BUSINESS SCENARIO:
WHEN ONE MATERIAL HAS MORE THAN ONE SOURCE OF SUPPLY EACH SOURCE CAN BE
ALLOCATED TO A QUOTA ARRANGEMENT.QUOTA ARRANGEMENT HAS CERTAIN PERIOD
LIMIT.
- BY DEFAULT AFTER FIRST LOT QUOTA ARANGEMENT QUOTA GOES TO THE VENDOR
WITH LOWEST QUOTA RATING.
EXERCISE AS FOLLOWS:
CREATE ONE MATERIAL QUOTA1 AND MAINTAIN QUOTA USAGE IN PURCHASING AND MRP2
VIEW.
AND
AND MAINTAIN RE ORDE POINT IN MRP VIEW
PR,MRP,PRODUCTION OREDER
SAVE
QUOTA1 0
QUOTA2 0
QUOTA3 12.5
QUOTA1 8.3
QUOTA2 0
QUOTA3 12.5
NOW INCREASE THE RE ORDER LEVEL AND RUN MRP (MD03) TO GENERATE REQUISITION
SAVE
VENDOR QUOTA2 IS SELECTED BY THE SYSTEM BECAUSE ,THAT VENDOR IS HAVING LOWEST
QUOTA RATING BEFORE RUNNING MRP
QUOTA1 8.3
QUOTA2 40
QUOTA3 12.5
MD03
FIX THE VENDOR AND SAVE
QUOTA1 25
QUOTA2 40
QUOTA3 12.5
SCENARIO-1.MAXIMUM QTY
SAVE
MD03
FIX THE VENDOR AND SAVE
QUOTA1 41.6
QUOTA2 40
QUOTA3 12.5
INCREASE RE ORDER POINT AND RUN MRP MD03
SAVE
MD03
FIX THE VENDOR AND SAVE
QUOTA1 41.6
QUOTA2 60
QUOTA3 12.5
MEQ1
SAVE
MD03
TWO NEW REQUISITION GENERATED
HERE SYSTEM PICKS QUOTA1 BECAUSE IT IS HAVING LOWEST QUOTA AMONG QUOTA1 AND
QUOTA2.(QUOTA3 MAX QTY IS 100)
QUOTA1 50
QUOTA2 60
QUOTA3 12.5
NOTE ---- ANOTHER REQUISITION GENERATED BECAUSE WE GAVE MAX LOT SIZE FOR
VENDOR QUOTA1 IS 50.
QUOTA1 58.3
QUOTA2 60
QUOTA3 12.5
NOW IF YOU INCREASE RE ORDER POINT AND RUN MRP QUOTA GOES TO QUOTA1.
NOW LET US SAY MIN LOT SIZE FOR VENDOR QUOTA1 IS 25 MAINTAINED IN QUOTA ---
MEQ1
SAVE
SAVE
MEQ1
QUOTA RATING AS FOLLOWS
QUOTA1 62.5
QUOTA2 60
QUOTA3 12.5
MD03
QUOTA1 62.5
QUOTA2 65
QUOTA3 12.5
THE MAIN PURPOSE OF THE QUOTA BASE QTY IS TO CONTROL QTY FOR QUOTA
ARRANGEMENT
NOW IN ABOVE CASE YOU DO NOT WANT QUOTA TO ASSIGN TO VENDOR QUOTA1 EVEN
THOUGH IT HAS LOWEST QUOTA RATING,THEREFORE YOU ENTER BASE QTY AGAINST
QUOTA1 VENDOR.
SAVE
QUOTA1 (375+45)/6 = 70
QUOTA2 60
QUOTA3 12.5
NOW INCREASE THE RE ORDER POINT AND RUN MRP
SAVE
MD03
FIX THE VENDOR QUOTA2 AND SAVE
MEQ1
SAVE
QUOTA1 (375+45)/6 = 70
QUOTA2 85
QUOTA3 12.5
NOW ACCORDING QUOTA RATING VENDOR QUOTA1 WILL GET THE QUOTA FOR NEXT
REQUISITION (NOTE QUOTA3 IS SET FOR MAX QTY 100)
MD03
THE FIRST 50 QTY GOES TO VENDOR QUOTA1 AS PER LOWEST QUOTA RATING.FIX VENDOR
QUOTA1 AND SAVE.
NOTE--- TWO REQUISITION WILL GENERATE BECAUSE MAX LOT SIZE FOR VENDOR QUOTA1
IS 50.AND FOR REMAININING 5 QTY ,SYSTEM SOURCE THE VENDOR ACCORDING TO QUOTA
RATING, QUOTA RATING AFTER ALLOCATING 50 QTY TO VENDOR QUOTA1 AS FOLLOWS
QUOTA2 85
QUOTA3 12.5
BUT SYSTEM PICKS VENDOR QUOTA2 INSTEAD QUOTA1 BECAUSE WE SELECTED INDICATOR “
1X “ AGAINST VENDOR QUOTA1.
QUOTA2 86
QUOTA3 12.5
TWO) SYSTEM PICKS VENDOR AS PER QUOTA FILE AND QUOTA RATING.
3) QUOTA ARRANGEMENT IS PLANT LEVEL DATA