2. TUF grade for the month was 11% Below budget for the month 3. Milled tonnage for the month was below call mainly due to Mill 2 motor blown out 135hrs and ZESA Power outage 18.42hrs. 4. Recovery was 2.5% above budget for the month to-date. 5.Indicated gold is 21.8 % below budget due to below call milled tonnage and grade delivered .