NOTE:

1. All dimensions are in millimeters unless


specified

EXISTING COLUMN
320 x 160 MM

EXISTING STONE CHAPPADI


SLABS ON THE VERANDAH
175 100 MM THK. RESTORATION OF
VERTICALLY PLACED 175 DODDAJALA
75 PLINTH LINE PROPOSED F.F.L 125 MM
STONE CHAPPADI ±00
BELOW THE EXISTING RAILWAY STATION
SINGLE LINE DRESSED
PLINTH LINE
75MM THK. -125
75

LEGEND
250

100 STONE MASONRY WALLS

CONDITIONS
AS PER SITE
-250

300 - 450
EXISTING CONSOLIDATED CONSOLIDATED SOIL
EXISTING COLUMN
320 x 160 MM SOIL

75 VERTICALLY PLACED
SINGLE LINE DRESSED

100
STONE CHAPPADI 75 MM NOTES:
THK.
P.C.C BED 100 MM THK. 1. One course of Chappadi of 300 -
450 MM deep along the edges of the
pillars to be placed vertically.

DETAIL AT B IN PLAN DETAIL AT A 2. Soil to be consolidated in the


verandah and the Chappadi stone
SCALE - 1:15 SCALE - 1:15 slabs to be resetted.

B 6227
-400.00 -600.00
A A'

5204 -35.00
WA3
-146.00
-12.00
2466

ROOM 2
1944

2958
-22.00
0.00

INTERVENTION
-58.00
-94.0 1758 D2 5202
D3

DRAWINGS
+8.00 4499 -19.00 -69.00
-6.00WA2 2462
-6.00

2093
-31.00

EXISTING STONE
+12.00
-1.00

COLUMN
+10.0

ROOM 1
WB1 DRAWING TITLE:
A
5545

5038
4527
4511

VERTICALLY PLACED PLINTH LINE SLOPE OUTWARDS


INTERVENTION DRAWING
-14.00

T1
SINGLE LINE DRESSED ±00 SOUTH VERANDAH
STONE CHAPPADI 75 -125
MM THK. ALONG THE VERANDAH STONE EDGING
+10.00

-58.00 1996
-356.00

-250
4487
+21.00 WA1 -4.00
D1
OUTER EDGE OF THE
-26.0 +53.0 0.00
VERANDAH.
5491

G.L.
DRAWING NO: NORTH
2116

VERANDAH

-69.00 -58.00 -50.00


-30.00
RRB_GFC_07
-123.00

N
B'
DATE: 09 NOV 2021
PLAN SECTION @ AA'
SCALE - 1:120 SCALE - 1:30

CONSULTANT:

INTACH
RESTORATION OF RAILWAY STATION BUILDINGS Bengaluru Chapter

You might also like