Inspection and Test Plan For Shell and Tube Heat Exchanger - Sample01
Inspection and Test Plan For Shell and Tube Heat Exchanger - Sample01
Home General Fix Equipment Rotary Equipment E & I Equipment I4I Academy Services
Get in Touch
This page provides a sample inspection and test plan for shell
Like 2.1K Search this Site! More than 600
and tube heat exchanger which is used in the manufacuring
Articles!
process. Click on the following link:
Home
GENERAL
Vendor Inspection
Commodity Inspection
Inspection and Test Plan for Shell and Tube
Industrial Inspection
Heat Exchanger
Quality Control
You may also want to review heat exchanger inspection and shell
Plant Inspection and tube heat exchanger inspection procedure/instruction articles.
Coating Inspection
The ASME Code Section VIII Div. 1 or 2 requirements normally are
Pre-Shipment Inspection applied for inspection and test plan in manufacturing shop.
Vendor List The witness of some inspection and test by third party inspector is
mandatory and cannot be waived.
FIX EQUIPMENT
https://www.inspection-for-industry.com/inspection-and-test-plan-for-shell-and-tube-heat-exchanger.html 1/3
م8:02 2022/5/12 Inspection and Test Plan for Shell and Tube Heat Exchanger - Sample
Pressure Vessel Some others must only monitored and fully witnessing is not
necessary, for these items, the inspection man-days etc. depends
Heat Exchanger to the purchaser decision, some prefer stringent monitoring and
even assign resident inspector in manufacturing shop and some
Piping System others relay to quality control system of the manufacture and
assign only few days for monitoring points.
Industrial Valve
Steam Boiler These are some of inspection points which need to be witnessed,
checked, monitored and reviewed by third party inspector in shell
Storage Tank and tube heat exchanger manufacture shop.
Process Heater
Inspection and Test Plan for Shell
ROTARY
and Tube Heat Exchanger - Important
EQUIPMENT Points
All plates need to be
identified against mill test certificates at
Centrifugal Pump
the Vendor`s works before
commencement of fabrication.
Centrifugal Compressor
Mill inspection of
materials.
Reciprocating Compressor
Ensuring that welding
procedure and welders are qualified
before commencement of fabrication.
Gas Turbine
Checking fit-up and
witness chipping-back of welded seams.
Steam Turbine
Wherever applicable,
selecting spots for radiography.
Fan & Blower
If specified witnessing
any crack detection, hardness checks,
ultrasonic tests etc. Which are
specified in drawing,
E & I EQUIPMENT specification, data sheet etc.
Complete dimensional
checking for stacked units. This is to
Power Transformer
be carried out in the full assembly
stage.
Control Panel
Checking that all
material test certificates and where
Switchgear applicable, heat treatment charts are
in order. Ensure that
Vendor is familiar with the requirements regarding
data books
Power Cable and see that the documentation is submitted without any
delay.
Like Share 2.1K people like this. Be the first of your friends.
API SIFE Training
API 570 Training Inspection and Test Plan for Reciprocating Compressor, Inspection and Test Plan for
Centrifugal Pump, Inspection and Test Plan for Gas Turbine, Inspection and Test
API 653 Training
Plan for Steam Turbine, Inspection and Test Plan for Fan and Blower, Inspection and
Test Plan for Water Tube Boiler, Inspection and Test Plan Fire Tube Boiler,
API 1169 Training
Inspection and Test Plan for Centrifugal Compressor, Inspection and Test Plan Fin
Quality Control Training Tube Heat Exchanger, Inspection and Test Plan for Pressure Vessel, Inspection and
Test Plan for Storage Tank, Inspection and Test Plan for Line Pipe, Inspection and
ASME Training Course Test Plan for Steel Structure, Inspection and Test Plan for Valve
ASME IX Training
Did you find this article useful? Click on below Like and G+1
CWI Endorsement Training buttons!
https://www.inspection-for-industry.com/inspection-and-test-plan-for-shell-and-tube-heat-exchanger.html 2/3
م8:02 2022/5/12 Inspection and Test Plan for Shell and Tube Heat Exchanger - Sample
Like 2.1K
I4I Academy Contact
SERVICES
Contact Us
Privacy Policy
Pravananda Roy
thanks, it will help me to make an inspection
Like · Reply · 6y
We will be updating and growing
Facebook Comments Plugin
this site with more and more of
industrial inspection related