Section 6. Bill of Quantities
Section 6. Bill of Quantities
Bill of Quantities
Table
Bill of Quantities
Name :
Proportion 1:3.
12 16- 16- Earth work by manual labour in all kinds of cum 255.75
400 400 soil in excavation or reexcavation of
channels with the initial lead of 30m and lift
of 1.5m including levelling, dressing and
throwing the spoils to profile with breaking
clods, rough dressing, clearing jungles
including cutting trees up to 200mm girth,
dug bailing etc. complete as per direction of
Engineer in charge.
13 76- 766- Supplying, fitting and fixing of the 225mm nos 24
470 470- long hasp bolts of approved quality and as
20 per direction of Engineer in charge.
* Note: All applicable taxes, custom duties, VAT and other levies payable by the Contractor under the Contract shall be included in the
unit prices submitted by the Tenderer.