BET 3644

INFRASTRUCTURAL MANAGEMENT
SEM 2 2021/2022

ASSIGNMENT (20%)

Please read the instructions carefully

TASK 1 (Group assignment 10%)

Identify FIVE (5) construction project tenders. Then, tabulate the following information:

a) Name of the Project. i) Date on which the Tender Document


b) Name & Address of the Company sale commences.
floating the tender. j) Date and time up to which tender
c) Name of work, materials, or documents can be obtained.
services. k) The cost of tender documents.
d) Place of work location. l) The date and time up to which the
e) Approximate estimated cost of work. tenders are to be submitted and are
f) Earnest Money. to be opened.
g) Period of completion. m) Specification.
h) Date on which the Tender Document n) Eligibility Criterion.
sale commences. o) Type of tender
p) Type of contract

As this is a GROUP assignment, please work in as a group that was formed. Each team will be
responsible for contributing and working together. Use the peer-review form in Appendix I to
assess your teammates as part of the submission.
TASK 2 (Individual assignment 10%)

1. Tenders can be categorized into open/public tender, close/limited tender, and


competitive/direct negotiation tender. Elaborate on each type of tender. Then, suggest your
preferred type of tender. Provide TWO (2) reasons for your choice of type of tender.
(2 marks)

2. Contracts can be categorized into price-based, cost-based, and a combination of both.


Explain each type of contract category with an example of a type of contract. Then, suggest
your preferred type of contract. Provide THREE (3) reasons for your choice of type of
contract.
(3 marks)

3. Contract documentation includes the agreement, drawings, specifications, and contract


conditions. Define each contract documentation and provide an example for each contract
documentation. Then, suggest the most important contract documentation. Provide TWO (2)
reasons for your suggestion.
(2 marks)

4. Standard form contracts are agreements that employ standardized, non-negotiated


provisions, usually in pre-printed forms. These are sometimes referred to as 'boilerplate
contracts,' 'contracts of adhesion,' or 'take it or leave it' contracts. Provide THREE (3)
similarities and THREE (3) differences between the standard form contracts from JKR and
PAM. Then, suggest your preferred standard form contract. Provide TWO (2) reasons for
your choice.
(3 marks)

End of Assignment
Appendix

PEER EVALUATION

Rate each of your group’s members excluding yourself, on each of the items listed below as objectively as possible based on the
scale below. If questions are not applicable please write NA
1= Very little or very infrequently
2= Little or infrequently
3= Average
4= Above average
5= Very much or all of the time

NAME

1 SARAH SYAZWINA BINTI 5 5 5 5 5 5 30


ABDUL RAZAK
2
3
4
5

Evaluated by AMIRUL AIMAN BIN KAMARULAZMI AIMAN


Name Signature