This weekly report summarizes the painting of various equipment at Super Petrochemical Limited between January 2021 and January 2022. It lists 16 items that were painted, including tank T-111, tank T-112, and vessels V-002, V-005, and V-107. For each item, it records the surface preparation standards used, the primer, midcoat, and topcoat paint types applied, and the dry film thickness (DFT) measurements for each layer. It also notes the crew and inspectors for each job and whether the work was completed, ongoing, or scheduled.
This weekly report summarizes the painting of various equipment at Super Petrochemical Limited between January 2021 and January 2022. It lists 16 items that were painted, including tank T-111, tank T-112, and vessels V-002, V-005, and V-107. For each item, it records the surface preparation standards used, the primer, midcoat, and topcoat paint types applied, and the dry film thickness (DFT) measurements for each layer. It also notes the crew and inspectors for each job and whether the work was completed, ongoing, or scheduled.
Original Description:
Original Title
8. Weekly Paint Report From 10.01.2021 to 21.01.2021
This weekly report summarizes the painting of various equipment at Super Petrochemical Limited between January 2021 and January 2022. It lists 16 items that were painted, including tank T-111, tank T-112, and vessels V-002, V-005, and V-107. For each item, it records the surface preparation standards used, the primer, midcoat, and topcoat paint types applied, and the dry film thickness (DFT) measurements for each layer. It also notes the crew and inspectors for each job and whether the work was completed, ongoing, or scheduled.
This weekly report summarizes the painting of various equipment at Super Petrochemical Limited between January 2021 and January 2022. It lists 16 items that were painted, including tank T-111, tank T-112, and vessels V-002, V-005, and V-107. For each item, it records the surface preparation standards used, the primer, midcoat, and topcoat paint types applied, and the dry film thickness (DFT) measurements for each layer. It also notes the crew and inspectors for each job and whether the work was completed, ongoing, or scheduled.
Dangarchar, Charlakshya, Karnafuli, Chattogram SSPC-SP2- Hand Tool Cleaning
Inspection & Safety Department SSPC-SP3- Power Tool Cleaning Weekly Based Painting Report SSPC-SP6-Commercial Blast Cleaning PM-Protectomastic, PU-Polyurethane Report No.8 Date : 1-Jul-21 EZP-Epoxy Zinc phosphate, ERO-Epoxy Red Oxide, E-Epoxy Surface Paint Type DFT(Micron) Sl. Date Equipment Location Preparation Conducted By Inspected By Remarks Standards Primer Mid Coat Finish Coat Primer Mid Coat Finish Coat 1 3/1/2021 T-111(S) SSPC-SP2 PM PU PU 75 45 55 Western Marine Deloar Completed 2 3/1/2021 T-111(R) SSPC-SP2 PM PU PU 70 Western Marine Deloar On Going 3 4/1/2021 T-112(S) SSPC-SP2 PM PU PU 75 55 50 Western Marine Deloar Completed 4 4/1/2021 T-112(R) SSPC-SP2 PM PU PU 75 Western Marine Deloar On Going 5 5/1/2021 T-113(S) SSPC-SP2 PM PU PU 80 50 50 Western Marine Deloar Completed 6 6/1/2021 T-113(R) SSPC-SP2 PM PU PU 70 Western Marine Deloar On Going 7 12/1/2021 T-114(S) SSPC-SP2 PM PU PU 75 55 Western Marine Deloar On Going 8 12/1/2021 T-115(S) SSPC-SP2 PM PU PU 70 50 Western Marine Deloar On Going 9 13/1/2022 T-117(S) SSPC-SP2 PM PU PU 70 Western Marine Deloar On Going 10 9/1/2021 T-117(R) SSPC-SP2 PM PU PU 70 50 Western Marine Deloar On Going 11 11/1/2021 T-116(R) SSPC-SP2 PM PU PU 75 Western Marine Deloar On Going 12 11/1/2021 T-118(S) SSPC-SP2 PM PU PU 70 Western Marine Deloar On Going 13 9/1/2021 T-118(R) SSPC-SP2 PM PU PU 75 Western Marine Deloar On Going 14 11/1/2021 V-002 SSPC-SP2 EZP E E 122 Akram Deloar Completed 15 12/1/2021 V-005 support SSPC-SP2 EZP E E 120 Akram Deloar Completed 16 12/1/2021 V-107 support SSPC-SP2 EZP E E 125 Akram Deloar Completed