Professional Documents
Culture Documents
Doddajala - Intervention Stone Edging GFC - 09.11.2021
Doddajala - Intervention Stone Edging GFC - 09.11.2021
Doddajala - Intervention Stone Edging GFC - 09.11.2021
EXISTING COLUMN
320 x 160 MM
LEGEND
250
CONDITIONS
AS PER SITE
-250
300 - 450
EXISTING CONSOLIDATED CONSOLIDATED SOIL
EXISTING COLUMN
320 x 160 MM SOIL
75 VERTICALLY PLACED
SINGLE LINE DRESSED
100
STONE CHAPPADI 75 MM NOTES:
THK.
P.C.C BED 100 MM THK. 1. One course of Chappadi of 300 -
450 MM deep along the edges of the
pillars to be placed vertically.
B 6227
-400.00 -600.00
A A'
5204 -35.00
WA3
-146.00
-12.00
2466
ROOM 2
1944
2958
-22.00
0.00
INTERVENTION
-58.00
-94.0 1758 D2 5202
D3
DRAWINGS
+8.00 4499 -19.00 -69.00
-6.00WA2 2462
-6.00
2093
-31.00
EXISTING STONE
+12.00
-1.00
COLUMN
+10.0
ROOM 1
WB1 DRAWING TITLE:
A
5545
5038
4527
4511
T1
SINGLE LINE DRESSED ±00 SOUTH VERANDAH
STONE CHAPPADI 75 -125
MM THK. ALONG THE VERANDAH STONE EDGING
+10.00
-58.00 1996
-356.00
-250
4487
+21.00 WA1 -4.00
D1
OUTER EDGE OF THE
-26.0 +53.0 0.00
VERANDAH.
5491
G.L.
DRAWING NO: NORTH
2116
VERANDAH
N
B'
DATE: 09 NOV 2021
PLAN SECTION @ AA'
SCALE - 1:120 SCALE - 1:30
CONSULTANT:
INTACH
RESTORATION OF RAILWAY STATION BUILDINGS Bengaluru Chapter