Tool Maintenance

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

Doc. No.

GEPL:F:MNT:01T
GROWTH ENGINE PVT LTD Rev. No. 00
LIST OF DIE & TOOLS EFF. Date: 01.04.2018

Sl. No. Part Name / No. Model Customer Name Die Description Die No. PM Freq. Expected Die Life Die Make Location

Prepared By: 1 OF 12 Approved By:


Doc. No. GEPL:F::MNT:03T
GROWTH ENGINE PVT LTD Rev. No. 00
DIE PREVENTIVE MAINTENANCE MONTHLY PLAN EFF. Date: 01.04.2018
Sl. Die PM Plan MONTH OF MAY-2018
Part Name / No. Model Die No. Frequency Remarks
No. Actual Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual

Prepared By: 2 of 12 Approved By:


Fmt No.:- GEPL:F:MNT:02T
GROWTH ENGINE PVT LTD Rev No.:- 00
DIE HISTORY CARD EFF. Date:- 01.04.2018
PART NAME PROCESS NAME / NO.

PART NO. DIE NO.

Model DIE LIFE

Customer Name : - P/M FREQUENCY AS PER PRODUCTION:

Date & Time of Date & Time of Un-


Status Brake down Hr.
Loading Loading Qty. Cumm. Supervisor P/M & B/D Spare Part Tool Room
S.No. Remark If Any
Produced Qty. Sign. Date Cumm. Used I/C Sign.
Date Time Date Time Prod B/D P/M P/M Hrs. B/D Hrs.
B/D Hrs.

Prepared By: Approved By:


DOC. NO.- GEPL:F:MNT:04T
GROWTH ENGINE PVT LTD REV. NO.- 00
DIE PREVENTIVE MAINTENANCE CHECK SHEET EFF. DATE- 01.04.2018

पार्ट का नाम: मॉडल : डाई का नाम:

प्रिवेंटिव मेंटेनेंस से पहले की प्रिवेंटिव मेंटेनेंस के बाद की


चेक पॉइंट्स स्पेसिफिके शन चेकिं ग मेथड प्रॉब्लम क्या है मेंटेनेंस का विवरण रिमार्क यदि कोई है
कं डीशन कं डीशन
क्रम सं.

प्रिवेंटिव मेंटेनेंस दिनांक: OK


अगली मेंटेनेंस की दिनांक:
प्रिवेंटिव मेंटेनेंस के बाद स्टेटस √ टिक करें NOT OK
स्पेशल नोट :
डाई की मेंटेनेंस करने से पहले तथा मेंटेनेंस के बाद पोका-
मेंटेनेंस समय: योके चेक करना अनिवार्य है |
प्रोडक्शन इंचार्ज के हस्ताक्षर पोका योक को उसके स्टैण्डर्ड के अनुसार चेक करना हैं

Prepared By: Approved By:


डाई की मेंटेनेंस करने से पहले तथा मेंटेनेंस के बाद पोका-
योके चेक करना अनिवार्य है |
प्रोडक्शन इंचार्ज के हस्ताक्षर पोका योक को उसके स्टैण्डर्ड के अनुसार चेक करना हैं
मेंटेनेंस करने वाले का हस्ताक्षर:

Prepared By: Approved By:


6 OF 12

DOC. NO.- GEPL:F:MNT:05T


GROWTH ENGINE PVT LTD REV. NO.- 00
DIE PREVENTIVE MAINTENANCE CHECK SHEET EFF. DATE- 01.04.2018

PROCESS TYPE OF POKA-YOKE METHOD OF CKECKING


S.NO PART NAME/NO. MODEL PICTURE
NAME POKA-YOKE DETAIL CHECKING RECORD

नोट : जिन डाईयों में पोका-योके लगा है उन डाईयों की लोअर प्लेट को नीले रंग से पेंट करना है जिससे पोका-योके वाली डाई आसानी से पहचान में आ जायेगी |

Prepared By: Approved By:


7 OF 12

REV. NO.- 00
EFF. DATE- 01.04.2018

INSTALLATION
DATE

ससे पोका-योके वाली डाई आसानी से पहचान में आ जायेगी |

Prepared By: Approved By:


Doc No.:GEPL:F:MNT:06T
GROWTH ENGINE PVT LTD Rev No:-00
DIE PREVENTIVE MAINTENANCE CHECK SHEET
EFF.Date:-01.04.2018

1. क्रिटिकल स्पेयर पार्ट का स्टॉक हमेशा मेंटेन रखें


2. स्टॉक मिनिमम क्वांटिटी से कम होने पर तुरंत आर्डर करके स्टॉक को पूरा करें |

Available
S No. Part Description Used for Die Category Min. Qty Source of Supply
Qty

Monitoring Frequency:- Category:-


Weekly for Critical Parts C=Critical Spare Parts
Monthly for General Parts G=General Spare Parts

Date Checked By Verifyed by


DOC. N:-GEPL.F:MNT:07T

डाई ब्रेकडाउन रजिस्टर REV. NO.- 00


EFF. DATE : -01.04.2018

डाई खराब होने का डाई सही होने


Die का नाम/नंबर ब्रेक डाउन की जानकारी किस कारन खराब हुआ डाई में क्या ठीक किया गया क्या स्पेयर पार्ट लगा कु ल घंटे ख़राब रही
तारीख समय तारीख समय

Prepared By Approved By
DOC. N:-GEPL.F:MNT:07T
REV. NO.- 00
EFF. DATE : -01.04.2018

हस्ताक्सर

Prepared By Approved By
DIE BREAKDOWN TREND (2018)
Month Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18

Target 100 100 100 100 100 100 100 100 100 100 100 100

Actual B/D

TARGET :- 100 Hrs.


500 500.0

450 450.0

400 400.0

350 350.0

300 300.0

B/D TIME
TARGET

(Hrs.)
250 250.0

200 200.0

150 150.0
100 100 100 100 100 100 100 100 100 100
100 100 100.0
100
50 50.0

0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18

MONTHS

Prepared by : Checked by : Approved by :


GEPL:F:MNT:07T

CORRECTIVE ACTION & PREVENTIVE


ACTION
Die Name Die No. : Date : CFT Team

Maintenance head:

Problem Description & Data:

Why-why analysis :

1st why 2nd why 3rd why 4th why 5th why

Final root cause :

Corrective Action:-

Preventive Action:-

Standrization

Horrizontal Deployment

Effectivness verification

Prepared By Approved By

You might also like