1. HIGHLIGHTS
1.1 In Feb- 2015, ROH Outturn was 864 wagons, which is 8.31 % higher than the ROH
Outturn of Feb 14 (799).
1.2 Out of NPOH arising of 471 BOXNs, 420 wagons (89.17%) were repaired in the sick
lines during Feb- 2015.
1.3 Kota workshop achieved an outturn of 441 VUs against the target of 440 VUs which is
0.22% higher than the target. The cumulative outturn for the year till Feb-15 is 4878
against the target of 4840 which is 0.78% higher than the target.
Common pipe bracket with control chamber is a part of air brake system fitted in under
frame of coach. After fitment, air brake testing is done with the help of single car testing.
But in case of any leakage from common pipe bracket the whole assembly is required to
be removed, another one fitted again then tested with single car test rig again. This whole
process takes time and repeating of fitment and testing activities.
To overcome, detention of coach on this account a test bench has been developed in air
brake section along with auxiliary reservoir, distributor valve, and brake cylinder. Common
pipe brackets can be pre-tested with supply of 10 kg /cm2 pressure, observing
movement of piston of air brake cylinder, the common pipe bracket is passed for the
fitment of coach.
2.3 Name of the innovation-: Test bench for LSD, APM, Quick coupling and Isolating
cock of DV by WRS/ KTT.
Background:
LSD and APM are modern equipments fitted on wagon. These devices replace the age old
manual empty load device system. A need was felt to test these equipments after these
are disassembled from wagon during POH and before refitting them to wagon.
Innovation:
A test bench was prepared in-house utilising released air brake system components and
measuring gauges. The test bench is capable to test the working of LSD and APM. In
addition, quick coupling and isolating cock of sandwich plate of DV are also being tested in
the same test bench.
Construction details: The following items were used.
1) Angles ( 50 x 50 ) mm
2) Base plate (5 mm)- 01 No.
3) MDF sheet- 01 No.
4) ½” Pipes and pipe fitting accessories.
5) Flexible rubber pipes with connecting sockets- 12 Nos.
6) Isolating cocks-08 Nos.
7) Air pressure gauges-06 Nos.
8) Pressure regulators
Benefits: 1) Defective component can be find out in lab and avoided from fitting
on wagon so in this way we can avoid unwanted labour.
2) This process is easier and safe for testing these components.
3) It is a RDSO requirement as per para 4.2 of Annexure-IX of G-97 manual of Air Brake
System for freight stock.
Cost: Rs. 9500/-
3. Performance of Workshops
3.1 CRWS/ BPL achieved an MLR outturn of 48 Coaches and carried out IOH of 20 Coach
bogie set.
Due to non-availability of bio-tanks, 40 eligible coaches were turned out with brackets
only. In addition 4 bio-tanks were provided in coach No.WC02203 WGSCN (this coach
was attended for MLR on 10.09.14 and turned out with bracket only).
3.2 During the month Kota workshop has turned out following wagons after POH as
under :-
3.2.1 06 nos BOXN ”C” wagons under RSP.
3.2.2 During the month 33 BVZC wagons were turned out. So far the average monthly outturn
of BVZC wagons till last month has been 9.5 and the highest outturn in any month during
this year was 13 (July’14). Thus the outturn in this month is more than 3 times the monthly
average outturn of BVZC wagon
3.2.3 09 BVZI wagons(out of these 08 wagon received with twin pipe system and 01 BVZI
wagon were retrofitted with twin pipe system).
4 Divisional Performance
4.1 Under “People Centric” initiative of IR, following steps have been taken for improving the
cleanliness in trains as well as improving the quality of linen during the month.
a. Measure taken to improve the cleanliness in trains-
Contract for Clean train Station at KTE for eight trains has been awarded for a period of
2 yrs to Ultra Clean & Care Services Jabalpur & work has been started w.e.f. 30.10.14
On Board House Keeping Services in eight trains of WCR is operational. Out of theses
seven trains are of JBP division and one is of KTT division.
New contract for two years of Mechanised coach cleaning of coaches during primary
maintenance for JBP based trains has been awarded to M/s H.S. service provider ,
Sadar JBP on 22.08.14
4.2 137 additional coaches have been provided in various trains to reduce the long waiting
list in passenger trains.
4.3 07 trips of 02 special trains comprising of total 122 coaches have been maintained by
JBP division.
4.4 In train no. 22181/82 JBP-NZM Express, disposable pillow covers procured through
stores as NS items are being supplied to the passengers of 2nd & 3rd AC Coaches on
trail basis. Feedback of passengers are as Very Good 49.2%, Good 33.60% , Average
14.10% and unsatisfactory 03.10%.
4.5 During the month, 36 BOXNHL rakes were formed as CC rakes. The no. of NKJ based
CC rakes on 28.02.15 was 228.
4.6 Certification of rakes:
* 44 other base CC rakes were examined as flying rakes with ordinary BPC as per Rly
board instruction.
5. Performance of Diesel Sheds
5.1 Diesel loco outage (freight +coaching) during current month is 102.97 % of the target
i.e 8.44 more locos/ day than the target. The average outage (freight and coaching) for
the year 2014-15 of WCR is 102.32% of the target.
6.0 Progress of Model Rakes:
Supply of material for first rake was disrupted due to expiry of delivery period on
31.01.15. Vide COS/WCR MA No. 60007 dtd. 11.02.15, the delivery period has been
extended upto 10.04.15. Supply of material has again started on 28.02.15 and Luggage
Rack for GSCN, GS, SLRD & WCB Coaches has been received in this month.
Meanwhile, all the 24 coaches for first rake of Model Rake Project have been
nominated, which are being made ready with modification in shell and electrical wiring
etc.
M/s KIEL has submitted their request for extension of delivery period to COS/WCR.
CRWS/BPL opinion on the subject have been communicated vide CWM/CRWS office
letter no. CRWS/BPL/Model Rake/Refurbishing/2007/46/Pt.X dtd. 24.02.15. The formal
extension from COS office is still awaited.
Railway Board are requested to communicate the decision regarding final nomination
of trains for Model Rake Project (Vide this office letter no WCR/M/W/06/120 pt V dated
27.02.2015).
Against Budget Grant of Rs 1012.00 lakhs for 2014-15, funds utilized up to Jan’ 15 are
Rs 507.00 lakhs, which is 50.10% of Revised Grant .
Against Budget Grant of Rs. 2589.00lakhs for 2014-15,funds utilized up to Jan’15 are
Rs.2016.00 lakhs, which 77.87.% of Revised Grant .
[ Status of coaching items as per Railway Board letter No. 2007/M(C)/139/9 dated
30.04.10 is enclosed as ANNEXURE-IX.
9.0 Workshop Portal: WCR has regularly fed data of POH out-turn, RSP work, over due
POH, cycle time, unit cost, incentive performance, local passing and staff Strength in the
workshop portal.
12.1 A proposal for grant of 15% teaching allowance to the instructor of Welding Training
centre(RRWI),Bhopal has been sent to Railway board vide this office letter no.
WCR/M/W/06/602 dated 07.01.2014 and followed by reminder 20.02.15. Railway Board
are requested to communicate the sanction of teaching allowance at the earliest.
12.2 At the time of formation of CRWS/BPL in Aug 1989, FA&CAO/CR had concurred creation
of two posts for Elect. Organization.
1.Dy.CEE,
2. AWM Elect.
However Railway Board agreed for creation for only one post i.e AWM/Elect but post of
WM (Elect.) by readjustment in cadre by Electrical department was operated as junior
scale does not have power to deal tender cases in works matter.
At the time of inception of CRWS/BPL, it appears that MLR of AC coaches were not
planned. Since then the workshop have been expanded and infrastrure have been
created
now for out turn of 750 coaches per annum. At present we are turning 05 AC coaches
per month of all variants including RMPU coaches. Considering the present environment
it is necessary to improve the gazetted supervision over CRWS complex and the colony
etc spread over in 400 acre.
Accordingly Rly Board is requested to communicate the sanction of creation of one junior
scale post of AWM/Elect. (Ref-WCR/P-HQ/Gaz./creation /revenue post/Elect. Dated
19.11.2012.)
12.3 Proposal for replacing existing CLW pattern incentive scheme with Group Incentive
Scheme in Wagon Repair Shop KTT has been submitted to Railway Board vide this office
letter no.WCR/M/W/06/256 Pt-I dated 25.03.11 & followed by reminder of dated
07.03.2012. Sanction is awaited.
12.4 Administration of factory act, 1948 through Railway administration. A proposal has been
sent to AM (PU) vide this office letter no. WCR/M/W/06/914 dated 17.06.2013 and
followed by reminder dated:27.02.2015 and for Administration of factory act by Ministry of
Railway by incorporating suitable amendment to Indian Railway Act 1989 so that it
implemented by Zonal Railway/ PU’s or alternatively defining Railway as a state within the
preview of factory act ,1948. We have recommended for former option.
It is requested that the proposal may please be considered to its logical conclusion.
12.5 08 nos. WDP4 locos are required for proper mail express links .
Yours sincerely,
(P.C.Gupta)
BPL 0 0 0 -.
-
KTT 0 0 0
TOTAL 0 0 0 -
e.My lkbZV ij j[ks iqu% bLrseky fu"iknu gsrq fMLikst gsrq la[;k ejEer gsrq fu"iknu gsrq ekg ds
Div. dqy dkspksa dh ;ksX; dkspksa dh
la[;k tks ,d tks ,d ekg ,oa ihMhlh gsrq ihMhlh nkSjku ejEer
la- la- ekg ,oa vf/kd vf/kd le; ij fd, x,
Total No. of No. of coaches le; ij lkbZV lkbZV ij IkM+s PDC for PDC for dkspksa dh la-
coaches Salvageable ij IkM+s No. to be salvaging disposal of No.
lying at site (b) salvageable disposed awaiting of (d) salvaged
(a) but lying for at site but more (c) during the
less than 1 than 1 month month
month (d)
(c)
Non-
AC Non- AC AC Non- AC AC Non- AC AC Non- AC AC
AC
BPL 0 0 0 0 0 0 0 0 NA 0 0
JBP 0 0 0 0 0 0 0 0 NA 0 0
0 0 0 0 0 0 0 0 NA 0 0
KTT
TOTA
0 0 0 0 0 0 0 0 NA 0 0
L
vuqyXud &II
Annexure-II
(Figs. in Rs.000s)
Note: - Booking of PH-41&42 has been given as per FA&CAO office/WCR’s statement.
vuqyXud& III
Annexure- III
jktLo ekWaxksa ds [kpZ dh fLFkfr
EXPENDITURE POSITION OF REVENUE DEMANDS
(Figs. Rs.in Lakh)
chth fnlEcj ds var esa vf/kd@deh dk laf{kIr
dz-la okLrfod [kpZ
fdz;kdyki chbZ 14&15 14&15 chih B.P. to dkj.k
Sr. Actual Exp.
Activity BE 14-15 BG the end of Brief Reasons for
No. Dec’2014
2014-15 Dec’2014 Excess/Short fall
ekWax la[;k 5-C eksfVo ikoj dk vuqj{k.k ,oa ejEer
DEMAND No. 5-C REPAIR AND MAINTENANCE OF MOTIVE POWER
lanHkZ & vfrfjDr lnL;] ;kaf=d jsyos cksMZ dk fnukad 10-11-1998 i=kad 98@,
,e¼,e½@fujh{k.k
{Ref: Addl. Member (Mech), Railway Board’s letter no. 98/AM(M)/Inspection dated 10.11.1998}
eq[; foHkkx izeq[k rFkk foHkkx izeq[kksa }kjk fd;s x;s fujh{k.k
Ekkg ds nkSjku fd;s x;s fujh{k.kksa dh
dzz- la[;k
la- Iknuke
e.My dkj[kkuk vU;
1 eq[; ;kaf=d bath- - - -
2 eq[; dkj[kkuk bath - - -
3 eq[; py 'kfDr bath 4 0 -
4 eq[; py LVkWd bath 2 0 -
okLrfod fujh{k.kksa
visf{kr
dzz- dh l[a;k
fujh{k.k dk izdkj
la- ekg Ok"kZ esa Ok"kZ esa
Ekkg esa
esa lafpr lafpr
1 Mhty 'ksM 96 1004 99 877
2 dSfjst ,aM oSxu fMiks 162 1782 75 761
3. jsd fujh{k.k 81 891 65 769
4. QqVIysV fujh{k.k 48 528 27 327
5. QzsV yksM ij lqij psd 21 231 4 75
6. ,vkjVh@,vkj,ebZ 3 33 4 49
7. czsd Mkmu dzsu 6 66 1 15
8. jfuax :e 9 99 7 94
9. Q~;wfyax izfr"Bku 12 132 2 23
10. Dzw cqfdax@ykWch 15 165 8 105
11. izf'k{k.k Ldwy tsM
Vhlh@,lVhlh 7 77 * *
12. vU; dksbZ 0 0 5 103
Ikf”pe e/; jsy esa dksbZ izf'k{k.k Ldwy tsM Vhlh@,lVhlh ugha gSA
vuqyXud -V
Annexure- V
dkjiksjsV laj{kk ;kstuk dh fLFkfr STATUS OF CORPORATE SAFETY PLAN
o"kZ 14&15 gsrq ekg ds fy, fu"iknu ekg ds var rd fu"iknu fVIi.kh REMARKS
y{; PERFORMANCE PERFORMANCE
TARGET FOR THE MONTH UPTO THE MONTH
FOR 14-15
- 0 0 -
o"kZ 14&15 gsrq ekg ds fy, fu"iknu ekg ds var rd fu"iknu fVIi.kh REMARKS
y{; PERFORMANCE PERFORMANCE
TARGET FOR THE MONTH UPTO THE MONTH
FOR 14-15
- 0.922 0.576 -
o"kZ 14&15 gsrq ekg ds fy, fu"iknu ekg ds var rd fu"iknu fVIi.kh REMARKS
y{; PERFORMANCE PERFORMANCE UP
TARGET FOR THE MONTH TO THE MONTH
FOR 14-15
Total number of
- 5.26 5.47 incidences during the
month was 21
vuqyXud& VI Annexure- VI
bysDVªksfud bu eks”ku Hkkj lsrq dk fu"iknu
PERFORMANCE OF ELECTRONIC IN MOTION WEIGHBRIDGES
Ref: - Railway Board’s letter No: 2004/ DEV. CELL/ IDEI/ 2 dt 18.06.07.
dz- jsyos ls izkjaHk Hkjs bysDVªksfud bu eks’ku Hkkj lsrq ij otu fd, x, otu ugh
otu ugh fd, okLrfod
la jsdksa dh dqy la- jsdksa dh dqy la- fd, x,
x, oSxuksa dk n.MkRed
S. Total no. of No. of rakes weighed on Electronic js dksa dh la-
dkj.k dk;Zokgh
N. loaded rakes In motion weighbridge of No. of Reasons for Penalty
originated on iejs WCR Railway xSj jsyos rakes non- realized
the railway Non- not weighment
railway weighed
1 2 3 4 5 6 7 8
1 NKJ 18
2 Satna 9 Weighment
3 Kachhpura 3 done as per
4 Khanna banjari 6 requirement
5 Mehgaon 17 of
6 Beohari 4 Commercial
7 Gosalpur 0 department.
JBP-665
8
JQSG* 38
9 BSCW* 25
10 JBRT* 15
11 MSSG* 8 368
12 PCL* 32
13 Sakaria* 22
14 DDCE* 0
15 DDSG* 24
16 NNV 10
17 NWR 3
18
MPJM* 58
19
JPVN 0
20
RCPB 5
21 BPL-290 276
Itarsi 7
22
BRSN* 7
23 KTT-144 KTT 31 113
24 SWM 0
25 LKE 0
26 MCTS 0
*Private Weighbridge.
vuqyXud -VII
Annesure- VII
eaMy Division LFky@LVs’ku fVIi.kh Remarks Pkkyw gkyr esa ejEer gsrq os fczt
Location ¼orZeku ekg esa miyC/krk½
/Station Weigh Bridge in working
order (Availability in current
month)
fpfUgr fMiks@LFkku D;k foHkkxh; ;k {kerk izfr fufonk o ihMhlh dh orZeku fLFkfr
Identified Depots cwV ekWMy gS fnu Current status of tender & PDC
/ location Whether on Capacity
Departmental per day
or B.O.O.T.
model
JBP/ Mechanized 3 Ton Mechanised laundry is functional at
( Rly Premises) laundry at contractor premises. Setting up of
railway departmental laundry under GM’s power
premises. is under process and expected to be
commissioned by June-2015.
3. vkWu cksMZ lkQ&lQkbZ gsrq fufonk dh fLFkfr Status of tenders for On–Board
Housekeeping Services in trains:
fpfUgr xkfM+;ks ¼tksM+h½ dh dqy xkfM+;ks ¼tksM+h½ dh la[;k ftlds fy, fufonkvksa 'ks"k fVIi.kh] ;fn
la[;k Total No. of trains dks vafre :Ik fn;k tk pqdk gS No. of trains Balance dksbZ
(pairs) identified (pairs) for which tenders have been Remarks, if
finalized any
17 07
(1) 12181/82 Jabalpur - Jaipur
Express
(2) 11447/48 Shaktipunj Express 10 NIT for 09
(3) 12189/90 Mahakoshal Express trains of
(4) 1463/64/65/66 Somnath Express JBP(06
(5) 11449/50 JBP-JAT Express old+03New) is
(6) 12187/88 Garibrath Express published.
(7)12059/60 KTT-NZM Janshatabdi Tender is due
Express on 13.03.15.
4. dksp vixzsMs’ku vkSj e’khuhd`r lQkbZ ds lkFk okf.kfT;d izpkj&izlkj
Commercial publicity with coach up-gradation and mechanised cleaning:
fpfUgr xkfM+;kWa@jsd Identified ekg ds var rd iw.kZ dh xbZ fufonk Tender fVIi.kh Remarks
trains/rakes finalized up to the end of the month
xkM+h la Train no. jsd dh xkM+h jsd dh Bsds dh Okf"kZd
la- No la la No vof/k ykbZlasl Qhl
of Trai of Contrac izfr jsd
rakes n rakes t Annual
no. duration licensed
fee per
rake
1. 11463/64/65/66 4 Trains at S.N. 1, 2 & 3
2. 12155/56 2 have been taken over by
3. 11449/50 1 Commercial department
4. 12121/22 1 Nil Nil Nil Nil for publicity. Fixation of
5. 12191/92 2 reserve price for the
remaining 02 trains is
under process.
5. LoPN Vªsu LVs’ku Clean Train Stations (CTS):
ukfer Lakfonk Lakfonk vof/k PDC & status of tender if CTS not
lhVh,l dk;kZfUor DOC and commissioned/previous contract has expired
Nominated djus okyh contract
CTS ,tsalh period
Agency
executing
the contract
Itarsi - - Tender for new contract opened on 02.05.13.
tender discharged due to unreasonable rates.
Re-tendering due on 22.04.2015.
Katni M/s Ultra 10.10.2014 Work in progress
clean for two years.
6. dhM+s&edksM+s o pwgs fu;a=.k dh fLFkfr Status of pest and rodent control:
fMiks dh fMiks tgkWa vHkh Hkh Bsdk py jgk gS Depots where contracts are fMiks tgkWa vHkh
dqy la- operational Bsdk ugha py jgk
Total No. gS Depots
of depots where contracts
are not in place
& PDC
07 07 NIL
JBP & Rewa : Contract valid up to 22.11.2014.
Extension given up to March-15. LOA for new contract
issued.
BPL, HBJ, BINA &ET: Contract started on 01.11.2014.
KTT : Contract is valid upto 31.10.2017.
lhMhVh,l No of lhMhVh,l ;wfuV dh dqy okjaVh ds rgr okjaVh nkok [kjkc bdkbZ dks 'kq:
lqfo/kk coaches la- [kjkc bdkbZ dh fLFkfr djus gsrq ihMhlh
okys dkspksa with one or Total no of CDTS dh la- No Status PDC for
dh dqy more CDTS units of of commissioning
la- Total defective dk;Zjr [kjkc defective warrant of defective units
No. of units y claims
Functioning Defective
coaches under
with warranty
CDTS
05 NIL 17 NIL Nil Nil -
8. th,llh,u ,oa th,lhlh,u dkspksa ds yaccr mijh cFkZ dks gVkus dk dk;Z
11. Vªl ckj gSaxj dk ekxZ esa VwVuk En-route breakage of Truss Bar hangers: -
Ekkg ds nkSjku ,sls czsd vi izdj.k ¼LokfeRo ds vk/kkj ij ½ LVhy dh Js.kh
izdj.kksa dh la- Break up of cases (ownership Class of steel
Total No. of basis)
cases during Railway No. of cases Class I ------------ Nos.
the month Class III ---------- Nos.
SWR 00
WCR 00
ER 00
00 NCR 00 -
CR 00
ECOR 00
SR 00
12. dSjst ,aM oSxu ds dkj.k gqbZ le;ikyu gkfu ds ekeys Punctuality loss cases on
C&W account:
dz Ekkg ds nkSjku ekeyksa dh la-
la- No. of cases during the month
S. dkj.k Cause izR;{k vizR;{k Indirect
N. Direct Coach Wagon
account account
1. Roller bearing failure / Hot axle 0 0 0
2. Hanging parts / under gear defects 0 0 0
3. Brake system defects, wheel flats 2 6 2
4. Passenger complaints (Watering, 1 1 0
pest control etc.)
5. Train parting / Draw & Buffing gear 0 1 1
6. Misc. and others 1 0 0
Total 4 11
Grand Total 15
Upgradation and
` 8,58,59,125
Rehabilitation of
1. 776/PD/11- Departmentall
BOXN wagon 2011-12 100 WRS/KTT
12(884/10-11) y
using IRSM 44 Work Completed.
steel.
PO issued on 04.02.13 for 350
sets of prefabricated body
side/end arrangement with flap
806/12- doors to N.F. forging Horhaw.DP
Departmentall
2012-13 13(776/PD/11- 350 32,60,16842 WRS/KTT 15.09.13. Work started. Full
y
12,(884/10-11) quality received
Rebuilding of
2 BOXN wagons for 789/PD/11-12 Departmentall
CC+8/CC+ 10 2011-12 300 ` 14,05,13,657 WRS/KTT Work Completed
(1179/10-11) y