Professional Documents
Culture Documents
A. Shearing Action
A. Shearing Action
a. 1–4–2–3–5
b. 4–2–3–1–5
c. 2–4–3–1–5
d. 4–2–1–3–5
7. Miscellaneous function for coolant ON is
a. M08
b. M00
c. M03
d. M38
8. NC contouring is an example of
a. Continuous path positioning
b. Point to point positioning
c. Absolute positioning
d. Incremental positioning
9. During the execution of a CNC part program block N020 G02 X 45.0 Y 20.0 R 5.0 the
type of the tool motion will be
a. Circular interpolation - clockwise
b. Circular interpolation – counter-clockwise
c. Linear interpolation
d. Rapid feed
10. Match the following part programming codes with their respective functions
Part Programming Codes Function
P. G01 I. Spindle stop
Q. G03 II. Spindle rotation clockwise
R. M03 III. Circular interpolation -
anticlockwise
S.M05 IV. Linear interpolation
13. Circular arc on a part profile is being machined on a vertical CNC milling machine. CNC
part program using metric units with absolute dimensions is listed below:
---------------------------------------
N60 G01 X 30 Y 55 Z – 5 F50
N70 G02 X 50 Y 35 R 20
N80 G01 Z 5
---------------------------------------
The coordinates of the center of the circular arc are:
a. (30, 55)
b. (50, 55)
c. (50, 35)
d. (30, 35)
14. In a CNC milling operation, the tool must machine the circular arc from point (20, 20) to
(10, 10) at sequence number 5 of the CNC part program. If the center of the arc is at (20,10)
and the machine has incremental mode of defining position coordinates, the correct tool path
command is
a. N 05 G 90 G01 X–10 Y–10 R10
b. N 05 G 91 G03 X–10 Y–10 R10
c. N 05 G 90 G03 X20 Y20 R10
d. N 05 G91 G02 X20 Y20 R10
17. In the following geometric modeling techniques which is not a three dimensional
modeling?
a. Wireframe modeling
b. Drafting
c. Surface modeling
d. Solid modeling
19. The zero position on the CNC machine built-in coordinate measuring system is called
a. Reference point
b. Machine zero point
c. Work zero point
d. Program zero point
20. A CNC lathe is programmed and set to turn a diameter of 50mm, but on trial run the
diameter is found to be 50.2mm. Which one of the following will ensure correct diameter
during production?
a. Increase the tool offset by 0.2mm
b. Decrease the tool offset by 0.2mm
c. Increase the tool offset by 0.1mm
d. Decrease the tool offset by 0.1mm
22. Method by which contouring machine tools move form one programmed point to the next
is called
a. Interpolate
b. Drift
c. Tool movement
d. Swell
26. How to select the existing point/line or a chain and use in a new plane in CREO
modelling
a. Select all
b. Project
c. Extrude
d. Sketch
27. The tool that allows you to change the length by cutting off the end or the beginning is
a. Chamfer
b. Round
c. Trim
d. Clip
29. While solid modelling in CREO, how do you remove the material
a. Delete
b. Extrude
c. Sketch
d. Part program
30. The _____________ command sweeps a section along different trajectory.
a. Blend
b. Revolve
c. Variable section sweep
d. Helical sweep
31. How do you set your part modelling units in CREO Parametric?
a. Default template – check & Uncheck
b. Design menu- set units
c. Both a & b
d. None of the above
a. Magnetic chuck
b. Three jaw chuck
c. Four jaw chuck
d. All of these
a. Collet
b. Holder
c. CNC nut
d. None of the above
34. _______of motion is always the axis of the main spindle of the machine.
a. Z-axis
b. Y-axis
c. X-axis
35. The depth that the tool is plunged into the surface is called as ___________.
a. feed
b. depth of cut
c. depth of tool
d. working depth
36. In CREO Parametric modelling the part can be extruded only from ___________
a. Drawing
b. Overlapped sketch
c. Closed loop sketch
d. None of the above