0.

2 m3/min , 5-8 bar

40 m3/h , 4.5 bar


0-250 L/h , 3 bar

3-6"-AA1 2-4"-AA1

two Electrical pump 100


100m3/h , 2bar m3/h , H=20m 1-6"-AA1 oily water from
one working and Evaporation pond
second spare

99 m3/h , 0.2 bar 4-6"-AA1

3-4"-AA1
Electrical pump 100
m3/h , H=40m

1 m3/h , 0.1 bar


To the river

MOE Responsibility
Jorsun Responsibility
underground underground
concrete water tank concrete oil tank
5x5x1.5 3x3x1.5