Engineer : Mohammed Mohieb W

Sl No Activity Description 'Scheme no'' ND-11-20-78


MARKHANIA

1 Scheme received date

2 Site Survey & Report submission

3 Shop drawing / Proposal drawing

4 Removing the tiles

5 Trench Excavation 100%

6 LV Cable installation (4Cx240…………….16)

7 Equipment installation

8 Backfilling
50%

9 Interlock reinstatement

10 Cable length as per the Scheme

11 Cable length as per the Site

12 Asset tagging for the equipment

13 recovery cable + Equipment

14 Current Status / Reason for Hold/ Remarks COMPLETED

15 Planned Manpower to complete the work*

16 Consumed Manpower to complete the work

Labour at site (tomorrow)


17

Color Code Status Description


Completed
Not Required/ Not Applicable
Required / Pending for submission
Submitted
Obstruction
Work Flow & Work Status
ND-11-20-145 ND-415-219 DIV-11-20-91 OHL-11-20-209 AL OHL-11-20-237 Al
Saad Al Yahar MUTHARTH RAWDA Saad

100% 100% 100% 100% 100%

Diversion

4cx240 -580 mtr,


4cx240 -15 mtr 4cx240 -7 MTR 4cx240- 30 Mtr
4cx150-12 mtr
15
4cx240 -574 mtr,
4cx240 -15 mtr 4cx240 -10 MTR 4cx240-50 Mtr
4cx150-12 mtr
8

COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED


OHL-11-20-179 OHL-11-20-201 PTS-LV-39415-20 PTS-LV-39150-20 Al
ND-415-20-246 Zakher
Remah Remah Remah Mutharth

100% 100% 100% 100% 100%

4cx120- 55 Mtr 4cx120- 10 Mtr


4cx120-27 mtr 4cx240- 55 Mtr 4cx120- 30 Mtr
4cx240-300 Mtr 4cx16-25 Mtr

4cx120- 46 Mtr 4cx120- 7 Mtr


4cx120-27 mtr 4cx240- 50 Mtr 4cx120- 24 Mtr
4cx240-267 Mtr 4cx16-17.5 Mtr

COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED


PTS-LV-37908-20 PTS-LV-38872-20 DIV-415-20-108 PTS-LV-38713-20 center of
Zakher neima maqam Al Ain

tiles lifting ,ndrc , bike truck r

100% 100% 100%

4cx185-3 mtr 4cx120- 10 Mtr 4cx16-225 Mtr


4cx120- 35 Mtr 4cx120- 50 Mtr
4cx120-6 mtr

4cx185-3 mtr
4cx120- 32 Mtr 4cx120- 43 Mtr
4cx120-8 mtr

tiles lifting ,ndrc , bike truck


COMPLETED COMPLETED COMPLETED
removal permit required
PTS-LV-38589-20 DIV-415- 20-99
DIV-415-20-82 zakher PTS-LV-38796-20 center of Al Ain
center of Al Ain Mreijeb

proposal sent . Awating for approval from


.NDRC&interlock tiles permit is required aadc

100% 100%

pending . Mail sent

4cx16-200 Mtr 4cx16-400 Mtr 4cx240-13 Mtr

4cx70-22 mtr 4cx240-13.5 +26 Mtr.

.NDRC&interlock tiles proposal sent . Awating for approval from


COMPLETED COMPLETED
permit is required aadc
PTS-LV-38452-20 PTS-LV-37990-20 PTS-LV-39229-20 Al
ND-415-20-235 Salamat
towayya Sanaya Mutared

tiles lifting ,ndrc , bike truck removal permit required

100% 100% 100%

4cx240r-650 Mtr
4cx16-90 Mtr 4cx185-80 Mtr 4cx16 -120 Mtr
4cx150-135 Mtr

4cx240r-714 Mtr
4cx185-83Mtr 4cx16-115 mtr
4cx150-137 Mtr

tiles lifting ,ndrc , bike truck


COMPLETED COMPLETED COMPLETED
removal permit required
PTS-LV-39772-20 PTS-LV-39545-20 AIN
DIV-415-20-94 Muajei PTS-LV-38747-20 Yahar
Al Swihan FAIDA

100% 100% 100% 100%

4cx25-15 Mtr 4cx240-15 mtr 4cx25-200 mtr

4cx25-15 Mtr 4cx240-17 mtr 4cx25-195 mtr 4cx50-227 mtr

COMPLETED COMPLETED COMPLETED COMPLETED


PTS-LV-39658-20 AIN PTS-LV-38355-20 PTS-LV-38667-20 PTS-LV-38726-20
FAIDA SALAMAT ASHAREJ MARKHANIYA

INTERLOCK, GREEN AREA INTERLOCK PERMIT NDRC PE

100% 100%

4cx120-115 mtr

4cx50-177 mtr 4cx120-108 mtr

INTERLOCK PERMIT NDRC


COMPLETED COMPLETED INTERLOCK, GREEN AREA PERMIT , BUS STATION NOT
CONSTRUCTED
PTS-LV-38669-20
PTS-LV-38797-20 AL KHABISI PTS-LV-38579-20 CITY CENTER
ASHAREJ

INTERLOCK PERMIT
INTERLOCK PERMIT NDRC PERMIT INTERLOCK PERMIT NDRC PERMIT ,

15% is done 100%

4cx16-133 mtr

4cx16-137 mtr

INTERLOCK PERMIT NDRC PERMIT ,


BUS STATION NOT CONSTRUCTED
INTERLOCK PERMIT COMPLETED
PTS-LV-35637-18 PTS-LV-39972-21 PTS-LV-40392-21
ND-415-20-192 ASHAREJ
MALEHA BIDA AL SAMAH MUTARED

INTERLOCK PERMIT NDRC,Tiles

100% 100%

4cx120 95 mtr 4cx25-15 mtr

4cx120-103 4cx25-15 mtr

COMPLETED NOT STARTED.TILES COMPLETED NDRC,Tiles


PTS-LV-39573-20 PTS-LV-340582-21 ND-415-21-63 ND-415-21-24 ND-415-21-93
MUTARED Ain Faida Salamat Salamat Maqam

NDRC,Tiles NDRC,Tiles NDRC,Tiles NDRC,Tiles NDRC,Tiles


90%

85%

4cx185 Al=45 mtr


4CX240 -276 mtr

4cx185 Al=39 mtr


4cx240-264 mtr

NDRC,Tiles NDRC,Tiles NDRC,Tiles NDRC,Tiles NDRC,Tiles

8 12
PTS-LV-39594-20 PTS-LV-39022-20 DIV-415-21-14 DIV-415-21-45 ND-415-21-12
Zakher Swihan Muajei Bateen Markhanya

done by noor NDRC,Tiles

60% IS done 100% 85% IS DONE

4cx120 cu-13 mtr

4cx120 cu-13 mtr

MAIL RECEIVED
NOT STARTED. TILES done by noor FROM AADC COMPLETED NDRC,Tiles

13

6
PTS-LV-40073-21 PTS-LV-40629-21 PTS-LV-40394-21
ND-415-21-85 yahar
Markhanya Khazna zakher

100% 100% 100%

4cx240-230 mtr
4cx150-77 mtr 4cx185-370 mtr 4cx185 Al-10 mtr

4cx240-226 mtr
4cx150-73 mtr 4cx185-373 mtr 4cx185 Al-9 mtr

COMPLETED COMPLETED STILL NOT STARTED. COMPLETED


PTS-LV-40524-21 Al PTS-LV-38587-20 ND-415-20-279 ND-415-20-118 Al ND-415-20-59 Al
Saad zakher Salamat Yahar Aqabiya

ndrc ,tiles

100% 100% 10%

4cx185 Al-226 mtr 4cx240-53 mtr

4cx185 Al-218 mtr 4cx240-56 mtr

PENDING .
COMPLETED COMPLETED INPROGRESS ndrc ,tiles CONSTRUCTION
AREA

5
PTS-LV-39606-20 ND-415-20-188 PTS-LV-39919-21 PTS-LV-40499-21
ND-415-20-76 Ghariba
Markhanya Motared Mutared Maqam

ndrc ,tiles tiles ndrc ,tiles,green area tiles tiles

50% IS DONE

ndrc ,tiles tiles ndrc ,tiles,green area tiles tiles

1
DIV-415-21-31 PTS-LV-38300-20 ND-415-20-328 ND-415-20-241
Zakher Yahar SALAMAT MAQAM

90% IS DONE 100% 17% 50%

4cx240 Al -12 mtr

4cx240 Al -12 mtr

INPROGRESS COMPLETED INPROGRESS INPRORESS

3 5 8

3 5
ND-415-20-162 PTS-LV-40775-21 falaj PTS-LV-40758-21 PTS-LV-40658-21
MAQAM hazza Markhanya amrrah

60%

inprogress INPRORESS still not started


pending /confirmation is
required regarding FP/ST
number
8
PTS-LV-38238-20 PTS-LV-39240-20 Al PTS-LV-40347-20 PTS-LV-40741-21 Al
ND-415-21-94 MAQAM
um alqatta yahar Al yahar yahar

still not started/ndrc and


still not started.tiles still not started.tiles still not started.tiles
tiles for main . Tiles for still not started
permit permit permit
service
PTS-LV-39615-20 PTS-LV-40207-21 PTS-LV-40384-21 Al PTS-LV-40735- 21
Al yahar ZAKHER saad Ghraibah

NOT STARTED .
still not started.tiles STIL NOT STARTED.
INPROGRESS NEEDPERMIT TO ENTER
permit INTERLOCK
THEPALACE
PTS-LV-40564- 21 PTS-LV-40730- 21
SALAMAT ZAKHER

NOT STARTED .. TILES INPROGRESS

1
Scheme Number PTS-LV-37514-19 ND-415-20-179

Location Al Maqam Neima

As built drawing
Completion
SD
Commissioning
Joint Measurement
DIV-415-20-54 ND-415-219
DIV-11-20-91
SAROOJ
Sarooj Al Yahar MUTHARTH
PTS-LV-39192-20 PTS-LV-39130-20 PTS-LV-39129-20 ND-415-20-80

SALAMAT SALAMT AL KHAZNA Neima

05-12-2020
cable layed
ND-11-20-145
PTS-LV-39083-20 PTS-LV-37960-20 OHL-11-20-209 OHL-11-20-237

Saad Muajei AlYahar AL RAWDA Al Saad


ND-11-20-78 ND-11-20-145 ND-415-219
DIV-11-20-91 OHL-11-20-179

MARKHANIA Saad Al Yahar MUTHARTH Remah


ND-11-20-78
OHL-11-20-201 PTS-LV-39415-20 ND-415-20-246

Remah Remah MARKHANIA Zakher


PTS-LV-39150-20 PTS-LV-37908-20 PTS-LV-38872-20 DIV-415-20-108

Al Mutharth Zakher neima maqam


PTS-LV-37990-20 PTS-LV-39229-20 PTS-LV-39772-20 DIV-415-21-14 PTS-LV-40073-21

Sanaya Al Mutared Al Swihan Muajei Markhanya


PTS-LV-40629-21 ND-415-21-85 PTS-LV-40524-21 PTS-LV-38587-20

Khazna yahar Al Saad zakher


Scheme Number PTS-LV-37990-20 PTS-LV-39229-20 ND-415-20-142
Location Industial Area Al mutared Al Markhania

Recived Date
Survey Done Done Done

sent to huda Sent 5402883

Permition Number - -

remarks - Sent

The Rev is Approved


Green Area 10-12-2020
permits are prepared
PTS-LV-39083-20 Rev.1 DIV-415-20-82 PTS-LV-39303-20 ND-415-20-267 PTS-LV-38747-20
Al Muaijii zakher AQABIA AQABIA ALYAHAR

Done Done Done Done Done

Sent
pending Sent Sent
Excavation

E
Sent

needs a Rev. Scheme one duct is full


one duct with single cable
ndrc is needed
OHL-11-20-237 Div-415-20-91 OHL-11-20-209 ND-415-20-246 PTS-LV-39150-20

AL Saad Almotared AL RAWDA Zakher Mutharth

Done Done Done Done Done

excavation excavation
NA NA NA permit sent to permit sent to
muheeb muheeb

waiting HV 17-12
PTS-LV-37908-20 PTS-LV-38872-20 PTS-LV-38713-20 PTS-LV-38589-20

neima Zakher center of Al Ain center of Al Ain

Done Done Done Done

tiles lifting NDRC&interlock


excavation permit tiles lifting ,ndrc ,
permit sent to tiles permit is
sent to muheeb bike truck permit
muheeb required
PTS-LV-38452-20

towayya

Done

tiles lifting ,ndrc ,


bike truck permit
required
RECOVERY
SCHEME NUMBER EQUIPMENTS CABLE SIZE
PTS-LV-39129-20 FP 6-WAY
4Cx70mm
AL KHAZNA KZST0083
PTS-LV-39130-20 ST
4CX25mm
AL SALAMAT SDST1142
ND-20-415-136
- 4cX120mm
Shouiba
PTS-LV-39203-20
- 4cx50mm
Asharej

PTS-LV-39192-20
- 4cx70mm
AL Salamat
ND-11-20-78 - 4cx70mm
Markhania
DIV-20-415
- 4CX25mm
Sarooj
OHL-11-20-145
Saad
ND-415-219
- 4cx70mm
Al Yahar

PTS-LV-38745-20
- 4cx70mm
Al Wagan (Waris site)

ND-415-20-112 Salamat

PTS-LV-39083-20 Muajei
OHL-11-20-201
PTS-LV-39415-20
OHL-11-20-248
PTS-LV-38587-20
PTS-LV-40524-20
PTS-LV-40582-21
CABLE LENGTH Recovered length in scheme the remainig SD

39m Done
40m Done
131.5 m Done
205m Done
97 m 169 m can not be done Done

0 55 m can not be done done

174.85 m 204 m can not be done Done 80cm depth

127m 199m no remaining Done from ST not S/S

2.6m 5m Done Done

4CX16-89 MTR tornido

50 Hold Not yet

130.75m 265 hold


done
354
done
4cx120-127 mtr done
4CX50 -35.6 mtr done
7 MTR done
Not yet
Not yet
Not yet
Not yet
Extra in Sharekat store
4cx70mm = 6.85m
Permissions Status
Scheme Area Type Number
ND-415-20-136 Shoiba NDRC 5219250
ND-415-20-136 Shoiba Tiles 5219114
ND-415-20-136 Shoiba Excavation 5219024

PTS-LV-39203-20 Asharej Tiles 5263947

PTS-LV-37944-20 Muaiji Tiles 5290707

ND-415-20-179 Neima NDRC1 5268896


ND-415-20-179 Neima NDRC2 5268916
ND-415-20-179 Neima TILES 5268930
ND-415-20-179 Neima Excavation 5268891

PTS-LV-37514-19 Al Maqam Tiles 5353228


PTS-LV-37514-19 Al Maqam Excavation 5353351

PTS-LV-37960-20 Al Yahar Tiles 5309222

ND-415-20-219 Al Yahar NDRC 5356478


ND-415-20-219 Al Yahar Tiles 5356462
ND-415-20-219 Al Yahar Excavation 5356472

PTS-LV-38747-20 Al Yahar Tiles


Status Sent To eng. Huda
closed sent 100%
closed sent 100%
closed sent 100%

Done sent 100%

Done 100%

Done Sent 100%


Done Sent 100%
Waiting Al Asab 50% up to the current status
excavated Sent 100%

Waiting Al Asab 50%


Done Sent 100%

Done Done

50% sent 50%


30% 30%

25%
Permit flow & pe
Scheme No:
Area :
Permit type:
Permit No:
Expired Date:
30%

50%

75%

100%

remarks

Permits Pro
Color Code Status Description NDRC
Blue board
Not yet 30%
+ Safety

Done 50% Machine photos

Done and sent to


Mohammed Mohieb 75% Pipes pulling

100% Housekeeping
mit flow & permit Status

Permits Progress
Tiles lifting Excavation
Blue board Blue board
+ Safety + starting + Safety
Cable Laying Cable Laying
+ warning tape + warning tape

Layrs +
Backfilling
The Technician
Housekeeping Housekeeping
Weekly

Jun-21
Scheme No. Cable Size Week 1 (m) Week 2 (m) Week 3 (m)

ND-415-20-63 4cx185 Al sq.mm 39

ND-415-20-12 4cx120 Cu sq.mm 103

ND-415-20-76 4cx185 Al sq.mm 39

PTS-LV-38587-20 4CX240 Cu sq.mm 56

PTS-LV-38300-20 4CX240 Cu sq.mm 12

PTS-LV-38579-20 4CX16Cu sq.mm 137

PTS-LV-40582-21 4CX240 Al sq.mm 136

ND-415-20-93 4cx185 Al sq.mm 77

ND-415-20-169 4CX240 Cu sq.mm 340

ND-415-20-63 4CX240 Cu sq.mm 264

Total Cable laying in week (m) 522 681 0


Total Manpower in week (Nos)*

Grand Total

* - The number of labours present in the week only needs to be mentioned (not hrs)
Weekly Progress Report of Total Length o

Week 4 (m)

0
Length of Cable Laying