Lab Manual Primavera Lab
Lab Manual Primavera Lab
THEORY: Primavera is comprehensive, high performance multi project planning and controls software.
It is ideal for project extensive industries.
Primavera helps organization manage just about any type of portfolio. Primavera gives a multitude ways
to organize filter and sort activities, projects and resources. It has a rich graphical interface to plan and
manage reports on projects.
OBJECTIVE:
1) The course demonstrates the useful application of software in project management and helps
participants develop skills to handle project using Primavera covering all basic feature of
software over web and offline.
2) Participants learn planning, scheduling and controlling of small and large scale project driving
down cost minimizing risk and delivering result for key stake holders, selecting the right strategic
wise of project and enhancing resource capacity.
3) The course helps participant design develop and maintain detail resource loaded schedule, modify
project or integrate multiple project schedule.
Experiment no -2
AIM – Applying Critical Path Method (CPM) in project management using Primavera
THEORY – Critical path is the longest duration path through a network diagram and determine the
shortest time to complete the project .
Critical path method- The critical path method is an algorithm for scheduling a set of project activities.
It is commonly used on conjunction with the program evaluation and review technique. A critical path is
determined by identifying activities and measuring the time required to complete them from start to
finish.
Float-In project management, float or slack is the amount of time that a task in network can be delayed
without causing a delay to:
PROCEDURE
CONCLUSION
THEORY:
Database server:
The stand-alone installation of Oracle Primavera P6 software, installs Oracle Database Express Edition
(Oracle Database XE). This database server component of the stand-alone installation is required to store
the P6 project management databases on an individual computer
There will be three default users for both Project Management and Methodology Management:
For Project Management, the default users are ADMPRM$PM, PRIVPRM$PM, and
PUBPRM$PM.
For Methodology Management, the default users are ADMPRM$MM, PRIVPRM$MM, and
PUBPRM$MM.
Desktop client:
The Project Management desktop client enables users to access the Project Management database
to plan and control a large number of projects.
The Methodology Management desktop client enables users to access the Methodology
Management database to create project templates if this optional functionality is being
implemented.
PRIMAVERA USER INTERFACE:
(Students to write short notes on each of the entities of user interface as below, faculty to discuss the tabs
in detail)
1. Main Menu: (Write small notes on all the menu items and just name of functions in each menu)
2. Tool Bars: Small description of 2-4 lines
3. Table Window: Small description of 2-4 lines
4. Gant Chart Area: Small description of 2-4 lines
5. Detail Window: Small description of 2-4 lines
6. Customizable data Modification tabs: Small description of 2-4 lines and name of all the available
tabs.
EXPERIMENT NO: 4
INTRODUCTION:-
It can be defined as a model that is structured to help identify which employes will be responsible for
specific points of the project .
As project management is used in several job and industries and requires knowledge , skills and abilities
to complete a task on project from beginning to end. So OBS becomes integral part of it.
OBS IN PRIMAVERA
PROCEDURE TO IMPLEMENT
EXAMPLE:-
RESULT:-
PRECAUTION:-
THEORY:
Definitions Of EPS:
The enterprise project structure (EPS) represents the hierarchical structure of all project in the database.
the EPS can be subdivided into as many level or nodes as needed to represent work at your organization .
The number of EPS level and their structure depends upon the scope of your project and how you want to
summarize data.
PROCEDURE:
PRECAUTIONS:
SOFTWARE USED-Primavera P6
THEORY-
PROCEDURE
Go to the Enterprise project structure (E.P.S) from the Project Tab in the menu bar.
Select the calendar.
Edit the title under which we will create the whole.
Select add option to create new element/calendar.
Display the daily scheduled public holiday and expection in calendar.
RESULT- The calendar is thus created with the help of primavera P6.
EXAMPLE:
Case-1
Case-2
Add exception, say only the first half of the day is working on first and fourth Saturday of every
month.
Case-3
Add Public Holidays in the Schedule of the project