Professional Documents
Culture Documents
M BD1 1SVDPN Ckea Edr 145007 - 002
M BD1 1SVDPN Ckea Edr 145007 - 002
N
5998.63 mm
17 18 19 20 21 22 23 24 25 26 27 28
5600 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
B B
~ 2060
Electronic drawings once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision.
C BONDING TO C
REFER TO DETAIL G21 TYPE 1 IN SEE 2265
STRUCTURE
DRAWING NOTE 8
SEE NOTE 8 EARTH (TYP.) REFER TO DETAIL G15 IN RAWING
M-100DPN-CKEA-EDR-155005 (TYP.)
M-BD1-100DPN-CKEA-EDR-155003
ELECTRICAL EBB-22 (TYP.)
ROOM SEE
405 1815
EXTERNAL EARTHING LOOP NOTE 8 SEE NOTE 8
BARE COPPER CONDUCTOR 00-17
120mm² BURIED IN SOIL E
(TYP.)
REFER TO DETAIL
A
STORAGE & EARTH PIT
UP TO EEB-30 T SUPPLIES G46 IN DRAWING
EARTH PIT EBBx2ROOM 2000 M-BD1-100DPN-
OF ROOF FLOOR EBB-11 2000
D 00-15
CKEA-EDR-155010 D
4250
T TECH/CONTROL/PUMP EBB-21
1800 mm
1810.33 EBB-20 EBB-18 00-14 405 E
EBB-19 SEE
1915
EDP2-SV-02-G01 EBB-16
2075
405
E SEE NOTE 6
.
00-16 EBB-17 E
405
E
LCP
B
REFER TO DETAIL G46
IN DRAWING M-BD1- REFER TO DETAIL G21 IN REFER TO DETAIL G21 IN
100DPN- 1595 2405 DRAWING SEE
1595 DRAWING
CKEA-EDR-155010 M-100DPN-CKEA-EDR- M-100DPN-CKEA-EDR- NOTE 8
E (TYP.) 155005 (TYP.) 155005 (TYP.)
E
TRANSVERSAL EARTHING
1600 405 FLAT STEEL 50mm x 4mm IN
SLAB CONCRETE (TYP.) 405
405 1600
8215
9150
REFER TO DETAIL G56
IN DRAWING M-100DPN-
CKEA-EDR-155011 (TYP.)
E .
LCP
C
530
400
EBB-08
MATCHLINE - FOR CONTINUATION REFER NO. M-BD1-1SVDPN-CKEA-EDR-145002 & 145003 UP TO MEZZANINE FLOOR
NOTES
NOT LESS THAN 16mm² COPPER (REQUIRED DUE THE PRESENCE OF A LIGHTNING
Models\M-BD1-1SVDPN-CMEP-BIM-000013-STABLING_VWASH_BLDG.rvt
A B C D E F
REVISIONS PROJECT BACS CONSORTIUM BACS APPROVAL DATE SCALE PAPER DRAWING TITLE
SIZE
No
002
Date
27 SEP 2017
Description
ISSUED FOR CONSTRUCTION
Drawn
M. Tai
Checked
S. Wung
Approved
K. Ho 1 : 100 A1 BD1-DEPOT FACILITY
L 00C 13 JUL 2017 100% FINAL DESIGN M. Tai S. Wung K. Ho L
0C1
001
24 FEB 2017 100% FINAL DESIGN M. Tai
M. Tai
S. Wung
S. Wung
K. Ho
K. Ho
DRAWING STATUS
LINE 1 NORTH STABLING V-WASH
000
22 AUG 2016
29 MAR 2016
REVISED PER RMTC REVIEW COMMENT
ISSUED FOR CONSTRUCTION M. Tai S. Wung K. Ho ISSUED FOR CONSTRUCTION ELECTRICAL
CONSULTANT / SUB-CONTRACTOR
RIYADH METRO PROJECT This drawing has been Approved and EARTHING & LIGHTNING LAYOUT -
Certified as acceptable on behalf of the BECHTEL, TEU, TAIPEI
www.bacsrmp.com BACS Consortium. GROUND FLOOR PLAN - PART G
LEAD DESIGN ENTITY (LDE) APPROVED BY LDE DRAWN BY CHECKED BY APPROVED BY DRAWING NUMBER REVISION
NAME NAME NAME NAME
K. Yang M. Tai S. Wung K. Ho M-BD1-1SVDPN-CKEA-EDR-145007 002
M
© 2017 High Commission for the Development of ArRiyadh
BECHTEL DATE 27 SEP 2017 DATE 27 SEP 2017 DATE 27 SEP 2017 DATE 27 SEP 2017
M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 002 v01
Tomasz Bieniek (WF-063671) 05/10/2017 - DCC T&D