LOAD SCHEDULE

NO. OF OUTLET
2a 3a
SIZE OF CONDUCTORS
1 1a 2 2b 3 4 CKT. NO. LOAD DESCRIPTION
LO CO SW SCO
VA VOLTS AMPERES PROTECTION
20AT, 2P,
AND CONDUITS
1 LIGHTING OUTLET 6 2 600 230 2.61 2-2.0 sq.mm THHN Cu IN 15 mm DIA uPVC
MCCB
2 LIGHTING OUTLET 6 2 600 230 2.61 20AT, 2P, 2-2.0 sq.mm THHN Cu IN 15 mm DIA uPVC
MCCB
20AT, 2P,
15200 3 LIGHTING OUTLET 3 3 300 230 1.31
MCCB
2-2.0 sq.mm THHN Cu IN 15 mm DIA uPVC
4 LIGHTING OUTLET 4 1 400 230 1.74 20AT, 2P, 2-2.0 sq.mm THHN Cu IN 15 mm DIA uPVC
MCCB
3775 1405 995 3250 655 545 4575 5 LIGHTING OUTLET 4 1 400 230 1.74 20AT, 2P, 2-2.0 sq.mm THHN Cu IN 15 mm DIA uPVC
MCCB
6 CONVENIENCE OUTLET 2 1 360 230 1.13 20AT, 2P, 2-3.5 sq.mm THHN Cu IN 15 mm DIA uPVC
MCCB
E TOTAL 1 11.14
COMPUTATION
Total Connected Load = 11.14 A
Demand Factor = 8.912 A
3080

Wire Size = 2-38mm2 THHN & 1-22mm2 TW in 32mm dia. PVC


Main Protection = 120 AT/120AF, 2P, 230V 60Hz, BOLT-ON
D S S GENERAL NOTES:
ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
ACCORDANCE WITH THE NATIONAL BUILDING CODE,
PROVISIONS OF THE LATEST APPROVED PHILIPPINE ELECTRICAL
3000

CODE, THE LAWS AND ORDINANCES OF THE LOCAL CODE


ENFORCING AUTHORITIES AND REQUIREMENTS OF THE LOCAL
ELECTRIC, TELEPHONE COMPANY AND BUILDING
ADMINISTRATION REQUIREMENTS.
1. CONTRACTOR SHALL SECURE ALL ELECTRICAL PERMIT AND
C ALL FEES REQUIRED FOR THE WORKS AND FURNISH THE
OWNER THE CERTIFICATE OF FINAL ELECTRICAL
INSPECTION,
14500

C1 2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST,


2845

WIRE INSULATION AND LOAD TEST UPON COMPLETION OF


WORKS,
C2
3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITE
Scde CONDITION, SPECIFICATIONS & REVISIONS/ CHANGES, THE
CONTRACTOR SHOULD IMMEDIATELY VERIFY & CONSULT
B TO/WITH THE ELECTRICAL ENGINEER OF THE PNP
ENGINEERING SERVICE (PNPES),
S S 4. ALL LOCATION & MOUNTING HEIGHTS ARE SUBJECT TO
C5 APPROVAL OF ELECTRICAL ENGINEER OF PNPES,
5. CONTRACTOR SHALL BE RESPONSIBLE IN THE PREPARATION
OF AS-BUILT PLANS DULY SIGNED AND SEALED BY A
PROFESSIONAL ELECTRICAL ENGINEER, AND ELECTRONIC
AUTOCAD FILES,
5574

C4
6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL BE
APPROVED BY PNPES, REPRESENTATIVE/ENGINEER,
C3 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION
OF SHOP OR CONSTRUCTION DRAWING REQUIRED BY
OWNER/ARCHITECH/ENGINEER, THIS INCLUDES DEVICES
AND FIXTURES ELEVATION,
Sab 8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDE
A ALL COST NECESSARY TO COMPLETE THE SYSTEM AT NO
COST TO OWNER, INCLUDING COST OF CORING SERVICE
AND EXPENSES FOR THE RESTORATION OF ANY DAMAGE/
AFFECTED CIVIL/ ARCHITECTURAL FINISHES OR
RELOCATION OF EXISTING FACILITIES ON BUILDING,
9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TO
ACCESSIBLE PLACE OR WITH ACCESS PANELS,
10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTS
TO BE INSTALLED OR PLACE WITHIN THE BUILDING, AND
1 LIGHTING LAYOUT PLAN MAKE AN ADJUSTMENT WITH THE PNPES ENGINEER/
ARCHITECT CONSENT,
E-1 SCALE 1:100M 11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANY
MATERIALS AND FITTINGS NOT SHOWN ON THIS PLANS
BUT NEEDED TO COMPLETE THE SYSTEM AND OPERATION
SHALL BE INCLUDED WITH THE CONTRACTOR'S SCOPE OF
WORKS.
PROJECT TITLE: PREPARED BY: RECOMMENDED BY: APPROVED BY: REVISIONS: SHEET CONTENT SHEET NO.
REPUBLIC OF THE PHILIPPINES
PROVINCE OF QUEZON
MUNICIPALITY OF PANUKULAN REPAIR OF NFA BUILDING E-1
OFFICE OF THE MUNICIPAL ENGINEER 10 10
ENGR. JOHN ALVIN T. MORALES ENGR. RICHARD C. GUCILATAR HON. ALFRED RIGOR S. MITRA
LOCATION: BRGY. SAN JUAN, PANUKULAN QUEZON ENGINEER II MUNICIPAL ENGINEER MUNICIPAL MAYOR NO DESCRIPTION DATE