Work Flow & Work Status: Engineer: Mohammed Mohieb
Work Flow & Work Status: Engineer: Mohammed Mohieb
7 Equipment installation
8 Backfilling
50%
9 Interlock reinstatement
Diversion
4cx185-3 mtr
4cx120- 32 Mtr 4cx120- 43 Mtr
4cx120-8 mtr
100% 100%
4cx240r-650 Mtr
4cx16-90 Mtr 4cx185-80 Mtr 4cx16 -120 Mtr
4cx150-135 Mtr
4cx240r-714 Mtr
4cx185-83Mtr 4cx16-115 mtr
4cx150-137 Mtr
100% 100%
4cx120-115 mtr
INTERLOCK PERMIT
INTERLOCK PERMIT NDRC PERMIT INTERLOCK PERMIT NDRC PERMIT ,
4cx16-133 mtr
4cx16-137 mtr
100% 100%
85%
8 12
PTS-LV-39594-20 PTS-LV-39022-20 DIV-415-21-14 DIV-415-21-45 ND-415-21-12
Zakher Swihan Muajei Bateen Markhanya
MAIL RECEIVED
NOT STARTED. TILES done by noor FROM AADC COMPLETED NDRC,Tiles
13
6
PTS-LV-40073-21 PTS-LV-40629-21 PTS-LV-40394-21
ND-415-21-85 yahar
Markhanya Khazna zakher
4cx240-230 mtr
4cx150-77 mtr 4cx185-370 mtr 4cx185 Al-10 mtr
4cx240-226 mtr
4cx150-73 mtr 4cx185-373 mtr 4cx185 Al-9 mtr
ndrc ,tiles
PENDING .
COMPLETED COMPLETED INPROGRESS ndrc ,tiles CONSTRUCTION
AREA
5
PTS-LV-39606-20 ND-415-20-188 PTS-LV-39919-21 PTS-LV-40499-21
ND-415-20-76 Ghariba
Markhanya Motared Mutared Maqam
50% IS DONE
1
DIV-415-21-31 PTS-LV-38300-20 ND-415-20-328 ND-415-20-241
Zakher Yahar SALAMAT MAQAM
3 5 8
3 5
ND-415-20-162 PTS-LV-40775-21 falaj PTS-LV-40758-21 PTS-LV-40658-21
MAQAM hazza Markhanya amrrah
60%
NOT STARTED .
still not started.tiles STIL NOT STARTED.
INPROGRESS NEEDPERMIT TO ENTER
permit INTERLOCK
THEPALACE
PTS-LV-40564- 21 PTS-LV-40730- 21
SALAMAT ZAKHER
1
Scheme Number PTS-LV-37514-19 ND-415-20-179
As built drawing
Completion
SD
Commissioning
Joint Measurement
DIV-415-20-54 ND-415-219
DIV-11-20-91
SAROOJ
Sarooj Al Yahar MUTHARTH
PTS-LV-39192-20 PTS-LV-39130-20 PTS-LV-39129-20 ND-415-20-80
05-12-2020
cable layed
ND-11-20-145
PTS-LV-39083-20 PTS-LV-37960-20 OHL-11-20-209 OHL-11-20-237
Recived Date
Survey Done Done Done
Permition Number - -
remarks - Sent
Sent
pending Sent Sent
Excavation
E
Sent
excavation excavation
NA NA NA permit sent to permit sent to
muheeb muheeb
waiting HV 17-12
PTS-LV-37908-20 PTS-LV-38872-20 PTS-LV-38713-20 PTS-LV-38589-20
towayya
Done
PTS-LV-39192-20
- 4cx70mm
AL Salamat
ND-11-20-78 - 4cx70mm
Markhania
DIV-20-415
- 4CX25mm
Sarooj
OHL-11-20-145
Saad
ND-415-219
- 4cx70mm
Al Yahar
PTS-LV-38745-20
- 4cx70mm
Al Wagan (Waris site)
ND-415-20-112 Salamat
PTS-LV-39083-20 Muajei
OHL-11-20-201
PTS-LV-39415-20
OHL-11-20-248
PTS-LV-38587-20
PTS-LV-40524-20
PTS-LV-40582-21
CABLE LENGTH Recovered length in scheme the remainig SD
39m Done
40m Done
131.5 m Done
205m Done
97 m 169 m can not be done Done
Done 100%
Done Done
25%
Permit flow & pe
Scheme No:
Area :
Permit type:
Permit No:
Expired Date:
30%
50%
75%
100%
remarks
Permits Pro
Color Code Status Description NDRC
Blue board
Not yet 30%
+ Safety
100% Housekeeping
mit flow & permit Status
Permits Progress
Tiles lifting Excavation
Blue board Blue board
+ Safety + starting + Safety
Cable Laying Cable Laying
+ warning tape + warning tape
Layrs +
Backfilling
The Technician
Housekeeping Housekeeping
Weekly
Jun-21
Scheme No. Cable Size Week 1 (m) Week 2 (m) Week 3 (m)
Grand Total
* - The number of labours present in the week only needs to be mentioned (not hrs)
Weekly Progress Report of Total Length o
Week 4 (m)
0
Length of Cable Laying