Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

0

2,
23

05
0
0
77
1,

23
0
0
23

5,
12
0

12
0
94
00

,8
5,

60
,1
12

23
0
RAW
0

3,
23

00
0
23
0

11
0
47

5
3
52
3,

svp

110mm PVC soil pipe to fall at 1;60 towards municipal sewer


Ensuit

5
Master

11

1,
88
0

5
50
Bedroom

8
5,

23
40
23

0
2,
0
0

wh

02
5

13
23

1,
2
3,
30
in

4,

5
11
k
al e t

8
23

09
0

W clos

1,

0
80
Alfresco

3,
store

3
00
5

2
11

18

82
2,
W
5

1,

2,
BI room
5

135°

5
11

11
0
50

45°
4,

1,384 1,388
20

1,
1,
0

01
82

95
5

5
0

18

230
2,
vfld W
1,
6,

BI
98
55

BI

W
5
0

BI
W
23
0

0
2,

91
86

2,
4
4,
33
7

vfld
STUDY GST

4,230
135°
Bedroom
2,273
2,
40
0

vfld 5,189
115

4,000

230
S-x3 Toilet &
BIW

G
Bath

1,310
Bedroom
3,090

Loby
Passage

2,440
28,223

whb

PTD 2,100 S-x3

115
2,562
Toilet 1,120 505

785
1,025 svp
whb
6,200

520
115

230
rcbeam to eng's design
DR

Pantry
1,800

1,800
Loundry
1,510
W
2,975

115 1,000 115


Bedroom
W
BIW

rcbeam to eng's design


230
2,054 115 1,893 1,625
1,235
1,362

19,995
fld

kitchen
115
230

Step G
3,760

4,145
2,308

RAW
230

115

rcbeam to eng's design


6,460

6,000
1,396

Sunken
936

2,565
972 0

family lounge 1hr fire rated door


150mm thresh hold
230

880
Dining
3,912
Step
2,296

230 wall to underside


230

roof
4,560
1,240

Walls to be build under


side roof cover
2,273
3,473

entry porch
300

600 rcbeam to eng's design 600


2,933
1,703

697
230
716
230

230

230

920

GSPublisherVersion 0.0.100.100

You might also like