Month to Date Year to Date

MTD May 2022 YTD as at 15 May 2022


Variance Variance
Actual Budget Variance Variance Actual Budget
(units) (%)
(units) (%)
Tonnes Mined t 8,148 7,935 213 2.7% 22,986 24,765 -1,779 -7.2%
Tonnes Milled t 6,671 7,813 -1,142 -14.6% 15,963 23,383 -7,420 -31.7%
TUF grade g/t 2.86 3.20 -0.34 -10.6% 2.91 3.20 -0.29 -9.1%
Recovery % 84.0% 82.0% 0.02 2.5% 84.86% 82% 0.02 2.5%
Gold Produced - indicated kg 16.03 20.50 -4.47 -21.8% 38.66 61.36 - 22.69 -37.0%
Gold Produced - indicated Oz 515 659 -143.82 -21.8% 1,243.01 2,075.41 - 832.40 -40.1%

MAY MONTH TO DATE COMMENTS .

1. Tonnes mined : - Above budget for the month


2. TUF grade for the month was 11% Below budget for the month
3. Milled tonnage for the month was below call mainly due to Mill 2 motor blown out 135hrs and ZESA Power outage 18.42hrs.
4. Recovery was 2.5% above budget for the month to-date.
5.Indicated gold is 21.8 % below budget due to below call milled tonnage and grade delivered .