GENERAL NOTES

1.0 ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED IN


ACCORDANCE TO THE PROVISION OF THE PHILIPPINE PLUMBING
CODE, THE NATIONAL BUILDING CODE AND THE RULES AND REGU-
LATIONS OF THE LOCAL MUNICIPALITY.
2.0 COORDINATE THE DRAWINGS WITH OTHER RELATED DRAWINGS AND
SPECIFICATIONS. THE ENGINEER AND/OR THE ARCHITECT SHALL
BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND HEREIN.
3.0 ALL PIPES SHALL BE INSTALLED AS INDICATED, ANY RELOCATION
REQUIRED FOR PROPER EXECUTION OF THE PLUMBING WORK SHALL
BE WITH PRIOR APPROVAL OF THE ENGINEER AND/OR THE ARCHITECT.
4.0 PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL
LOCATION, DEPTH AND INVERT ELEVATIONS OF ALL EXISTING PIPES
AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.
5.0 ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN ONE PER-
CENT (0.01) AND ONE-HALF PERCENT (0.005) MINIMUM UNLESS
OTHERWISE SPECIFIED.
6.0 WATER SUPPLY PIPE TO FIXTURE SHALL BE SIZED IN ACCORDANCE
WITH THE MANUFACTURER'S RECOMMENDATIONS.
7.0 ALL BRANCHES OF FIXTURE OR GROUP OF FIXTURES SHALL BE PRO-
VIDED WITH AIR CHAMBER MADE OF CAPPED VERTICAL EXTENSION
8.0 ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED @ 100 PSI
FOR A PERIOD OF TWO(2) HOURS BEFORE BURIED OR COVERED.
GALVANIZED IRON (G.I.) PIPES DIRECTLY IN CONTACT WITH THE
SOIL SHALL BE PROVIDED WITH TWO COATS OF MELTED ASPHALT
AND WRAPPED WITH JUTE CLOTH SOAKED IN MELTED ASPHALT.
9.0 THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES @ SITE
AND COORDINATE THE WORK WITH THE SEWER AND STORM DRAINAGE
LINE EFFLUENT DISPOSAL POINT AND WATERLINE SERVICE CONNEC-
TING/TAPPING POINT.
10.0 ALL PIPE SIZES AND OTHER DIMENSIONS ARE IN MILLIMETER
(MM) UNLESS OTHERWISE SPECIFIED AND ARE INDICATIVE OF
INSIDE DIAMETER. 150 150 150 150
900 650 650

LEGEND
SANITARY SEWER LINE
SANITARY VENT LINE
STORM DRAINAGE LINE
COLD WATER LINE (CWL)

1800
HOT WATER LINE (HWL)
MH MH MH

1650
PERFORATED PVC PIPE (PPVCP)

SS SOIL STACK
VS VENT STACK
VAC VENT ABOVE CEILING
VSTR VENT STACK THRU ROOF
SVTR STACK VENT THRU ROOF
VS VENT STACK
VUS VENT UNDER SLAB
DS
ACDP
DOWN SPOUT 1 SEPTIC TANK DETAILS
AIRCON DRAIN PIPE
CWR COLD WATER RISER 1 SCALE: NTS

CWLH COLD WATER LINE HYDRO


CWLM COLD WATER LINE MAIN
GT GREASE TRAP
WH-S SINGLE POINT-WATER HEATER
WH-M MULTI POINT-WATER HEATER
FD FLOOR DRAIN
DD DECK DRAIN
FCO FLOOR CLEANOUT
GCO GROUND CLEANOUT
CCO CEILING CLEANOUT
WM WATER METER
UP UNION PATENTE
HB/GV HOSE BIBB/ GATE VALVE
GV GATE VALVE
CV CHECK VALVE

ENGINEER: RIGHTS / LAW: PROJECT / LOCATION: OWNER: SHEET CONTENTS: SHEET NO.:
SAID DOCUMENT (R.A. 9266)
MILLENNIUM CITY BUILDERS AND Drawings and specifications duly signed, stamped

DEV'T - OPC or sealed, as instruments of service, are the


intellectual properties and documents of the P1
Unit 201 Thompson Square, Cor. Roces Ave. Tomas architect, whether the object for which they are
made is executed or not, It shall be unlawful for any
Morato, Brgy. Obrero, Quezon City DESIGNED BY:
ENGINEER person, without the consent of the architect or
MILLENNIUM CONTACT DETAILS: author of said documents, to duplicate or to make
CITY BUILDERS & DEVELOPMENT copies of said documents for use in the repetition of
(02 ) 8429 5147 / 0917 865 6780 REG. NO.: PTR NO.: and for other projects or buildings, whether DRAWN BY:
millenniumcitybuilders@gmail.com executed partly or in whole.
TIN NO.: DATE: