Professional Documents
Culture Documents
Assignment 2 WW
Assignment 2 WW
Assignment 2 WW
1. Determine 𝐾2
Trickling filter depth = 6.1 m
𝐷1 0.5 𝑆1 0.5
𝐾2 = 𝐾1 ( ) ( )
𝐷2 𝑆2
6.1 0.5 150 0.5
𝐾2 = 0.210 ( ) ( )
6.1 140
𝐾2 = 0.217 (𝐿/𝑠)0.5 /𝑚2
𝐾𝑇 = 𝐾20 (1.035)𝑇−20
𝐾12 = 0.217(1.035)12−20
𝐾12 = 0.165(𝐿/𝑠)0.5 /𝑚2
𝑄𝑃 = (1 + 𝑅)𝑄
𝑚3
𝑄𝑃 = (1 + 0.5) (22700 ) = 34050 𝑚3 /𝑑
𝑑
Pumping energy =
1.58 𝑘𝑊
(34050 𝑚3 /𝑑) = 53.8 𝑘𝑊
𝑚3
(1000 )
𝑑
𝑘𝑊ℎ/𝑑 = (24ℎ/𝑑)(53.8𝑘𝑊) = 1291.2 𝑘𝑊ℎ/𝑑
𝑘𝑊ℎ 𝑘𝑊ℎ 30𝑑
= (1,291.2 )( ) = 38736 𝑘𝑊ℎ/𝑚𝑜
𝑚𝑜 𝑑 𝑚𝑜
From information above, 4m side water depth clarifier with an overflow rate at average
flow of 1.1 m/h (𝑚3 /𝑚2 .h)
𝐶𝑙𝑎𝑟𝑖𝑓𝑖𝑒𝑟 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑎𝑟𝑒𝑎, 𝐴 = 𝑄/𝑂𝑅 = (22700 𝑚3 /𝑑) (1 𝑑/24 ℎ) / 1.1 𝑚3 /𝑚2 . ℎ
𝐴 = 860 𝑚2
4𝐴 4(430)
𝐷 = √ =√ = 23.4 𝑚
𝜋 𝜋
Assumption
𝑄 = 5𝑚3 /𝑑
3000𝑚𝑔 3000𝑔
𝑋𝑅 = =
𝐿 𝑚3
3𝑚3
𝑄𝑊 =
𝑑
𝑚𝑔
𝑋𝑒 = 36 = 36𝑔/𝑚3
𝐿
𝑃𝑋,𝑇𝑆𝑆 = 𝑄𝑒 (𝑋𝑒 ) + 𝑄𝑤 𝑋𝑅
𝑄𝑒 = 𝑄 − 𝑄𝑤
𝑚3
𝑉=5 × 1 𝑑 = 5 𝑚3
𝑑
𝑔
(1600 ) × 5𝑚3
𝑆𝑅𝑇 = ( 𝑚3 ) = 0.9 𝑑
9072 𝑔/𝑑
𝑚3 𝑔
𝐹 (5 )(720 3 ) 0.56𝑔 𝐵𝑂𝐷
𝑑 𝑚
= =
𝑀 (1600 𝑔 ) (0.8)(5 𝑚3 ) 𝑔 𝑀𝐿𝑉𝑆𝑆. 𝑑
𝑚3
c) Determine the volumetric loading rate (in kg BOD/ m3.d)
𝑄𝑆0
𝐿𝑜𝑟𝑔 =
103 𝑔
𝑉( )
𝑘𝑔
𝑚3 𝑔
(5 )(720 3 ) 𝑘𝑔𝐵𝑂𝐷
𝑑 𝑚
𝐿𝑜𝑟𝑔 = 3 = 0.72 3
10 𝑔 𝑚 .𝑑
(5𝑚3 )( )
𝑘𝑔
BOD basis:
𝑚3 𝑔
𝑔 (5
) 𝑌(720 3 )
𝑑 𝑚
(0.8) (9072 ) =
𝑑 1 + [0.1 × 0.9]
𝑌 = 2.19 𝑔 𝑉𝑆𝑆/𝑔𝐵𝑂𝐷
e) Determine the sludge age (in d)
𝑚𝑔 𝑙𝑏
𝑀𝐿𝑆𝑆 ( 𝐿 ) 𝑥 𝑣𝑜𝑙𝑢𝑚𝑒 (𝑀𝐺) 𝑥 8.34
𝑔𝑎𝑙
𝑆𝑙𝑢𝑑𝑔𝑒 𝑎𝑔𝑒, 𝑑 =
𝑚𝑔 𝑙𝑏
𝑄𝑖𝑛𝑓 (𝑀𝐺𝐷) 𝑥 𝑇𝑆𝑆𝑖𝑛𝑓 ( 𝐿 ) 𝑥 8.34
𝑔𝑎𝑙
5 𝑚3 1 𝑀𝐺
𝑄𝑖𝑛𝑓 = 𝑄 = 𝑥 = 1.321𝑥103 𝑀𝐺𝐷
𝑑𝑎𝑦 3.785 𝑥 103 𝑚3
1 𝑀𝐺
𝑉 = 5 𝑚3 𝑥 = 1.321𝑥103 𝑀𝐺
3.785 𝑥 103 𝑚3
𝑚𝑔 𝑙𝑏
(1600 ) 𝑥 (1.321𝑥103 𝑀𝐺) 𝑥 8.34
𝐿 𝑔𝑎𝑙
𝑆𝑙𝑢𝑑𝑔𝑒 𝑎𝑔𝑒, 𝑑 =
𝑚𝑔 𝑙𝑏
(1.321𝑥103 𝑀𝐺𝐷) 𝑥 (168
𝐿 ) 𝑥 8.34 𝑔𝑎𝑙
17.627 𝑀𝐺
𝑆𝑙𝑢𝑑𝑔𝑒 𝑎𝑔𝑒, 𝑑 =
1.851 𝑀𝐺𝐷
𝑄𝑆𝑂
𝐹 ⁄𝑀 =
𝑋𝑉
𝑔
𝑔. 𝐵𝑂𝐷 5 𝑚3 ⁄𝑑 𝑥 720 3
0.56 = 𝑚
𝑔 𝑀𝐿𝑉𝑆𝑆. 𝑑 (1600 𝑔 ) (0.8) 𝑉
𝑚3
𝑉 = 5 𝑚3
Assuming average overflow rate based on textbook Wastewater Engineering Treatment and
Resource Recovery, Fifth Edition (T.L) Table 5-19;
Overflow rate, Vo = 28 m3/m2.d
Detention time = 2.0 hours
(Source:(Ong, 2007))
5 𝑚3
𝑄 𝑑𝑎𝑦
𝐴= = = 0.1786 𝑚2
𝑉𝑜 𝑚3
28 2 . 𝑑
𝑚
4 4
𝐷=√ 𝐴=√ (0.1786 𝑚2 ) = 0.4769 𝑚
𝜋 3.1416
𝑉 𝐴𝐷𝑑
𝑡𝑅 = =
𝑄 𝑄
𝑡𝑅 𝑄
𝐷𝑑 =
𝐴
1 𝑑𝑎𝑦 5𝑚3
2 ℎ𝑟 𝑥 ( )𝑥
24 ℎ𝑟 𝑑𝑎𝑦
𝐷𝑑 =
0.1786 𝑚2
𝐷𝑑 = 2.333 𝑚
Weir length:
Assume the aeration tank is conventional activated sludge (CAS) since the value of MLVSS
given is in the range of 1200 to 2400 mg/L based on DOE.
a) SVI, mg/L
𝑚𝐿 3 𝑚𝑔
𝑚𝑔 (𝑠𝑒𝑡𝑡𝑙𝑒𝑑 𝑣𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑠𝑙𝑢𝑑𝑔𝑒, 𝐿 )(10 𝑙 𝑔)
𝑆𝑉𝐼, = 𝑚𝑔
𝐿 (𝑠𝑢𝑠𝑝𝑒𝑛𝑑𝑒𝑑 𝑠𝑜𝑙𝑖𝑑𝑠, )
𝐿
𝑚𝑔 97 × 1000
𝑆𝑉𝐼, =
𝐿 1600
𝑚𝑔
𝑆𝑉𝐼, = 60.625 𝑚𝑔/𝐿
𝐿
c) F/M ratio
Where;
Q = 5 m3/d
So = influent BOD, 720 mg/L
V = aeration tank volume
Xv = MLVSS
𝐹 𝐵𝑂𝐷𝑖𝑛 (𝑄)/1,000
=
𝑀 𝑉𝑟 (𝑋𝑉 )
𝐹 5 × 720
=
𝑀 8.016 × 1280
𝐹
= 0.35
𝑀
d) Aeration tank volume (m3)
𝑌𝜃𝐶 𝑄(𝑆𝑂 − 𝑆)
𝑉=
𝑋𝑉 (1 + 𝑘𝑑 𝑓𝑏 𝜃𝐶 )
𝑓𝑏′
𝑓𝑏 =
[1 + (1 − 𝑓𝑏′ )𝑘𝑑 𝜃𝐶 ]
0.8
𝑓𝑏 =
[1 + (1 − 0.8)(0.15)(5.95)]
𝑓𝑏 = 0.68
𝑌𝜃𝐶 𝑄(𝑆𝑂 − 𝑆)
𝑉=
𝑋𝑉 (1 + 𝑘𝑑 𝑓𝑏 𝜃𝐶 )
(0.4)(5.95)(10)(720 − 27.92)
𝑉=
(1280)(1 + (0.15 × 0.68 × 5.95)
𝑉 = 8.016
g) Freeboard area, m
= 0.46 m