in trenches or above ground in tray 3C x 1.5 M 1,500 92 138,000
sq.mm.
5 Fixing of GI tray 100 width M 80 165 13,200
6 Laying of GI pipes 50 mm dia. M 50 221 11,050
7 Testing & commissing of system including loop checking, cable testing, calibration etc. LS 1 23,875 23,875
PROPOSED CONSTRUCTION OF
BOTTLING PLANT AT BUDGE-BUDGE,
KOLKATA, WEST BENGAL
SUBMITTED TO
CONTENTS
1.INTRODUCTION: ...................................................................................................................................................................... 1
4.OBSERVATIONS AT SITE:....................................................................................................................................................... 2
5.FIELD INVESTIGATION:.......................................................................................................................................................... 3
7.WATER TABLE:....................................................................................................................................................................... 10
10.RECOMMENDATIONS: ........................................................................................................................................................ 13
APPENDICES
APPENDIX E: TABLE 1: COMPUTATION OF 300 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-01).................49
TABLE 2: COMPUTATION OF 300 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-02)...................50
TABLE 3: COMPUTATION OF 300 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-03)...................51
TABLE 4: COMPUTATION OF 300 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-04)..................52
TABLE 5: COMPUTATION OF 450 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-01).................53
TABLE 6: COMPUTATION OF 450 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-02).................54
TABLE 7: COMPUTATION OF 450 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-03)...................55
TABLE 8: COMPUTATION OF 450 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-04)..................56
TABLE 9: COMPUTATION OF 600 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-01)...................57
TABLE 10: COMPUTATION OF 600 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-02)...................58
TABLE 11: COMPUTATION OF 600 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-03)...................59
TABLE 12: COMPUTATION OF 600 Φ PILE LOAD CAPACITY FOR BORE HOLE (BH-04)..................60
ACKNOWLEDGEMENTS
We feel pleasure to submit the report of Sub soil investigation conducted at site for
We are thankful to Mr. Rajib Barai, Manager (LPG-Engg.) I/C, Indian Oil Corporation
Limited for the trust shown by awarding the work of Geotechnical investigation to us. We are
also grateful to Mr. Chaina, Site Engineer for the help and cooperation rendered during and
We are also thankful to our staff members for conducting field and laboratory test,
____________________________________________________________________________________________
Page 434 of 502
___
Branch Office: 103 Ratandham, 12/483 McRoberts Ganj, Kanpur-208001. TEL 0512-2525759
TENDER NO: HCC/LPG-02/PT-08/2017-18
1. INTRODUCTION:
This report deals with Geo-soil Investigation at the proposed site
for construction of foundation for Bottling plant at Budge-Budge, Kolkata, West Bengal.
The work has been awarded to us, wide Tender No. WBSO/LPGE/PT-18/15-16 Dated 03-
02-2016 from the Indian Oil Corporation Limited (MD), LPG Department, Kolkata. The
report includes the recommendations on type, depth and safe allowable bearing capacity for
the safe and strong foundation for the proposed structure. The work of project promotion
has been taken up by Indian Oil Corporation Limited (MD), LPG Department, Kolkata,
West Bengal.
2. SCOPE OF WORK:
For the proposed structures, it is required to determine the safe allowable bearing capacity
together with necessary engineering characteristics of underlying soil strata as per IS 2911
2.1 Mobilisation of all the drilling and testing equipments and testing personals to the
2.2 Boring four numbers of boreholes of 150 mm diameter within the proposed area of
construction.
2.3 Conducting the Standard Penetration Test (SPT) at every 1.50 metre interval or at
2.4 Collecting disturbed soil samples at every 1.50 metre interval or at change of strata
2.5 Conducting field density test and collecting Disturbed soil samples for conducting
CBR tests.
2.6 Collecting undisturbed soil samples from the boreholes at 2.50 metre interval or
change of strata.
2.7 Transporting all the disturbed and undisturbed soil samples collected during the field
2.8 Conducting Electric Resistivity Test at one location within the proposed site.
2.9 Conducting the laboratory test on all the soil samples collected during field
2.10 Compilation of field and laboratory test results, working out the safe allowable
bearing capacity and preparing the report including detailed recommendations and
necessary precautions.
3. PROJECT LOCATION:
The proposed site for construction of Bottling Plant is at
4. OBSERVATIONS AT SITE:
4.1 Effect of saltpetre and termites has not been observed at the site.
4.4 A Rain water drain is flowing 20 metre away from the site.
5. FIELD INVESTIGATION:
The field investigation work at this site was carried out
from February 23th; 2016 to March 02nd; 2016. The following investigation work was
done:
5.1. Four numbers of boreholes of diameter 150 mm were made within the proposed
layout of the plant structure. The boreholes were progressed using machinery
operated augers and further advanced by use of machinery operated shell casing to
the desired depth. Where caving of the borehole occurred, casing was used to keep
the borehole stable. All bore hole (marked as BH-1, BH-2, BH-3 & BH-4) was
made up to the depth of 30.00 metre. The locations of boreholes have been
5.2. Standard Penetration Tests were conducted at 1.50 metre as per the procedure
in IS 2131-1981 in all the bore holes. For conducting the test, the bottom of the
borehole was properly cleaned and split spoon sampler was properly seated in
position in the borehole. The split spoon sampler resting on the bottom of
borehole was allowed to sink under its own weight; then the sampler was allowed
to penetrate 15 cm with the blows of the hammer 63.50 kg weight falling free
through 75cm, thereafter the split spoon sampler was further driven by another 15
cm. For the 3rd and final drive, the sampler was further allowed to penetrate 15
The total blows of penetration for the second and third 15 cm of penetration is
soils.
In case the blows count of SPT in soil (including the number of blows of seating)
exceeds 100, the corresponding penetration was recorded and this particular test at
that depth stopped. If the total penetration is more than the seating penetration of
15 cm, then breakup of blows count for 15 cm seating penetration and for
SPT ‘N’ values are correlated with relative of non-cohesive stratum as per BS:
5930 (1999) - for sandy strata and with consistency of cohesive stratum.
In this method, the sampler acts as a probe and the driving energy is supplied by
the fall of the drop weight. The values of ‘N’ depend on the compactness or
‘N’ value depends upon degree of saturation and over burden pressure of the
formation. Silty fine sand and fine sand below the water table develop pore water
pressure depending on the in-situ void ratio which in turn affects the effective
stress. This change in effective stress influences the ‘N’ value considerably.
Terzaghi and peck have recommended a correction for ‘N’ values in case of
saturated silty and fine sand when the ‘N’ observed in the field is higher than 15.
Soil sample obtained from standard spoon sampler for all above standard
penetration tests were collected in the polythene bags of suitable size. These
samples were property seal, labelled, record and carefully transported to the
laboratory for testing. The results have been reported in Table 1 to 4 of Appendix
5.3. Disturbed soil samples were taken at every 1.50 metre interval and at significant
change of stratum. Soil from cutting edge of SPT samplers and retained in split
spoon sampler, used for Standard Penetration Tests was taken as disturbed
samples. These samples were placed without delay in adequately sealed polythene
bags. The laboratory test results have been reported in Table 1 to 4 of Appendix B
5.4. Undisturbed soil samples were tried to be collected in accordance with IS: 2132-
1986. Undisturbed soil samples (UDS) was obtained at every 3.00 metre interval.
Undisturbed samples were collected using 100mm dia. and 450mm long MS tubes
cobbles/ pebbles/ boulders, refusal strata is practically not possible and such
Immediately after taking and undisturbed sample in a tube, the adopter head was
removed along with the disturbed material. The visible ends of the samples shall
each be trimmed off any wet disturbed soil. The ends will then be coated
alternately with four layers of just molten wax. More molten wax will then be
added to give a total thickness of not less than 25mm. The laboratory test results
TEST RESULTS”.
5.5. The depth at which ground water is struck during boring was carefully noted and
the depth of water table was ascertained subsequently in the completed borehole
The water table in the borehole was allowed to stabilize after depressing
the water level adequately by bailing. Stability of the borehole sides and bottom
The borehole was filled with water and then bailed out to various depths.
Observations were made at each depth to see if the water level is rising or falling.
The depth at which neither a fall nor rise is observed reading of water level taken
5.6. Water samples has been collected from the bore holes (BH-1 & BH-4) on stable
water table. The results have been reported in Table7 “CHEMICAL TEST
5.7. Electrical Resistivity Tests (ERT) has been conducted as per IS: 3043-1987 at
one location. The location have been marked in Appendix-A. The results have
5.8. Four numbers of undisturbed soil samples have been collected using Shelby tubes
at the depth of 0.50 meter from the proposed locations of California Bearing Ratio
tests. The field density have been recorded and the disturbed soil samples have
been retained for testing in laboratory for CBR test in accordance with IS 2720
location plan.
6. LABORATORY TESTS:
The following laboratory tests were
conducted to determine the engineering characteristics of sub-soils:
6.1. Field moisture contents were determined by oven drying method as per IS 2720
(part II)-1973. The results have been reported in Table 1 to Table 4 “SUMMARY
6.2. Field density of soil strata were obtained using Shelby tubes in accordance with
IS 2720 (part XXIX)-1975. The results have been reported in Table 1 to Table 4:
6.3. Mechanical sieve analysis test were performed in accordance with IS 2720 (Part
IV) - 1985, for the purpose of identification by grain size analysis, on coarse part
of the soil samples and the results have been reported in Table 1 to Table 4
6.4. Particle size analysis test by hydrometer method were performed in accordance
with IS 2720 (Part IV) - 1965 on the part of soil samples obtained after the sieve
6.5. Atterbergs’ limits tests were performed in accordance with IS 2720 (part V)-
1985 and results have been reported in Table 1 to Table 4 “SUMMARY OF TEST
RESULTS” of Appendix B.
6.6. Specific gravity tests were performed in accordance with IS 2720 (part III-sec. 1)
-1980 and the results have been reported in Table 1 to Table 4 “SUMMARY OF
6.7. Direct shear tests were performed as per IS 2720 (part XI)-1971, on the
undisturbed soil samples obtained during the field investigation. Some of the tests
collected. The results and the density of samples have been reported in Table 1 to
6.8. Triaxial Compression Test for two different test conditions namely
performed as per IS 2720 (part X & XI)-1997, on the undisturbed soil samples
obtained during the field investigation. The results have been reported in Table 1
the undisturbed soil sample collected from the bore hole and results have been
6.10. Unconfined Compressive Strength tests were performed on the undisturbed soil
samples in accordance with IS 2720 (part 10)-1991 and results have been reported
6.11. California Bearing Ratio tests were performed on disturbed soil samples
collected from the field after remoulding in CBR moulds at field density and
CBR-1 to CBR-4 and results have been reported in Table 8 “CBR TEST
RESULTS” of Appendix B.
6.12. Consolidation tests were performed on cohesive soil samples in accordance with
IS: 2720 (part XV)-1997. The results have been reported Table 1 to Table 4:
7. WATER TABLE:
The water table at this site was encountered during the boring operation. The depth
of water table was measured as per IS 6935-1973. The depth of water table at this site
varies from 1.70 meter to 2.00 meter. The records of measurements of depth of water table
the help of soil characteristics obtained in laboratory tests as per IS 1498-1978. The
detailed nature of the soil strata have been reported in Table 1 to Table 4: “SUMMARY
Kolkatta is situated on the alluvial plains of southern Bengal, India formed by Ganga-
Brahmaputra river system. The soil formation in this region consists of a thin fibrous soft
and highly compressible peat layer at mean sea level followed by a soft and highly
compressible grey silty clay state. In general all boreholes have soil strata which are,
highly compressible soils consisting of organic clays with decayed woods till a depth of
9.00 metres, inorganic silts of low plasticity from 9.00 metre to 20.00 metres followed by
Kolkata falls under typically deltaic region. At this site, highly compressible soils
consisting of organic clays with decayed woods are found till a depth of 9.00 metres.
Organic soils which pose significant problems in design with its poor compressibility
the nature of soil, type of proposed structure, expected loads on foundation, calculations
have been made for pile foundation for the proposed structures.
as per IS 2911 (part-1, section -2)-2010. Load bearing capacities of RCC piles of
diameter 300 mm, 450 mm and 600 mm and length 12.00 m, 15.00 m and 18.00
meter has been adopted for calculations. The cut-off level has been considered as
Design Consideration:
Sr.
Parameter Value
No.
1 K (Coefficient of earth 1.00
pressure)
The detailed calculations of pile load carrying capacity in compression and uplift
10. RECOMMENDATIONS:
Keeping in mind, the field test results, laboratory test results and IS codes of
10.1 Kolkata falls under typically deltaic region. At this site, highly compressible
soils consisting of organic clays with decayed woods are found till a depth
of 9.00 metres. Since the compressible soils are liable to large settlement
10.2 Pile Foundation: RCC pile footings shall be provided for the foundation of
10.3 The recommended load capacities of piles given in the above table are a
guide only, final design load capacities shall be based on the pile load test
APPENDIX – A
PLAN-1-BORE HOLES & CBR LOCATION PLAN
21.10
CBR-03
CBR-04
12
.0 0
Bituminous Road
12.45
BH-03 Bitum inous Road
37
.5 3
ERT-01
7.37
4 0.
09
68.28
CBR-02
BH-02
Bituminous Road
B i t u m i n o u s R o a d
6 1.8 4
2.86
BH-01
Bituminous Road
34
.2
3
18.50 CBR-01
Nallah
Gate No.2
Gate Cylinder
Bituminous Road
Counting
Platform
Shed
Boundary Wall
Contractor's Rest Room 9.64 46.80
202.09
IOCL Petrol Pump
Febricator Shed
Guard
Room
Truck Parking Area
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
Clays of low
1.00 U 1 - - - - - CL 0 2 1 1 89 7 34.18 1.945 1.450 29 21 8 2.66 0 2 - - - 0.11 -
-
Plasticity
1.50 D 2 1 2 2 4 - - - - - - - - 26.36 - - - - - - - - - - - - - - -
3.00 D 4 1 1 1 2 - - - - - - - - 30.50 - - - - - - - - - - - - - - -
Clays of
4.50 D 5 1 1 1 2 - intermediate - - - - - - - 25.57 - - - - - - - - - - - - - - -
plasticity with
5.00 U 6 - - - - - appreciable amount CI 2 11 6 3 23 55 28.30 1.841 1.435 43 23 20 2.68 - - 0 0 0 1 - - -
of compressible
6.00 D 7 1 1 1 2 - material - - - - - - - 38.34 - - 41 22 19 - - - - - - - - - -
7.50 D 8 1 1 2 3 - - - - - - - - 30.28 - - - - - - - - - - - - - - -
9.00 D 10 3 3 6 9 - CL 2 1 2 2 72 21 37.79 - - 46 26 20 - - - - - - - - - -
10.50 D 11 3 4 8 12 - - - - - - - - 31.27 - - 47 22 25 - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 450 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
12.00 D 13 3 5 8 13 - CL 0 1 2 2 80 15 26.62 1.937 1.53 45 25 20 2.66 - - 32 33 34 16 - - -
13.50 D 14 4 6 9 15 - - - - - - - - 25.22 - - - - - - - - - - - - - - -
16.50 D 17 7 9 11 20 - - - - - - - - 30.53 - - 45 27 18 - - - 38 39 40 20 - - -
19.50 D 20 6 10 13 23 - - - - - - - - 24.61 - - 30 23 7 - - - - - - - - - -
22.50 D 23 8 13 15 28 - - - - - - - - 30.55 - - - - - - - - - - - - - - -
Silty Sands
24.00 D 25 9 10 16 26 - SM 2 3 2 62 31 0 27.80 - - Non-Plastic - - - - - - - - - -
25.50 D 26 14 16 23 39 - - - - - - - - 25.65 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 451 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
27.00 D 28 12 18 24 42 - ML 0 0 0 44 56 0 29.24 - - Non-Plastic - - - - - - - - - -
Inorganic Silts of Low
28.50 D 29 12 24 27 51 - Plasticity - - - - - - - 23.93 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 452 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
APPENDIX ‘B’
TABLE 02 : SUMMARY OF TEST RESULTS
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
Clays of low
1.00 U 1 - - - - - CL 0 1 1 0 96 2 14.46 2.013 1.758 30 22 8 2.66 0 3 - - - 0.12 -
-
Plasticity
1.50 D 2 2 2 3 5 - - - - - - - - 24.96 - - - - - - - - - - - - - - -
3.00 D 4 1 2 2 4 - - - - - - - - 37.31 - - - - - - - - - - - - - - -
Clays of intermediate
4.50 D 5 0 1 1 2 - plasticity with - - - - - - - 34.85 - - - - - - - - - - - - - - -
appreciable amount of
6.00 D 7 0 0 1 1 - compressible material CI 0 0 0 3 40 57 25.39 1.888 1.505 42 23 19 2.68 - - 0 0 0 1 - - -
7.50 D 8 0 1 1 2 - - - - - - - - 24.29 - - 44 24 20 - - - - - - - - - -
9.00 D 10 0 1 1 2 - CL 0 1 3 2 69 25 30.97 - - 47 25 22 - - - - - - - - - -
Inorganic clay of low
compressibility
10.50 D 11 3 3 4 7 - - - - - - - - 31.66 - - 45 24 21 - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 453 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
APPENDIX ‘B’
TABLE 02 : SUMMARY OF TEST RESULTS
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
11.00 U 12 - - - - - CL 0 0 1 2 92 5 35.14 2.08 1.54 30 21 9 2.65 - - 29 30 31 14 - - -
12.00 D 13 3 4 5 9 - - - - - - - - 33.18 - - - - - - - - - - - - - - -
13.50 D 14 3 4 4 8 - - - - - - - - 30.79 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 454 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
APPENDIX ‘B’
TABLE 02 : SUMMARY OF TEST RESULTS
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
25.50 D 26 16 19 30 49 - - - - - - - - 21.90 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 455 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
Clays of low
1.00 U 1 - - - - - CL 0 0 0 1 97 2 24.97 2.106 1.685 28 21 7 2.65 0 2 - - - 0.12 -
-
Plasticity
1.50 D 2 1 1 2 3 - - - - - - - - 33.86 - - - - - - - - - - - - - - -
9.00 D 10 1 2 2 4 - CL 0 2 4 2 71 21 30.06 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 456 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
12.00 D 13 5 6 8 14 - - - - - - - - 31.75 - - - - - - - - - - - - - - -
13.50 D 14 5 7 9 16 - - - - - - - - 31.77 - - 45 29 16 - - - - - - - - - -
Inorganic clay of low
15.00 D 16 2 3 8 11 - compressibility CL 0 0 2 2 91 5 30.33 2.046 1.57 47 29 18 2.65 30 30 32 15
16.50 D 17 6 7 12 19 - - - - - - - - 35.62 - - - - - - - - - - - - - - -
19.50 D 20 18 22 26 48 - - - - - - - - 27.27 - - - - - - - - - - - - - - -
22.50 D 23 16 25 29 54 - - - - - - - - 22.80 - - - - - - - - - - - - - - -
Silty Sands
24.00 D 25 17 26 31 57 - SM 0 5 12 61 22 0 21.65 - - Non-Plastic - - - - - - - - - -
25.50 D 26 15 23 28 51 - - - - - - - - 21.94 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 457 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
Inorganic Silts of Low
28.50 D 29 16 23 26 49 - - - - - - - - 19.19 - - - - - - - - - - - - - - -
Plasticity
30.00 D 31 17 24 27 51 - ML 0 1 2 39 58 0 17.43 - - Non-Plastic - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 458 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
Clays of low
1.00 U 1 - - - - - CL 0 0 1 1 97 1 36.67 1.987 1.453 27 19 8 2.68 0 2 0.10
Plasticity
1.50 D 2 1 2 2 4 - - - - - - - - 31.63 - - - - - - - - - - - - - - -
7.50 D 8 0 1 1 2 - - - - - - - - 33.71 - - 41 20 21 - - - - - - - - - -
10.50 D 11 1 2 2 4 - - - - - - - - 38.23 - - - - - - - - - - - - - - -
Inorganic clay of low
12.00 D 13 1 2 4 6 - compressibility CL 0 1 3 3 92 1 31.53 2.052 1.560 45 25 20 2.67 - - 26 27 27 11 - - -
13.50 D 14 2 2 5 7 - - - - - - - - 36.69 - - - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 459 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Description of soil
DST UU UC CU
Depth Below NGL (Meter)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Cohesion C ( kN/m2)
Void Ratio,
Dry Density (gm/cc)
Specific Gravity Gs
N1 (Seating Drive)
N3 (Second Drive)
Angle of Friction
Angle of Friction
Cc
N2 (First Drive)
(Degree) Φ
(Degree) Φ
N (N2+N3)
Gravel (%)
Mapping
Clay (%)
Silt (%)
15.00 D 16 2 3 6 9 - CL 0 0 2 2 92 4 29.88 2.065 1.59 44 26 18 2.67 27 27 29 11
19.50 D 20 5 8 13 21 - - - - - - - - 18.93 - - - - - - - - - - - - - - -
22.50 D 23 11 14 15 29 - - - - - - - - 20.14 - - - - - - - - - - - - -
Silty Sands
24.00 D 25 10 12 16 28 - SM 0 0 3 52 35 0 19.79 - - Non-Plastic - - - - - - - -
25.50 D 26 12 15 18 33 - - - - - - - - 19.81 - - - - - - - - - - - - -
TECHPRO
ENGINEERS PVT. LTD.
Page 460 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
27 1591-R0-Bottling Plant, Kolkata
APPENDIX-B
TABLE-5: ELECTRICAL RESISTIVITY TESTS
1. Test Procedure
Electrical resistivity of the soil at the site was determined at the location specified by the
client. The earth resistivity test is used for shallow subsurface exploration by means of
electrical measures made at the ground surface. Resistivity measurements are made by driving
four electrodes about 10 to 15 cm into the ground at pre-selected electrode spacing. Wenner
The four electrodes were spaced at equal distance along different locations. The
average of the resistivity values for each direction was taken as the mean resistivity for that
spacing. The test procedure is in accordance with IS: 3043:1987. The test results are
presented graphically in this report. Conin Electronic Digital Earth Resistance Tester was
Measurements are made by causing a current ‘I’ to pass through the earth and distribute
within a relatively large hemispherical earth mass. The portion of the current that flows along
The resistance ‘R’ is the ratio of voltage drop ‘V’ to current ‘I’ and is directly measured by
digital earth resistance tester. The resistivity is determined from the following equation -
ρ= 2 πaR
where :
R=Resistance (ohms)
TECHPRO
ENGINEERS PVT. LTD.
Page 461 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
28 1591-R0-Bottling Plant, Kolkata
2. Interpretation of tests
Forty Electrical resistivity tests were conducted at the site as per IS: 3043-1987. The tests
were conducted using the Wenner configuration along different directions at various electrode
The average apparent resistivity values are presented graphically and also tabulated. The test
TECHPRO
ENGINEERS PVT. LTD.
Page 462 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
29 1591-R0-Bottling Plant, Kolkata
1000.00
100.00
Resisitivity, ohm-m
10.00
1.00
0 2 4 6 8 10 12
Electrode Spacing, m
TECHPRO
ENGINEERS PVT. LTD.
Page 463 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
30 1591-R0-Bottling Plant, Kolkata
APPENDIX ‘B’
TABLE-6: LAB PERMEABILITY TEST RESULTS
Calculations:
k= 2.303 x a x L log10(h1/h2)/ (A x t )
TECHPRO
ENGINEERS PVT. LTD.
Page 464 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
31 1591-R0-Bottling Plant, Kolkata
APPENDIX-B
TABLE-7 : CHEMICAL TEST RESULTS ON WATER SAMPLES
Bore Depth of Salt (mg/litre)
No. Sample H
p
(m) Sulphates Chlorides Hardness Iron
TECHPRO
ENGINEERS PVT. LTD.
Page 465 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
Appendix B
California Bearing Ratio test
TABLE 8: SUMMARY OF TEST RESULTS
Field moisture
Sample Type
Content (%)
CBR Value
CBR NO
(gm/cc)
Fine Sand (%)
Medium Sand
Plastic Index
Liquid Limit
Plastic Limit
Course Sand
Content (%)
Dry Density
Gravel (%)
Location
Maximum
Optimum
Clay (%)
moisture
(gm/ cc)
Silt (%)
(%)
(%)
(%)
(%)
(%)
Soaked 4.22
1 Near BH 1 6.19 ML 0 0 0 2 95 3 24.32 1.725 14.16 1.680 34 27 7
Unsoaked
Soaked 2.97
Inorgani
2 Near BH 4 4.71 ML 0 1 4 9 84 2 25.64 1.720 21.40 1.579 32 26 6
Unsoaked c Silts of
Low
Soaked 4.10 Plasticit
3 Near BH 2 6.08 y ML 0 0 0 1 96 3 25.78 1.619 17.74 1.618 33 26 7
Unsoaked
Soaked 4.35
4 Near BH4 ML 0 1 3 6 88 2 25.71 1.695 19.80 1.572 31 25 6
Unsoaked 6.22
TECHPRO
ENGINEERS PVT. LTD.
APPENDIX-C
CHART-1: FIELD BORE LOG CHART (BH-01)
TECHPRO
ENGINEERS PVT. LTD.
Page 467 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
34 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-2: FIELD BORE LOG CHART (BH-01)
TECHPRO
ENGINEERS PVT. LTD.
Page 468 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
35 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-3: FIELD BORE LOG CHART (BH-02)
TECHPRO
ENGINEERS PVT. LTD.
Page 469 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
36 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-4: FIELD BORE LOG CHART (BH-02)
TECHPRO
ENGINEERS PVT. LTD.
Page 470 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
37 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-5: FIELD BORE LOG CHART (BH-03)
TECHPRO
ENGINEERS PVT. LTD.
Page 471 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
38 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-6: FIELD BORE LOG CHART (BH-03)
TECHPRO
ENGINEERS PVT. LTD.
Page 472 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
39 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-7: FIELD BORE LOG CHART (BH-04)
TECHPRO
ENGINEERS PVT. LTD.
Page 473 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
40 1591-R0-Bottling Plant, Kolkata
APPENDIX-C
CHART-8: FIELD BORE LOG CHART (BH-04)
TECHPRO
ENGINEERS PVT. LTD.
Page 474 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
41 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-1: PARTICLE GRADATION CURVE (BH-01)
100.0
1.50 Metre
90.0
2.50 Metre
80.0
5.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
100.0
8.00 Metre
90.0
11.00 Metre
80.0
14.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 475 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
42 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-2: PARTICLE GRADATION CURVE (BH-01)
100.0
17.00 Metre
90.0
20.00 Metre
80.0
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 476 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
43 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-3: PARTICLE GRADATION CURVE (BH-02)
100.0
1.50 Metre
90.0
2.50 Metre
80.0
5.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
100.0
8.00 Metre
90.0
11.00 Metre
80.0
14.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 477 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
44 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-4: PARTICLE GRADATION CURVE (BH-02)
100.0
17.00 Metre
90.0
20.00 Metre
80.0
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 478 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
45 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-5: PARTICLE GRADATION CURVE (BH-03)
100.0
1.50 Metre
90.0
2.50 Metre
80.0
5.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
100.0
8.00 Metre
90.0
11.00 Metre
80.0
14.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 479 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
46 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-6: PARTICLE GRADATION CURVE (BH-03)
100.0
90.0
17.00 Metre
80.0
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 480 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
47 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-7: PARTICLE GRADATION CURVE (BH-04)
100.0
1.50 Metre
90.0
2.50 Metre
80.0
5.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
100.0
8.00 Metre
90.0
11.00 Metre
80.0
14.00 Metre
70.0
Percentage Finer
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 481 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
48 1591-R0-Bottling Plant, Kolkata
APPENDIX-D
GRAPH-8: PARTICLE GRADATION CURVE (BH-04)
100.0
90.0
80.0
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.001 0.010 0.100 1.000 10.000
Gravel : Particle Size >4.75 mm Fine Sand: 0.075mm< Particle Size ≤0.425 mm
Coarse Sand : 2.00mm< Particle Size ≤4.75 mm Silt : 0.002mm< Particle Size ≤0.075 mm
Medium Sand : 0.425mm< Particle Size ≤2.00 mm Clay : <0.002 mm
TECHPRO
ENGINEERS PVT. LTD.
Page 482 of 502
TENDER NO: HCC/LPG-02/PT-08/2017-18
ERROR: syntaxerror
OFFENDING COMMAND: %ztokenexec_continue
STACK:
-filestream-
TO DRAIN
Indian Oil
PROJECT
BY INITIALS WORK
DSGN
CHKD
APPD TITLE
SCALE
NUMBER REV SHEET
ALL DIMENSIONS IN MM
UNLESS MENTIONED OTHERWISE
LPG/ENG/STD/KERB WALL 0