Sponge Evaporation 4.0 (MESH)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Irvin Exequiel B.

Litao October 18, 2021

Title: BS 1/4 with MESH


Materials: 5 pcs 1/4 Thick
6 basins
Mesh Screen
Beaker
Graduated Cylinder
Salinometer
Objectives: To help the evaporation of pond/salt bed in PFI
Weather: 100% Cloudy
Procedure:
step 1- I start at 9:00 am up to 4pm
step 2- Prepare 6 empty basins
step 3- Put 150mL of brine(10be) on the basins
step 4- After putting the brine on the basins, put all the materials needed on the basins
step 5- Then every 20 mins, we need to pour the sponge by brine(basin 2, 3, 4, 5 and 6)
step 6- Repeat step 5 till 4pm
step 7- Then get the final volume and salinity of each basin with the help of Beaker, Graduated Cylinder and Salinomete

Result:

Column1 Column2 Column3 Column4 Column5 Column6 Column7


Initial Volume(mL) Final Volume(mL) Total Net Evaporation(mL)
Basin 150 105 45
1pc. 1/4 thick SH 150 90 60
1pc. 1/4 thick SH w/ mesh 100 150 125 25
1pc. 1/4 thick SH w/ mesh 150 150 125 25
1pc. 1/4 thick SH w/ mesh 30 150 105 45
1pc. 1/4 thick SH w/ mesh 60 150 110 40

Whats Next? Try the next step give by GCK


aduated Cylinder and Salinometer

Column8 Column9 Pouring time


otal Net Evaporation(mL) 9:20 AM
9:40 AM
10:00 AM
10:20 AM
10:40 AM
11:00 AM
11:20 AM
11:40 AM
1:20 PM
1:40 PM
2:00 PM
2:20 PM
2:40 PM
3:00 PM
3:20 PM
3:40 PM

You might also like