Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Important Notes:

• Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This
document may not, in whole or in part, be reproduced, stored, transmitted or
distributed in any form or by any means, whether electronic, mechanical, by
photocopy, recording or otherwise, without the prior written permission of EX20.
Except where otherwise expressly agreed in writing by EX20, EX20 shall have
no responsibility or liability for any loss (direct, consequential or otherwise)
which may arise from reliance on or use of this document or the information
contained therein.
• Where dimensions are not given, drawings must not be scaled and the matter
should be referred back to John R Harris & Partner's.
• This drawing should be read in conjunction with all other project information,
produced by John R Harris & Partner's and others. In the event of any conflict
between the information contained on this drawing and in any other project
document, drawings, specifications, schedules etc. the matter must be referred
1 2 3 4 5 6 7 8 9 10 100 110 120 130 140 150 160 back to John R Harris & Partner's for clarification.
• All dimensions and conditions are to be checked on site by the contractor prior
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 to preparing designs, shop drawings, calculations etc. or commencing any
work.
UP UP • The contractor is responsible for checking that there is no conflict between site
dimensions and drawn dimensions.
• This drawing’s should be read in conjunction with other relevant architectural,
interior design, structural, fire safety, mechanical and electrical drawings and all
relevant sections of the project specifications.
UP • The contractor shall submit full shop / setting out drawing for approval (based
on site dimensions) prior to commencement of any site works, placing of
A orders, manufacture of fittings, fixtures and components.
• Approved drawings from consultants do not relief the contractors from his
contractual obligations or that of adhering to requirements in accordance with
latest edition of Fire and Life Safety Code of practice and the International
Codes & Standards referred to within where applicable.
5000

• Safety, Health and Environment Information: brief details on the identified


hazard symbol referencing the unusual residual hazards / risks are listed
above.
UP
DO NOT SCALE THIS DRAWING.
B

PART-2 PART-3
5000

C
N

Makka
h
5000

UP

General Notes
D
5000

E
5000

UP

F UP UP
5000

G
5000

No Description
H SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
hazards / risks are listed above.

PART-1
5000

I 1 ISSUED FOR CONSTRUCTION AB AB 23/01/2020


0 DETAIL DESIGN SUBMISSION AB AB 08/01/2020
Rev Description Apvr Chk'd Date
Client
5000

J
Programme / Programme Management Consultant
5000

Architectural Consultant
K
5000

Project Title

USA PAVILION EXPO 2020


L
Enter address here
Drawing Title

OVERALL GROUND FLOOR PLAN

OVERALL GROUND FLOOR PLAN


- 1 : 150
NOTE:-FOR TRAVELLATOR LAYOUT REFER
TO ARCH. LAYOUT & SPECIALIST DETAILS.
Approved Seal Date

AB
Designed Drawn Checked

IA AB
Model File Ref: Scale A1(594x841) Revision No
10101-MDL-S605282-AR-900001 1 : 150 1
Drawing No

6324-USA-ST-DG-ST-104

You might also like