Download as pdf
Download as pdf
You are on page 1of 7
[Bae sarees GULF APPROVAL Ft 71 Ghent Name & Across Tahar Co. a2 Pgeet are nd rea aTon oT Ftlong Stace oe a ST festortroconiact Rar GF 1azTze He Toate I Sates Person: TE R202 ales & Harketing Depart Preparing 123A SRERETO) asaine GSIOTADRITTR02@ 001-07 [102 Fabre Approval PucIace stow KF 21722912 [108 Stel Color Approval wi submt ltr [22 contact # : 104 comments E 3 Contract Amount 139,200KD [105 Estimated cost ; 0.4 Contract oat 70 DAYS fa Gaationavaton| spas [rn iraonnhanna [Snare & Date i by Head of Salus & Maran jawed 234580870 conan Wane [Sonate Dae Reviewed by 05 Daparine viawed idand reviewed the Gost 105 bape! on __[Relose ning PIS lovenes ne Jc Qs Coceeh [Comments ia Vins aaa BD ap eh [Pecan conracniro | [Arorova tora opening (Comments eS Te Weyl, 2-B12-4 - fie 3 [Sgnatuwe & Date I sate xe ee Reviewed by Accounts (Roviewed dando Received LPOtcontract —_[uotation attached [Received Advance payment [Comments biwelly pi Hace LPO Name Cluward ke vues, [Sioatue & Date waar, all - Final Job card wT By GS doparimen fr wad Tomboy _*WTesc0e [et card uate [}eozracee [eormente ane Tie “eecohtanna [Sioa & Dato [Note This documents for mentioned persons only and classified Page 1 oF i apn 4 cute Dar cco er PROJECT INFORMATION SHEET PIS 1 Chen Ra TATE adress FDBOK 238 Slat SOE RAE 1. Contact Bao gE Postion: [ee pee tat [Wbo- oso [ema ses 1 Projet ame SLBA aton Fg Schr forHal n Shans esta Prefect Loesion Shunsshinrs amat ser ox HAE sain TESA “.aGIN Rer —— [GHOTNRWTeee01 07 Joare — [eon Itoi ner pare 1 sinters a Ee 7.10 1Fo cad OW. es {ow ne) a Ti Approved Concept Owe. aac an ayt 1.42 Sructuetane tengt» | watn | nome | ary | eaye | arn Pema Pane ade esse a Fr Beape Tana aioe Sao Tain bnes 0 Tennent eee get (aes aren WG SO) as Fre OT cena En One Elst ann vt an ane nae 22reneatons —[Elartapaon am iene meer [Grove at reer iresoeseen | Gries] [Clore Ti Fareson Asa TDiawnen rama 23.86 requires (Faerie bce curs bean Cease Za Faerie TA Ta 255 Fabric col WHITE: 208 Steal grade BS_TABE Chas A TARTU ST 27 Steal ih ad late + Epon Paris Zapantaysion 2a Paint color Tobeagees (WatueButing a0 KPH ASCE 7-10) ‘yroetegory t 211 Drawing REF "aS aa ngiearing esas 232800 REF wiv ard engineering dosatmerde 2:13 Waranles | Woranaip you Weanchio ar work comelaton by Ga SR Fabre 10 yrs a por marfits, fe-Paint System yeas ZS Condon ET Te — Ta loos ane “carat ssa Hk wii pore ai sang wd GS wT aT facuipments ‘Gent o_o “aes ve naa or sab ard elo rn GS cope WA. oo Pagerery| SSCTNRWT 70 OTOT PROJECT INFORMATION SHEET PIS “40% from design calculation approved , sample and signing contract “40% from approve material derlievery 20% from approved our steel and fabric erection Jjoseph hanna Date: 24/02/2022 Date: 24 Feb, 2022 Ref: KKC/2022/02/023 To: Dear Gulf Shade Eng. Joseph As per your quotation, GS/QTN/KWT2022-001-07, we want to inform you the followings: 1) We approve the price of (PVC 1302) with lumsum price (139,200 KD) for the proposed area (140m x 20.6m), * Period of work 1 week for design, and 45 days for supply materials after approval and ‘advance payment, and 21 to 30 days for installation. * Chemical anchors bolts included. * Measurement for current site included + Payments: \v~ 40% after approval of design, samples, and signing the contract. 40% after supply materials. 1 20% after installation Quire au + The contract wil be ready fo sign within two weeks. Thanks and best Regards, Eng. woop sap ‘Rowat Gy A bia ea FapegASton St an Care Fon (27 10 Boe 2358 Cao To 226704R) T2401. Par wez2 Pax 20 TOAE Cole SHADE | GULF SHAD | | | Proposal Presented To EKutibai Co, Kuwait Engr. Hassan Mohsen ~ Special Projects Manager (+965) 66081027 8 hassan@alkuthban.com {Quotation For: Supply and instalation of Fablong Structure for Halli Shuwalkh industrial (Gs/0Th/KW72022-001-07 Proposal Presented By 2 Gul Sha P.0 Box: 1722, Hawali 30218-Tunisie Steet Plot ‘Mr. Joseph Hanna: Projects Manager fiw” lock (+965) sozsi916 [EE] esrayarzara76 joseph MannaG@pulshade.cos 23/02/2022 POBox 2118 214365 90291914 | E-mail iosephnHanna@gullshade.com | REF GS/QIN/KWT2022-001.07, county Kuwait 1 tae 4973.17 7372761 wopsita wens: gullshade.com Poe of 2 Cleave SHADE PROPOSAL Dear Si, We have pleasure in forwarding our best quotation for the Tensile fabric system forthe above-mentioned project, for your kind perusal as follows: - Structure Name Fabiong (PVC 1303), ‘Structure Sihouette ‘Structure Dimensions Length ‘Width [Height [av Bay ‘Area Le 205m 340m | St06m | _1Nos. 2 | 2570" Total Price of PvC1z02 | KO. 139,200.00 Kuwaiti Dinars. One hundred thirty-nine thousand two hundred Only Total Price of PTFE 18689 _ | KD. 169,500.00 Kuwaiti Dinars. One Hundred Sity Nine Thousand Five Hundred Only. notes: ‘+ The price is subject to change according tothe site condition, ste dimensions/measurements, IFC drawings, final design Arawings, Fabric, avllatility in stock, materials prices in market/suppliers, and for any other changes nat mentioned inthe quotation Further Specifications include: Scope Of Work | Supp divx staliaon of wl nb, nd aceiori | Engnering Conc, Shop rawings and Engiesing Designing and epor Fabrication abc and Seal ines 1 Fabre 1b & Colour VC1303 or PE 8685 Stee - 85136785 Cas A-/ASTMIASS Stee Fah Sandblsting + Epon Pot Wind oad iASCE7-0) Gull Shade Scope of work:= ‘Engineering: The design ofthe Shade structure as per the above layout & contiguration, ‘Steel: The supply and fx of al Stee! members and other accessories needed forthe main structure as per Gulf Shade in-house approved design & engineering. ‘+ Fabric: The supply and fix af the shade fabrie needed for main structure 38 per Gulf Shade in-house approved design & engineering, ‘+ Accessories: The supply and fixreinforcement accessories such as cables, clams, plates and others as per Gulf Shade in-house approved design & engineering. ‘© Fiaishing: The painting and finishing work of the structure as per Gulf Shade in-house approved designs & engineerin. 5 /OTN/KWT2022-001-07 ge Lolz POBoxIIIs | Tel 496550201914 | Emal joseph county: Kunrait | fax 0973 17 737276! Hanna@gullshadecom | vite wow gulshade.com cur 77> SHADE Payment terms:- © Tobe agreed Price Exclusions: - '* Givi works, Foundations, Chemical Anchor Bolts, Concrete design. ‘+ Scaffolding, Manlit, Cranes are excluded. ‘© Storage at Site, Security at Site, Site access ‘+ Foam padding for columns, Electrical prevsions and lighting, Canopy lights, wheel stopper, Electrical opening, Road Marking ‘© Tapered shapes. + Coordination with consultant and other parties in which client is directly able to. Providing as-built measurements for current ite conditions Site tice and mobilization ‘+ Anyother tem whieh is not mentioned in our offer. Warranties: ‘+ year Workmanship after work completion by Gulf Shade, ‘+ so years Fabrie Warranty as per manufacturer. = 2years Paint System warranty as per supplier. ‘Quotation validity: - ‘+ In view of the volatile row material prices, our offer is valid for 7days from the date of Submission of offer, further validity shall be subject to our written confirmation of the same ‘Generol Terms and Conditions: ‘+ All Gulf Shade General Terms and Conditions are applied, See ere rere errr vows th, eth cng op ene Projects Manager Tel: 50291914 POSox2118 | Tel+96550201914 | C-nall josephManna@gulishadecom | REF GS/QTN/KWT2O22.001.07 county: kuvait 1 Fax 1973 17 7372761 website wavequilshade.com Page 2 of 2

You might also like