Sap Project Details
Sap Project Details
Bueiness priority
resouce availability
complexity
relative effort
2 How would you describe the realize phase in the new implementation of SAP s4hanaa
Transtion path
configure and develp
configuration copy
configure
configure and adjust custome code
2 3 which of the follwing are example of ready to run sap s4hana system ?
sap best pratices explorer
sap model company
fully activated applicance
sap mission control center
4 how often will and upgrade be performed on an sap s4hana cloud singe tenant edition environemnt?
schedule is defined by service level agreement for sap hana enterpricse cloud and sap s4hana cloud sing
every year
one upgrade and two feature pcks per year
every quarter
5 working in an agile approach what should your planning look like at the beginning of realise phase ?
timeline of th sprint may differ due to the workload
project scople and planning are complete and final
user stories are in a ready state for NO more than the fist three sprint
go live scope is fixed on the fist of january the following year
3a 6 what is the purpose of the solution validation activity on the explore phase?
challenges changes to standard
log additional scope items
verify technical installation
identify gaps
educate project participants
7 Which of the following are benefits of using ready to use content ? (2C)
Run SAP like a factory
predictable results
fast time to value
minimized total cost of ownership
8 What term is used for a ready to run sap s4hana system with prebuilt solution documentation which sup
fully activated appliance
sap cloud appliance library
best practice system
SAP model company
9 what is the most granular level of the methodology you can view in SAP roadmap viewer?
scenario
phase
task
deliverables
11 which of the following tools are specific to the data management workstream?
SAP solution manager
sap landscape transformation
sap data services
sap roadmap viewer
sap s4hana migration cockpit ( for both sap s4hana cloud and sap s4hana edition)
12 What are the two important approaches based on the control center concept that sap proposes to use fo
1
2
3
4
13 Which of the following are levels in the structure of an SAP best practices solution package? ( 2 answers)
1
2
3
4
17 When does the scrum team receive formal confirmation that the user storeis are completed to the satisfi
1
2
3
4
18 In SAP activate what tool is used in the agile delivery approach during the realize phase to make forecast
1
2
3
4
20 what techniques helps a scrum team to prioritize a large flat back log? ( C1)
1
2
3
4
21 why is there no sandbox system in the new implementation of SAP s4hana cloud / single tennat edition
1
2
3
4
22 Which satatement are part of 5 golden rules for SAP S4HAN SING TEN EDI? ( 2 c)
1
2
3
4
23 Which of the following are the components of SAP model company (3c)
1
2
3
4
25 Which E2E Turn key application LC mgt solution can support you inmanaging requirements and software
1
2
3
4
26 Which new project roles are introudcued with SAP activate methodology for the agile delivery approch(
1
2
3
4
27 Via which media does SAP provide ready to run system for SAP s4hana deployments (2C)
1
2
3
4
28 Which collaboration features can SAP jam user access in the SAP methodolgies Jam GROUP(2c)
1
2
3
4
29 what tool would you use for managing project task and solution doucmentation when implementing SAP
1
2
3
4
30 What tool provides guidance on replacing custom code development for SAP ERP with SAP s4hana funtio
1
2
3
4
31 What accelarator can help you document the configuration defnition in the explore phase(1c)
1
2
3
4
32 which artifacts are part of the solution adoption worskstream ?( 3c)
1
2
3
4
5
33 Which artifacts are created within application design and configuration workstream in the explore phase
1
2
3
4
5
34 Which artifacts in the testing work stream are created within the realise phase for the new implantation
1
2
3
4
35 What are some of the key topics covererd in the customer team enablement workstream ( 3C)
1
2
3
4
5
36 What is the best target deployment option of SAP S4HANA for the sytem conversion transition path ( 1C
1
2
3
4
37 What are the responsibilites of the product owner in release and sprint planning (2C)
1
2
3
4
38 What tool provides sizing estimations for the system conversion transition path (1C)
1
2
3
4
39 In which phase should you run the sap readiness check for sap s4hana selective data transition , transitio
1
2
3
4
40 In which phase the customer develop the preliminary strategy for building a target operations and suppo
1
2
3
4
41 Which new role is introduced in the sap activate methodolgiey in the full scrum team (1C)
1
2
3
4
43 In the new implementation of SAP s4hana transition path, which systems are part of the project system
1
2
3
4
46 How would you describe the explore phase in the new implementation of SAP s4hana cloud transitiion p
1
2
3
4
48 Ready to use content in SAP activate includes which of the following? (2C)
1
2
3
4
49 Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
1
2
3
4
50 How do you achieve frequent checkpoint with the end user in an agile delivery approch ( 2C)
1
2
3
4
51 What tool is used to authorize changes between SAP ERP and SAP S/4 Hana manitenance tracks?
1
2
3
4
52 Which of the following content best outlines the sequence of testing within the application design and c
1
2
3
1
2
3
1
2
3
1
2
3
53 What is the difference between the new implementation of SAP S/4 Hana cloud and the new implement
1
2
3
4
54 Which value chains does SAP solution manager 7.2 deliver? (3C)
1
2
3
4
5
55 Which of the following belong to the application design and configuration workstream for SAP S4HANA c
1
2
3
4
56 which avtivity helps the project team and user storeis to the pdoduct backlog? (1c)
1
2
3
4
58 in which plahse do you verify that the sap best practices contenst meets the customer is business nessds
Explore
deploy
realize
59 according to the definitoin of done which hactivity must be completed for each sprint?
End user training musht be delivered
functionality must be released to the business
the solution must be built and coniguraiton in the development system DEV
Funtionality must be tested in the quality system
61 which accelerates support the Fit TO standard workshop in the explore phase?
62 which estimation technique can be used in agile delivery approach to size the user stories during sprint p
Detailed buttom up effor estimate by the scrum master in story point based on the user story complexit
product owners relative estimates of the effort that will be needed to implement the user story
relative estimate in ideal person days that reflects the best estimated provided by the project team
Detailed bottoms up effort estimate that break each user story up into hours or shorter tasks
63 What is the basis for approving work results ( signing act of acceptance ) on a project phase level?
Agree and met acceptance criteria within quality gate
scrum of scrum meeting decision
definitiokn of ready for sprint
definiton of done for user story
64 which of the following is part of the explore phase in the new implementation of sap s4hana cloud trans
simpificaiton and custom code impact anlysis
fit to standard
setup and enablement
solution validation and delta design
65 How does the provisioning of SAP s4hana Cloud differ from the setup of sap s4hana ?
there is a present phase for q system which is unique for SAP s4hana cloud
sap s4haan system takes lesstime to provision than sap s4hana cloud system
to start a solution validation workshop a DEV system is availbale for SAP S4HAAN while a starter system
In SAP S4HANA deconmmissioning / shutdown of the starter system is intiated automatically after the P
67 which of the folowing will help you avoid modification of standard funtionality in SAP s4hana cloud singl
The side by side extensibility option such as SAP cloud platform
contact restrictions in sap s4hanaa enterprise cloud and SAP s4hanan CLOUD SINGLE TENANT EDITION
The 5 golder rules
SAP code inspector
A developer key
68 what is the order of artifacts within the technical architecture and infrastruture workstream in the prepa
Technical strategy - hardware specification from hardware vendor - parameter hardware sizing calculatio
Technical strategy - parameter hardware siging clculation -hardware szing results-hardware specification
Parameter hardware sizing calculation - technical strategy - hardware sizing results - hardware specificati
Parameter hardware sizing calculation - hardware sizing results - hardware specification from hardware
69 in which phase should you create a data migration strtegy ( LO) during a selective data transition ?
Discover
realize
explore
deploy
70 in which phase do you create an ordered list of everything that is known to be need in the product ?
deploy
explore
prepare
realize
73 what is the term used for workshops which are intended to set value targets validate SAP standard funti
Solution validation
design thinking
fit to standard
delta design
74 what solution opearation famework can customers use to create a join business and IT organizaation tha
SAP operation control center
customer center of expertise
business transformation magangement methodlogy
sap activate
76 which tool can you use to collaborate with other SAP activate methodology practitioners?
SAP implementation assistant
SAP jam
Sap solution manager
Sap roadmap viewer
77 who determines the tasks that are required to complete the cmmitted backlog items in a sprint
scrum master
project manager
project team
product owner
78 what information does the project team need beofre they can correctly estimate the relative size of back
Test strategy
available project resources
overall project schedule
defintion of done
79 what are some of the key characteristics of the implementation approach in SAP activate methodology?
Based on ready to use content
cooud ready
on premise only
fixed scope
delta based
How would you describe the realize phase in the new implementation of SAP s4hanaa
Transtion path
configure and develp
configuration copy
which of the follwing are example of ready to run sap s4hana system ?
sap best pratices explorer
sap model company
fully activated applicance
sap mission control center
how often will and upgrade be performed on an sap s4hana cloud singe tenant edition environemnt?
schedule is defined by service level agreement for sap hana enterpricse cloud and sap s4hana cloud single tenanant edition sercice
every year
one upgrade and two feature pcks per year
every quarter
working in an agile approach what should your planning look like at the beginning of realise phase ?
timeline of th sprint may differ due to the workload
project scople and planning are complete and final
user stories are in a ready state for NO more than the fist three sprint
go live scope is fixed on the fist of january the following year
what is the purpose of the solution validation activity on the explore phase?
challenges changes to standard
log additional scope items
verify technical installation
identify gaps
educate project participants
Which of the following are benefits of using ready to use content ? (2C)
Run SAP like a factory
predictable results
fast time to value
minimized total cost of ownership
What term is used for a ready to run sap s4hana system with prebuilt solution documentation which supports end to end processes for a
fully activated appliance
sap cloud appliance library
best practice system
SAP model company
what is the most granular level of the methodology you can view in SAP roadmap viewer?
deliverables
which of the following tools are specific to the data management workstream?
SAP solution manager
sap landscape transformation
sap data services
sap roadmap viewer
sap s4hana migration cockpit ( for both sap s4hana cloud and sap s4hana edition)
What are the two important approaches based on the control center concept that sap proposes to use for streamlines implementation a
Run SAP like a factory
Build sap like a factory
Intelligent Enterprice
Always Connected
Which of the following are levels in the structure of an SAP best practices solution package? ( 2 answers)
Scope items
building blocks
configuration guides
business process scenearios
When does the scrum team receive formal confirmation that the user storeis are completed to the satisficaiton of the product owner? ( C
During the sprint review
during the UAT
During the daily scrum meeting
During the sprint retrospective
In SAP activate what tool is used in the agile delivery approach during the realize phase to make forecast based on actual data? ( c 1)
release plan
product implement
project plan
burn down chart
what techniques helps a scrum team to prioritize a large flat back log? ( C1)
Fit / GAP analysis
Planning poker
user story mapping
retrospective
why is there no sandbox system in the new implementation of SAP s4hana cloud / single tennat edition transition path ? ( 1 C)
Because the project team uses the DEV system to confirm solution FI and define Delta requirements
Because SAP s4hana cloud singel tenant edition , contains predefined business proceses which should not be changed
Becase the FIT to statndard workshop is conducted using Q- system
Because the custome may use the sap model company
Which satatement are part of 5 golden rules for SAP S4HAN SING TEN EDI? ( 2 c)
Foster a cloud mindset and adherence to the fit to standard approcah
document deviation from golden rule for tansparency and future use in upgrade
use SAP solution manager 7.2 which focused build
stick to the security standard of the customer organization
Which of the following are the components of SAP model company (3c)
Business Process content for SAP solution manager
Pre configured solution business driven config questionnaire
quality gate checklist
Accelarators
Which E2E Turn key application LC mgt solution can support you inmanaging requirements and software devlopment for large agile proj
CR management
Solution manager Test suite
Focused Build
Requirement management
Which new project roles are introudcued with SAP activate methodology for the agile delivery approch(2 c)
Scrum master
Product owner
Design thinking coach
Integration lead
Via which media does SAP provide ready to run system for SAP s4hana deployments (2C)
Blue - ray discs
Sap app center
SAP solutin builder tool
SAP appliance librarty
Which collaboration features can SAP jam user access in the SAP methodolgies Jam GROUP(2c)
Tweet questions
Update Key deliverable wikis
comment on key deliverables
Ask questions
what tool would you use for managing project task and solution doucmentation when implementing SAP S4HANA cloud (1c)
SAP road map viewer
Implementation portal for SAP S4HANA cloud
SAP transformation navigator
Sap support Market Phase
What tool provides guidance on replacing custom code development for SAP ERP with SAP s4hana funtionalities for the system conversio
Sap Code inspector
Software update manager with data base migration option
simplification item check
Software provsioning manager
What accelarator can help you document the configuration defnition in the explore phase(1c)
Data definition
CR template
Backlog Template
Test Strategy
which artifacts are part of the solution adoption worskstream ?( 3c)
System go live announcement ( order)
Detailed Design business process
Project Plan
Business transformation review ( Pint of view )
Project business case
Which artifacts are created within application design and configuration workstream in the explore phase of the new implementation of S
Detailed design - business process
Organization structure specification
Delta requirement list - register
Roles and authorization management concept
project procedure mockup modeling
Which artifacts in the testing work stream are created within the realise phase for the new implantation of SAP S4HANA Cloud transition
Fuctional specifications
Reporting functional specifications
Functional test scenarios
UAT - Plan
What are some of the key topics covererd in the customer team enablement workstream ( 3C)
Solution expertise
project sourcing approcah
technical experetise
project management
planning skills
What is the best target deployment option of SAP S4HANA for the sytem conversion transition path ( 1C)
Sap C4HANA
Sap s4hana cloud
hybrid - saps4hana clound and sap s4hana
Sap s4hana
What are the responsibilites of the product owner in release and sprint planning (2C)
Priortize backlog user stories by business priorities
analyse the functional the technical dependencies between user stories
eliminate the backlog user stories
define objective for each release
What tool provides sizing estimations for the system conversion transition path (1C)
SAP best practices explorer
Sap transformation navigator
sap readiness check
scope and effort analyzer
In which phase should you run the sap readiness check for sap s4hana selective data transition , transition path,in a system conssolitaion
Explore
Realise
Discover
Prepare
In which phase the customer develop the preliminary strategy for building a target operations and support organization model? - no ans
prepare phase
explore phase
run phase
discover phase
Which new role is introduced in the sap activate methodolgiey in the full scrum team (1C)
System administrator
Appplication consultant
product owner
project manager
In the new implementation of SAP s4hana transition path, which systems are part of the project system landscape (2C)
DEV
P system
Qas
Starter system
How would you describe the explore phase in the new implementation of SAP s4hana cloud transitiion path?( 1C)
Fit to standard
Step up and enablement
Simplification and custom code impact analysis
Solution validation and delta design
Ready to use content in SAP activate includes which of the following? (2C)
Project acceleratiors
SAP best practices
courses delivered by SAP education
Business models from leading companies in each industry sector
Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
Plan one phse at a time
use standard funtionality optionally
acchieve production readiness
start scoping early
How do you achieve frequent checkpoint with the end user in an agile delivery approch ( 2C)
UAT
Solution demo for sprints
demo the model company
solution review for waves
What tool is used to authorize changes between SAP ERP and SAP S/4 Hana manitenance tracks?
Businesss process change analyzer
SAP code inspector
Sap code vulnerability analyzer
Retrofit
Which of the following content best outlines the sequence of testing within the application design and confguration workstream in the r
Starting test
UAT
Integration Test
Data migration
String test
UAT
Integration test
UAT
String Test
String Test
Integration test
UAT
What is the difference between the new implementation of SAP S/4 Hana cloud and the new implementation of SAP S4HANA transition
Different sets of Workstream are used for these transition paths.
SAP S/4Hana uses the implementation guide (IMG) and the in app extensibility option for configuration and development and
there are different roles in the application design and confugration worsksteam
upgrade of AP S4HANA cloud are mnaged by SAP and upgrades of SAP S4HAANA are managed by the customer
Which value chains does SAP solution manager 7.2 deliver? (3C)
Detect to correct
cash to order
requirement to deploy
request to fullfill
hire to retire
Which of the following belong to the application design and configuration workstream for SAP S4HANA cloud in the explore phase?(2C)
Kick off workshop
integration prerequieseite confirmation
FIT to standard workshop
configuration definition
which avtivity helps the project team and user storeis to the pdoduct backlog? (1c)
Assessing project risks
conducting the soluition validation workshop
preparing a project schedule
planning the UAT
in which plahse do you verify that the sap best practices contenst meets the customer is business nessds and then capture gaps?
according to the definitoin of done which hactivity must be completed for each sprint?
End user training musht be delivered
functionality must be released to the business
the solution must be built and coniguraiton in the development system DEV
Funtionality must be tested in the quality system
which accelerates support the Fit TO standard workshop in the explore phase?
which estimation technique can be used in agile delivery approach to size the user stories during sprint planning?
Detailed buttom up effor estimate by the scrum master in story point based on the user story complexity
product owners relative estimates of the effort that will be needed to implement the user story
relative estimate in ideal person days that reflects the best estimated provided by the project team
Detailed bottoms up effort estimate that break each user story up into hours or shorter tasks
What is the basis for approving work results ( signing act of acceptance ) on a project phase level?
Agree and met acceptance criteria within quality gate
scrum of scrum meeting decision
definitiokn of ready for sprint
definiton of done for user story
which of the following is part of the explore phase in the new implementation of sap s4hana cloud transintion path?
simpificaiton and custom code impact anlysis
fit to standard
setup and enablement
solution validation and delta design
How does the provisioning of SAP s4hana Cloud differ from the setup of sap s4hana ?
there is a present phase for q system which is unique for SAP s4hana cloud
sap s4haan system takes lesstime to provision than sap s4hana cloud system
to start a solution validation workshop a DEV system is availbale for SAP S4HAAN while a starter system is required for Fit to standard fo
In SAP S4HANA deconmmissioning / shutdown of the starter system is intiated automatically after the P system is required throught the
which of the folowing will help you avoid modification of standard funtionality in SAP s4hana cloud single tenant edition ? (3C)
The side by side extensibility option such as SAP cloud platform
contact restrictions in sap s4hanaa enterprise cloud and SAP s4hanan CLOUD SINGLE TENANT EDITION
The 5 golder rules
SAP code inspector
A developer key
what is the order of artifacts within the technical architecture and infrastruture workstream in the prepare phase?
Technical strategy - hardware specification from hardware vendor - parameter hardware sizing calculation - hardware sizing result
Technical strategy - parameter hardware siging clculation -hardware szing results-hardware specification from hardware vendor
Parameter hardware sizing calculation - technical strategy - hardware sizing results - hardware specification from ardware vendor
Parameter hardware sizing calculation - hardware sizing results - hardware specification from hardware vendor- technical strategy
in which phase should you create a data migration strtegy ( LO) during a selective data transition ?
in which phase do you create an ordered list of everything that is known to be need in the product ?
what is the term used for workshops which are intended to set value targets validate SAP standard funtionality against the customer req
Solution validation
design thinking
fit to standard
delta design
what solution opearation famework can customers use to create a join business and IT organizaation that will secure transaparency and
SAP operation control center
customer center of expertise
business transformation magangement methodlogy
sap activate
foundational
which tool can you use to collaborate with other SAP activate methodology practitioners?
SAP implementation assistant
who determines the tasks that are required to complete the cmmitted backlog items in a sprint
scrum master
project manager
project team
product owner
what information does the project team need beofre they can correctly estimate the relative size of backlog user stories
Test strategy
available project resources
overall project schedule
defintion of done
what are some of the key characteristics of the implementation approach in SAP activate methodology?
Based on ready to use content
cooud ready
on premise only
fixed scope
delta based
2 How would you describe the realize phase in the new implementation of SAP s4hanaa
Transtion path
configure and develp
configuration copy
configure
configure and adjust custome code
2 3 which of the follwing are example of ready to run sap s4hana system ?
sap best pratices explorer
sap model company
fully activated applicance
sap mission control center
4 how often will and upgrade be performed on an sap s4hana cloud singe tenant edition environemnt?
schedule is defined by service level agreement for sap hana enterpricse cloud and sap s4hana cloud sin
every year
one upgrade and two feature pcks per year
every quarter
5 working in an agile approach what should your planning look like at the beginning of realise phase ?
timeline of th sprint may differ due to the workload
project scople and planning are complete and final
user stories are in a ready state for NO more than the fist three sprint
go live scope is fixed on the fist of january the following year
3a 6 what is the purpose of the solution validation activity on the explore phase?
challenges changes to standard
log additional scope items
verify technical installation
identify gaps
educate project participants
7 Which of the following are benefits of using ready to use content ? (2C)
Run SAP like a factory
predictable results
fast time to value
minimized total cost of ownership
8 What term is used for a ready to run sap s4hana system with prebuilt solution documentation which su
fully activated appliance
sap cloud appliance library
best practice system
SAP model company
9 what is the most granular level of the methodology you can view in SAP roadmap viewer?
scenario
phase
task
deliverables
11 which of the following tools are specific to the data management workstream?
3 SAP solution manager
sap landscape transformation
sap data services
sap roadmap viewer
sap s4hana migration cockpit ( for both sap s4hana cloud and sap s4hana edition)
12 What are the two important approaches based on the control center concept that sap proposes to use
1
2
3
4
13 Which of the following are levels in the structure of an SAP best practices solution package? ( 2 answers
1
2
3
4
17 When does the scrum team receive formal confirmation that the user storeis are completed to the satis
1
2
3
4
18 In SAP activate what tool is used in the agile delivery approach during the realize phase to make forecas
1
2
3
4
20 what techniques helps a scrum team to prioritize a large flat back log? ( C1)
1
2
3
4
21 why is there no sandbox system in the new implementation of SAP s4hana cloud / single tennat edition
1
2
3
4
22 Which satatement are part of 5 golden rules for SAP S4HAN SING TEN EDI? ( 2 c)
1
2
3
4
23 Which of the following are the components of SAP model company (3c)
1
2
3
4
25 Which E2E Turn key application LC mgt solution can support you inmanaging requirements and softwa
1
2
3
4
26 Which new project roles are introudcued with SAP activate methodology for the agile delivery approch
1
2
3
4
27 Via which media does SAP provide ready to run system for SAP s4hana deployments (2C)
1
2
3
4
28 Which collaboration features can SAP jam user access in the SAP methodolgies Jam GROUP(2c)
1
2
3
4
29 what tool would you use for managing project task and solution doucmentation when implementing SA
1
2
3
4
30 What tool provides guidance on replacing custom code development for SAP ERP with SAP s4hana funti
1
2
3
4
31 What accelarator can help you document the configuration defnition in the explore phase(1c)
1
2
3
4
32 which artifacts are part of the solution adoption worskstream ?( 3c)
1
2
3
4
5
33 Which artifacts are created within application design and configuration workstream in the explore phas
1
2
3
4
5
34 Which artifacts in the testing work stream are created within the realise phase for the new implantatio
1
2
3
4
35 What are some of the key topics covererd in the customer team enablement workstream ( 3C)
1
2
3
4
5
36 What is the best target deployment option of SAP S4HANA for the sytem conversion transition path ( 1C
1
2
3
4
37 What are the responsibilites of the product owner in release and sprint planning (2C)
1
2
3
4
38 What tool provides sizing estimations for the system conversion transition path (1C)
1
2
3
4
39 In which phase should you run the sap readiness check for sap s4hana selective data transition , transiti
1
2
3
4
40 In which phase the customer develop the preliminary strategy for building a target operations and supp
1
2
3
4
41 Which new role is introduced in the sap activate methodolgiey in the full scrum team (1C)
1
2
3
4
43 In the new implementation of SAP s4hana transition path, which systems are part of the project system
1
2
3
4
46 How would you describe the explore phase in the new implementation of SAP s4hana cloud transitiion
1
2
3
4
48 Ready to use content in SAP activate includes which of the following? (2C)
1
2
3
4
49 Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
1
2
3
4
50 How do you achieve frequent checkpoint with the end user in an agile delivery approch ( 2C)
1
2
3
4
51 What tool is used to authorize changes between SAP ERP and SAP S/4 Hana manitenance tracks?
1
2
3
4
52 Which of the following content best outlines the sequence of testing within the application design and
1
2
3
1
2
3
1
2
3
1
2
3
53 What is the difference between the new implementation of SAP S/4 Hana cloud and the new implemen
1
2
3
4
54 Which value chains does SAP solution manager 7.2 deliver? (3C)
1
2
3
4
5
55 Which of the following belong to the application design and configuration workstream for SAP S4HANA
1
2
3
4
56 which avtivity helps the project team and user storeis to the pdoduct backlog? (1c)
1
2
3
4
58 in which plahse do you verify that the sap best practices contenst meets the customer is business nessd
Explore
deploy
realize
59 according to the definitoin of done which hactivity must be completed for each sprint?
End user training musht be delivered
functionality must be released to the business
the solution must be built and coniguraiton in the development system DEV
Funtionality must be tested in the quality system
61 which accelerates support the Fit TO standard workshop in the explore phase?
62 which estimation technique can be used in agile delivery approach to size the user stories during sprint
Detailed buttom up effor estimate by the scrum master in story point based on the user story complex
product owners relative estimates of the effort that will be needed to implement the user story
relative estimate in ideal person days that reflects the best estimated provided by the project team
Detailed bottoms up effort estimate that break each user story up into hours or shorter tasks
63 What is the basis for approving work results ( signing act of acceptance ) on a project phase level?
Agree and met acceptance criteria within quality gate
scrum of scrum meeting decision
definitiokn of ready for sprint
definiton of done for user story
64 which of the following is part of the explore phase in the new implementation of sap s4hana cloud tran
simpificaiton and custom code impact anlysis
fit to standard
setup and enablement
solution validation and delta design
65 How does the provisioning of SAP s4hana Cloud differ from the setup of sap s4hana ?
there is a present phase for q system which is unique for SAP s4hana cloud
sap s4haan system takes lesstime to provision than sap s4hana cloud system
to start a solution validation workshop a DEV system is availbale for SAP S4HAAN while a starter system
In SAP S4HANA deconmmissioning / shutdown of the starter system is intiated automatically after the
67 which of the folowing will help you avoid modification of standard funtionality in SAP s4hana cloud sing
The side by side extensibility option such as SAP cloud platform
contact restrictions in sap s4hanaa enterprise cloud and SAP s4hanan CLOUD SINGLE TENANT EDITION
The 5 golder rules
SAP code inspector
A developer key
68 what is the order of artifacts within the technical architecture and infrastruture workstream in the prep
Technical strategy - hardware specification from hardware vendor - parameter hardware sizing calculati
Technical strategy - parameter hardware siging clculation -hardware szing results-hardware specificatio
Parameter hardware sizing calculation - technical strategy - hardware sizing results - hardware specifica
Parameter hardware sizing calculation - hardware sizing results - hardware specification from hardware
69 in which phase should you create a data migration strtegy ( LO) during a selective data transition ?
Discover
realize
explore
deploy
70 in which phase do you create an ordered list of everything that is known to be need in the product ?
deploy
explore
prepare
realize
73 what is the term used for workshops which are intended to set value targets validate SAP standard funti
Solution validation
design thinking
fit to standard
delta design
74 what solution opearation famework can customers use to create a join business and IT organizaation th
SAP operation control center
customer center of expertise
business transformation magangement methodlogy
sap activate
76 which tool can you use to collaborate with other SAP activate methodology practitioners?
SAP implementation assistant
SAP jam
Sap solution manager
Sap roadmap viewer
77 who determines the tasks that are required to complete the cmmitted backlog items in a sprint
scrum master
project manager
project team
product owner
78 what information does the project team need beofre they can correctly estimate the relative size of bac
Test strategy
available project resources
overall project schedule
defintion of done
79 what are some of the key characteristics of the implementation approach in SAP activate methodology
Based on ready to use content
cooud ready
on premise only
fixed scope
delta based
How would you describe the realize phase in the new implementation of SAP s4hanaa
Transtion path
configure and develp
configuration copy
which of the follwing are example of ready to run sap s4hana system ?
sap best pratices explorer
sap model company
fully activated applicance
sap mission control center
how often will and upgrade be performed on an sap s4hana cloud singe tenant edition environemnt?
schedule is defined by service level agreement for sap hana enterpricse cloud and sap s4hana cloud single tenanant edition sercice
working in an agile approach what should your planning look like at the beginning of realise phase ?
timeline of th sprint may differ due to the workload
project scople and planning are complete and final
user stories are in a ready state for NO more than the fist three sprint
go live scope is fixed on the fist of january the following year
what is the purpose of the solution validation activity on the explore phase?
challenges changes to standard
log additional scope items
verify technical installation
identify gaps
educate project participants
Which of the following are benefits of using ready to use content ? (2C)
Run SAP like a factory
predictable results
fast time to value
minimized total cost of ownership
What term is used for a ready to run sap s4hana system with prebuilt solution documentation which supports end to end processes for a
fully activated appliance
sap cloud appliance library
best practice system
SAP model company
what is the most granular level of the methodology you can view in SAP roadmap viewer?
deliverables
which of the following tools are specific to the data management workstream?
SAP solution manager
sap landscape transformation
sap data services
sap roadmap viewer
sap s4hana migration cockpit ( for both sap s4hana cloud and sap s4hana edition)
What are the two important approaches based on the control center concept that sap proposes to use for streamlines implementation an
Run SAP like a factory
Build sap like a factory
Intelligent Enterprice
Always Connected
Which of the following are levels in the structure of an SAP best practices solution package? ( 2 answers)
Scope items
building blocks
configuration guides
business process scenearios
When does the scrum team receive formal confirmation that the user storeis are completed to the satisficaiton of the product owner? ( C
During the sprint review
during the UAT
During the daily scrum meeting
During the sprint retrospective
In SAP activate what tool is used in the agile delivery approach during the realize phase to make forecast based on actual data? ( c 1)
release plan
product implement
project plan
burn down chart
what techniques helps a scrum team to prioritize a large flat back log? ( C1)
Fit / GAP analysis
Planning poker
user story mapping
retrospective
why is there no sandbox system in the new implementation of SAP s4hana cloud / single tennat edition transition path ? ( 1 C)
Because the project team uses the DEV system to confirm solution FI and define Delta requirements
Because SAP s4hana cloud singel tenant edition , contains predefined business proceses which should not be changed
Becase the FIT to statndard workshop is conducted using Q- system
Because the custome may use the sap model company
Which satatement are part of 5 golden rules for SAP S4HAN SING TEN EDI? ( 2 c)
Foster a cloud mindset and adherence to the fit to standard approcah
document deviation from golden rule for tansparency and future use in upgrade
use SAP solution manager 7.2 which focused build
stick to the security standard of the customer organization
Which of the following are the components of SAP model company (3c)
Business Process content for SAP solution manager
Pre configured solution business driven config questionnaire
quality gate checklist
Accelarators
Which E2E Turn key application LC mgt solution can support you inmanaging requirements and software devlopment for large agile proje
CR management
Solution manager Test suite
Focused Build
Requirement management
Which new project roles are introudcued with SAP activate methodology for the agile delivery approch(2 c)
Scrum master
Product owner
Design thinking coach
Integration lead
Via which media does SAP provide ready to run system for SAP s4hana deployments (2C)
Blue - ray discs
Sap app center
SAP solutin builder tool
SAP appliance librarty
Which collaboration features can SAP jam user access in the SAP methodolgies Jam GROUP(2c)
Tweet questions
Update Key deliverable wikis
comment on key deliverables
Ask questions
what tool would you use for managing project task and solution doucmentation when implementing SAP S4HANA cloud (1c)
SAP road map viewer
Implementation portal for SAP S4HANA cloud
SAP transformation navigator
Sap support Market Phase
What tool provides guidance on replacing custom code development for SAP ERP with SAP s4hana funtionalities for the system conversio
Sap Code inspector
Software update manager with data base migration option
simplification item check
Software provsioning manager
What accelarator can help you document the configuration defnition in the explore phase(1c)
Data definition
CR template
Backlog Template
Test Strategy
which artifacts are part of the solution adoption worskstream ?( 3c)
System go live announcement ( order)
Detailed Design business process
Project Plan
Business transformation review ( Pint of view )
Project business case
Which artifacts are created within application design and configuration workstream in the explore phase of the new implementation of SA
Detailed design - business process
Organization structure specification
Delta requirement list - register
Roles and authorization management concept
project procedure mockup modeling
Which artifacts in the testing work stream are created within the realise phase for the new implantation of SAP S4HANA Cloud transition
Fuctional specifications
Reporting functional specifications
Functional test scenarios
UAT - Plan
What are some of the key topics covererd in the customer team enablement workstream ( 3C)
Solution expertise
project sourcing approcah
technical experetise
project management
planning skills
What is the best target deployment option of SAP S4HANA for the sytem conversion transition path ( 1C)
Sap C4HANA
Sap s4hana cloud
hybrid - saps4hana clound and sap s4hana
Sap s4hana
What are the responsibilites of the product owner in release and sprint planning (2C)
Priortize backlog user stories by business priorities
analyse the functional the technical dependencies between user stories
eliminate the backlog user stories
define objective for each release
What tool provides sizing estimations for the system conversion transition path (1C)
SAP best practices explorer
Sap transformation navigator
sap readiness check
scope and effort analyzer
In which phase should you run the sap readiness check for sap s4hana selective data transition , transition path,in a system conssolitaion
Explore
Realise
Discover
Prepare
In which phase the customer develop the preliminary strategy for building a target operations and support organization model? - no ans
prepare phase
explore phase
run phase
discover phase
Which new role is introduced in the sap activate methodolgiey in the full scrum team (1C)
System administrator
Appplication consultant
product owner
project manager
In the new implementation of SAP s4hana transition path, which systems are part of the project system landscape (2C)
DEV
P system
Qas
Starter system
How would you describe the explore phase in the new implementation of SAP s4hana cloud transitiion path?( 1C)
Fit to standard
Step up and enablement
Simplification and custom code impact analysis
Solution validation and delta design
Ready to use content in SAP activate includes which of the following? (2C)
Project acceleratiors
SAP best practices
courses delivered by SAP education
Business models from leading companies in each industry sector
Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
Plan one phse at a time
use standard funtionality optionally
acchieve production readiness
start scoping early
How do you achieve frequent checkpoint with the end user in an agile delivery approch ( 2C)
UAT
Solution demo for sprints
demo the model company
solution review for waves
What tool is used to authorize changes between SAP ERP and SAP S/4 Hana manitenance tracks?
Businesss process change analyzer
SAP code inspector
Sap code vulnerability analyzer
Retrofit
Which of the following content best outlines the sequence of testing within the application design and confguration workstream in the re
Starting test
UAT
Integration Test
Data migration
String test
UAT
Integration test
UAT
String Test
String Test
Integration test
UAT
What is the difference between the new implementation of SAP S/4 Hana cloud and the new implementation of SAP S4HANA transition p
Different sets of Workstream are used for these transition paths.
SAP S/4Hana uses the implementation guide (IMG) and the in app extensibility option for configuration and development and
there are different roles in the application design and confugration worsksteam
upgrade of AP S4HANA cloud are mnaged by SAP and upgrades of SAP S4HAANA are managed by the customer
Which value chains does SAP solution manager 7.2 deliver? (3C)
Detect to correct
cash to order
requirement to deploy
request to fullfill
hire to retire
Which of the following belong to the application design and configuration workstream for SAP S4HANA cloud in the explore phase?(2C)
Kick off workshop
integration prerequieseite confirmation
FIT to standard workshop
configuration definition
which avtivity helps the project team and user storeis to the pdoduct backlog? (1c)
Assessing project risks
conducting the soluition validation workshop
preparing a project schedule
planning the UAT
in which plahse do you verify that the sap best practices contenst meets the customer is business nessds and then capture gaps?
according to the definitoin of done which hactivity must be completed for each sprint?
End user training musht be delivered
functionality must be released to the business
the solution must be built and coniguraiton in the development system DEV
Funtionality must be tested in the quality system
which accelerates support the Fit TO standard workshop in the explore phase?
which estimation technique can be used in agile delivery approach to size the user stories during sprint planning?
Detailed buttom up effor estimate by the scrum master in story point based on the user story complexity
product owners relative estimates of the effort that will be needed to implement the user story
relative estimate in ideal person days that reflects the best estimated provided by the project team
Detailed bottoms up effort estimate that break each user story up into hours or shorter tasks
What is the basis for approving work results ( signing act of acceptance ) on a project phase level?
Agree and met acceptance criteria within quality gate
scrum of scrum meeting decision
definitiokn of ready for sprint
definiton of done for user story
which of the following is part of the explore phase in the new implementation of sap s4hana cloud transintion path?
simpificaiton and custom code impact anlysis
fit to standard
setup and enablement
solution validation and delta design
How does the provisioning of SAP s4hana Cloud differ from the setup of sap s4hana ?
there is a present phase for q system which is unique for SAP s4hana cloud
sap s4haan system takes lesstime to provision than sap s4hana cloud system
to start a solution validation workshop a DEV system is availbale for SAP S4HAAN while a starter system is required for Fit to standard fo
In SAP S4HANA deconmmissioning / shutdown of the starter system is intiated automatically after the P system is required throught the
which of the folowing will help you avoid modification of standard funtionality in SAP s4hana cloud single tenant edition ? (3C)
The side by side extensibility option such as SAP cloud platform
contact restrictions in sap s4hanaa enterprise cloud and SAP s4hanan CLOUD SINGLE TENANT EDITION
The 5 golder rules
SAP code inspector
A developer key
what is the order of artifacts within the technical architecture and infrastruture workstream in the prepare phase?
Technical strategy - hardware specification from hardware vendor - parameter hardware sizing calculation - hardware sizing result
Technical strategy - parameter hardware siging clculation -hardware szing results-hardware specification from hardware vendor
Parameter hardware sizing calculation - technical strategy - hardware sizing results - hardware specification from ardware vendor
Parameter hardware sizing calculation - hardware sizing results - hardware specification from hardware vendor- technical strategy
in which phase should you create a data migration strtegy ( LO) during a selective data transition ?
in which phase do you create an ordered list of everything that is known to be need in the product ?
what is the term used for workshops which are intended to set value targets validate SAP standard funtionality against the customer requ
Solution validation
design thinking
fit to standard
delta design
what solution opearation famework can customers use to create a join business and IT organizaation that will secure transaparency and e
SAP operation control center
customer center of expertise
business transformation magangement methodlogy
sap activate
foundational
which tool can you use to collaborate with other SAP activate methodology practitioners?
SAP implementation assistant
who determines the tasks that are required to complete the cmmitted backlog items in a sprint
scrum master
project manager
project team
product owner
what information does the project team need beofre they can correctly estimate the relative size of backlog user stories
Test strategy
available project resources
overall project schedule
defintion of done
what are some of the key characteristics of the implementation approach in SAP activate methodology?
Based on ready to use content
cooud ready
on premise only
fixed scope
delta based
2 How would you describe the realize phase in the new implementation of SAP s4hanaa
Transtion path
configure and develp
configuration copy
configure
configure and adjust custome code
2 3 which of the follwing are example of ready to run sap s4hana system ?
sap best pratices explorer
sap model company
fully activated applicance
sap mission control center
4 how often will and upgrade be performed on an sap s4hana cloud singe tenant edition environemnt?
schedule is defined by service level agreement for sap hana enterpricse cloud and sap s4hana cloud sin
every year
one upgrade and two feature pcks per year
every quarter
5 working in an agile approach what should your planning look like at the beginning of realise phase ?
timeline of th sprint may differ due to the workload
project scople and planning are complete and final
user stories are in a ready state for NO more than the fist three sprint
go live scope is fixed on the fist of january the following year
3a 6 what is the purpose of the solution validation activity on the explore phase?
challenges changes to standard
log additional scope items
verify technical installation
identify gaps
educate project participants
7 Which of the following are benefits of using ready to use content ? (2C)
Run SAP like a factory
predictable results
fast time to value
minimized total cost of ownership
8 What term is used for a ready to run sap s4hana system with prebuilt solution documentation which su
fully activated appliance
sap cloud appliance library
best practice system
SAP model company
9 what is the most granular level of the methodology you can view in SAP roadmap viewer?
scenario
phase
task
deliverables
11 which of the following tools are specific to the data management workstream?
3 SAP solution manager
sap landscape transformation
sap data services
sap roadmap viewer
sap s4hana migration cockpit ( for both sap s4hana cloud and sap s4hana edition)
12 What are the two important approaches based on the control center concept that sap proposes to use
1 Run SAP like a factory
2 Build sap like a factory
3 Intelligent Enterprice
4 Always Connected
13 Which of the following are levels in the structure of an SAP best practices solution package? ( 2 answers
1 Scope items
2 building blocks
3 configuration guides
4 business process scenearios
17 When does the scrum team receive formal confirmation that the user storeis are completed to the satis
1 During the sprint review
2 during the UAT
3 During the daily scrum meeting
4 During the sprint retrospective
18 In SAP activate what tool is used in the agile delivery approach during the realize phase to make forecas
1 release plan
2 product implement
3 project plan
4 burn down chart
20 what techniques helps a scrum team to prioritize a large flat back log? ( C1)
1 Fit / GAP analysis
2 Planning poker
3 user story mapping
4 retrospective
21 why is there no sandbox system in the new implementation of SAP s4hana cloud
1 Because the project team uses the DEV system to confirm solution FI
2 Because SAP s4hana cloud singel tenant edition , contains predefined
3 Becase the FIT to statndard workshop is conducted using Q- system
4 Because the custome may use the sap model company
22 Which satatement are part of 5 golden rules for SAP S4HAN SING TEN EDI? ( 2 c)
1 Foster a cloud mindset and adherence to the fit to standard approcah
2 document deviation from golden rule for tansparency and future use
3 use SAP solution manager 7.2 which focused build
4 stick to the security standard of the customer organization
23 Which of the following are the components of SAP model company (3c)
1 Business Process content for SAP solution manager
2 Pre configured solution business driven config questionnaire
3 quality gate checklist
4 Accelarators
25 Which E2E Turn key application LC mgt solution can support you inmanaging req
ng of realise phase ? 1 CR management
2 Solution manager Test suite
3 Focused Build
4 Requirement management
26 Which new project roles are introudcued with SAP activate methodology for th
1 Scrum master
2 Product owner
3 Design thinking coach
4 Integration lead
27 Via which media does SAP provide ready to run system for SAP s4hana deploym
1 Blue - ray discs
2 Sap app center
3 SAP solutin builder tool
4 SAP appliance librarty
28 Which collaboration features can SAP jam user access in the SAP methodolgies J
1 Tweet questions
documentation which supports end to end processes for a s 2 Update Key deliverable wikis
3 comment on key deliverables
4 Ask questions
29 what tool would you use for managing project task and solution doucmentation
1 SAP road map viewer
2 Implementation portal for SAP S4HANA cloud
3 SAP transformation navigator
4 Sap support Market Phase
30 What tool provides guidance on replacing custom code development for SAP ERP
1 Sap Code inspector
2 Software update manager with data base migration option
3 simplification item check
4 Software provsioning manager
31 What accelarator can help you document the configuration defnition in the explo
1 Data definition
2 CR template
3 Backlog Template
4 Test Strategy
32 which artifacts are part of the solution adoption worskstream ?( 3c)
1 System go live announcement ( order)
2 Detailed Design business process
3 Project Plan
4 Business transformation review ( Pint of view )
hat sap proposes to use for streamlines implementation 5 Project business case
33 Which artifacts are created within application design and configuration workstre
1 Detailed design - business process
2 Organization structure specification
3 Delta requirement list - register
on package? ( 2 answers) 4 Roles and authorization management concept
5 project procedure mockup modeling
34 Which artifacts in the testing work stream are created within the realise phase f
1 Fuctional specifications
2 Reporting functional specifications
3 Functional test scenarios
d testing scrum, 4 UAT - Plan
ration, data loads and testing 35 What are some of the key topics covererd in the customer team enablement wo
1 Solution expertise
2 project sourcing approcah
entation of sap s/4 hana" transition path? (2 answers) 3 technical experetise
hrough the manage your solution app 4 project management
5 planning skills
for system conversion
conversion 36 What is the best target deployment option of SAP S4HANA for the sytem conver
1 Sap C4HANA
2 Sap s4hana cloud
3 hybrid - saps4hana clound and sap s4hana
4 Sap s4hana
37 What are the responsibilites of the product owner in release and sprint planning
1 Priortize backlog user stories by business priorities
2 analyse the functional the technical dependencies between user stor
e completed to the satisficaiton of the product owner? ( 3 eliminate the backlog user stories
4 define objective for each release
38 What tool provides sizing estimations for the system conversion transition path (
1 SAP best practices explorer
2 Sap transformation navigator
e phase to make forecast based on actual data? ( c 1) 3 sap readiness check
4 scope and effort analyzer
39 In which phase should you run the sap readiness check for sap s4hana selective d
1 Explore
2 Realise
3 Discover
4 Prepare
40 In which phase the customer develop the preliminary strategy for building a targ
1 prepare phase
2 explore phase
3 run phase
4 discover phase
tion of SAP s4hana cloud / single tennat edition transition path ? ( 1 C)
m to confirm solution FI and define Delta requirements
on , contains predefined business proceses which should not be changed
ducted using Q- system
r organization
el company (3c)
g questionnaire
port you inmanaging requirements and software devlopment for large agile projects? ( 1C)
development for SAP ERP with SAP s4hana funtionalities for the system conversion ( transition path) ( 1 c)
gration option
d configuration workstream in the explore phase of the new implementation of SAP S4HANA transaition part (3c)
within the realise phase for the new implantation of SAP S4HANA Cloud transition path (2C)
or sap s4hana selective data transition , transition path,in a system conssolitaion scenario that includes conversion from SAP ERP (1C)
ategy for building a target operations and support organization model? - no answer - need to check
n from SAP ERP (1C)
41 Which new role is introduced in the sap activate methodolgiey in the
1
2
3
4
46 How would you describe the explore phase in the new implementatio
1
2
3
4
50 How do you achieve frequent checkpoint with the end user in an agil
1
2
3
4
51 What tool is used to authorize changes between SAP ERP and SAP S/4
1
2
3
4
1
2
3
1
2
3
1
2
3
54 Which value chains does SAP solution manager 7.2 deliver? (3C)
1
2
3
4
5
56 which avtivity helps the project team and user storeis to the pdoduct
1
2
3
4
58 in which plahse do you verify that the sap best practices contenst me
Explore
deploy
realize
In the new implementation of SAP s4hana transition path, which systems are part of the project system landscape (2C)
DEV
P system
Qas
Starter system
How would you describe the explore phase in the new implementation of SAP s4hana cloud transitiion path?( 1C)
Fit to standard
Step up and enablement
Simplification and custom code impact analysis
Solution validation and delta design
Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
Plan one phse at a time
use standard funtionality optionally
acchieve production readiness
start scoping early
How do you achieve frequent checkpoint with the end user in an agile delivery approch ( 2C)
UAT
Solution demo for sprints
demo the model company
solution review for waves
What tool is used to authorize changes between SAP ERP and SAP S/4 Hana manitenance tracks?
Businesss process change analyzer
SAP code inspector
Sap code vulnerability analyzer
Retrofit
Which of the following content best outlines the sequence of testing within the application design and confguration workstream in the re
Starting test
UAT
Integration Test
Data migration
String test
UAT
Integration test
UAT
String Test
String Test
Integration test
UAT
What is the difference between the new implementation of SAP S/4 Hana cloud and the new implementation of SAP S4HANA transition p
Different sets of Workstream are used for these transition paths.
SAP S/4Hana uses the implementation guide (IMG) and the in app extensibility option for configuration and development and
there are different roles in the application design and confugration worsksteam
upgrade of AP S4HANA cloud are mnaged by SAP and upgrades of SAP S4HAANA are managed by the customer
Which value chains does SAP solution manager 7.2 deliver? (3C)
Detect to correct
cash to order
requirement to deploy
request to fullfill
hire to retire
Which of the following belong to the application design and configuration workstream for SAP S4HANA cloud in the explore phase?(2C)
Kick off workshop
integration prerequieseite confirmation
FIT to standard workshop
configuration definition
which avtivity helps the project team and user storeis to the pdoduct backlog? (1c)
Assessing project risks
conducting the soluition validation workshop
preparing a project schedule
planning the UAT
in which plahse do you verify that the sap best practices contenst meets the customer is business nessds and then capture gaps?
according to the definitoin of done which hactivity must be completed for each sprint?
End user training musht be delivered
functionality must be released to the business
the solution must be built and coniguraiton in the development system DEV
Funtionality must be tested in the quality system
uration questionnaire
nique can be used in agile delivery approach to size the user stories during sprint planning?
ffor estimate by the scrum master in story point based on the user story complexity
ve estimates of the effort that will be needed to implement the user story
eal person days that reflects the best estimated provided by the project team
ffort estimate that break each user story up into hours or shorter tasks
is part of the explore phase in the new implementation of sap s4hana cloud transintion path?
om code impact anlysis
d delta design
ning of SAP s4hana Cloud differ from the setup of sap s4hana ?
se for q system which is unique for SAP s4hana cloud
es lesstime to provision than sap s4hana cloud system
dation workshop a DEV system is availbale for SAP S4HAAN while a starter system is required for Fit to standard for SAP S4HAANA cloud
mmissioning / shutdown of the starter system is intiated automatically after the P system is required throught the manage your solution a
ntegration test
will help you avoid modification of standard funtionality in SAP s4hana cloud single tenant edition ? (3C)
sibility option such as SAP cloud platform
sap s4hanaa enterprise cloud and SAP s4hanan CLOUD SINGLE TENANT EDITION
tifacts within the technical architecture and infrastruture workstream in the prepare phase?
rdware specification from hardware vendor - parameter hardware sizing calculation - hardware sizing result
rameter hardware siging clculation -hardware szing results-hardware specification from hardware vendor
izing calculation - technical strategy - hardware sizing results - hardware specification from ardware vendor
izing calculation - hardware sizing results - hardware specification from hardware vendor- technical strategy
you create a data migration strtegy ( LO) during a selective data transition ?
wing scenarieos are enables for th eselective data transition transtion parth with the sap landscape transiont tool ? (3c)
online data replication
for workshops which are intended to set value targets validate SAP standard funtionality against the customer requirements and collect d
tion famework can customers use to create a join business and IT organizaation that will secure transaparency and effiecency of SAP imple
on magangement methodlogy
part of the SAP avtivate methodology
asks that are required to complete the cmmitted backlog items in a sprint
s the project team need beofre they can correctly estimate the relative size of backlog user stories
roject scheduling
equent inspections
or SAP S4HAANA cloud
e manage your solution app whereas in an SAPS/4 HANA System, the DEV system persists.
quirements and collect delta requirements in the new implementation of SAP S4 HANAtransitoin path?
effiecency of SAP implementation innovation , opearation and quality of businesss processes and sytem?
41 Which new role is introduced in the sap activate methodolgiey in the ful
1
2
3
4
46 How would you describe the explore phase in the new implementation o
1
2
3
4
49 Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
1
2
3
4
50 How do you achieve frequent checkpoint with the end user in an agile d
1
2
3
4
51 What tool is used to authorize changes between SAP ERP and SAP S/4 H
1
2
3
4
1
2
3
1
2
3
1
2
3
53 What is the difference between the new implementation of SAP S/4 Han
1
2
3
4
54 Which value chains does SAP solution manager 7.2 deliver? (3C)
1
2
3
4
5
56 which avtivity helps the project team and user storeis to the pdoduct ba
1
2
3
4
58 in which plahse do you verify that the sap best practices contenst meets
Explore
deploy
realize
1 63 What is the basis for approving work results ( signing act of acceptance )
Agree and met acceptance criteria within quality gate
scrum of scrum meeting decision
definitiokn of ready for sprint
definiton of done for user story
64 which of the following is part of the explore phase in the new implemen
simpificaiton and custom code impact anlysis
fit to standard
setup and enablement
solution validation and delta design
2 65 How does the provisioning of SAP s4hana Cloud differ from the setup of
there is a present phase for q system which is unique for SAP s4hana clo
sap s4haan system takes lesstime to provision than sap s4hana cloud sys
to start a solution validation workshop a DEV system is availbale for SAP
In SAP S4HANA deconmmissioning / shutdown of the starter system is i
67 which of the folowing will help you avoid modification of standard funtio
The side by side extensibility option such as SAP cloud platform
contact restrictions in sap s4hanaa enterprise cloud and SAP s4hanan CL
The 5 golder rules
SAP code inspector
A developer key
68 what is the order of artifacts within the technical architecture and infras
Technical strategy - hardware specification from hardware vendor - para
Technical strategy - parameter hardware siging clculation -hardware szin
Parameter hardware sizing calculation - technical strategy - hardware siz
Parameter hardware sizing calculation - hardware sizing results - hardwa
69 in which phase should you create a data migration strtegy ( LO) during a
Discover
realize
explore
deploy
72 which of the the following scenarieos are enables for th eselective data
Consolidation through online data replication
extraction of business units
security migration
system update
system cnsolidation
73 what is the term used for workshops which are intended to set value tar
Solution validation
design thinking
fit to standard
delta design
1 76 which tool can you use to collaborate with other SAP activate methodol
SAP implementation assistant
SAP jam
Sap solution manager
Sap roadmap viewer
1 77 who determines the tasks that are required to complete the cmmitted b
scrum master
project manager
project team
product owner
1 78 what information does the project team need beofre they can correctly
Test strategy
available project resources
overall project schedule
defintion of done
In the new implementation of SAP s4hana transition path, which systems are part of the project system landscape (2C)
DEV
P system
Qas
Starter system
How would you describe the explore phase in the new implementation of SAP s4hana cloud transitiion path?( 1C)
Fit to standard
Step up and enablement
Simplification and custom code impact analysis
Solution validation and delta design
Which of the following are part of the 10 sap QUALITY PRINCIPALS? (2c)
Plan one phse at a time
use standard funtionality optionally
acchieve production readiness
start scoping early
How do you achieve frequent checkpoint with the end user in an agile delivery approch ( 2C)
UAT
Solution demo for sprints
demo the model company
solution review for waves
What tool is used to authorize changes between SAP ERP and SAP S/4 Hana manitenance tracks?
Businesss process change analyzer
SAP code inspector
Sap code vulnerability analyzer
Retrofit
Which of the following content best outlines the sequence of testing within the application design and confguration workstream in the r
Starting test
UAT
Integration Test
Data migration
String test
UAT
Integration test
UAT
String Test
String Test
Integration test
UAT
What is the difference between the new implementation of SAP S/4 Hana cloud and the new implementation of SAP S4HANA transition
Different sets of Workstream are used for these transition paths.
SAP S/4Hana uses the implementation guide (IMG) and the in app extensibility option for configuration and development and
there are different roles in the application design and confugration worsksteam
upgrade of AP S4HANA cloud are mnaged by SAP and upgrades of SAP S4HAANA are managed by the customer
Which value chains does SAP solution manager 7.2 deliver? (3C)
Detect to correct
cash to order
requirement to deploy
request to fullfill
hire to retire
Which of the following belong to the application design and configuration workstream for SAP S4HANA cloud in the explore phase?(2C)
Kick off workshop
integration prerequieseite confirmation
FIT to standard workshop
configuration definition
which avtivity helps the project team and user storeis to the pdoduct backlog? (1c)
Assessing project risks
conducting the soluition validation workshop
preparing a project schedule
planning the UAT
in which plahse do you verify that the sap best practices contenst meets the customer is business nessds and then capture gaps?
according to the definitoin of done which hactivity must be completed for each sprint?
End user training musht be delivered
functionality must be released to the business
the solution must be built and coniguraiton in the development system DEV
Funtionality must be tested in the quality system
which accelerates support the Fit TO standard workshop in the explore phase?
quality gate checklist
bakclog template
test strategy
business driven configuration questionnaire
which estimation technique can be used in agile delivery approach to size the user stories during sprint planning?
Detailed buttom up effor estimate by the scrum master in story point based on the user story complexity
product owners relative estimates of the effort that will be needed to implement the user story
relative estimate in ideal person days that reflects the best estimated provided by the project team
Detailed bottoms up effort estimate that break each user story up into hours or shorter tasks
What is the basis for approving work results ( signing act of acceptance ) on a project phase level?
Agree and met acceptance criteria within quality gate
scrum of scrum meeting decision
definitiokn of ready for sprint
definiton of done for user story
which of the following is part of the explore phase in the new implementation of sap s4hana cloud transintion path?
simpificaiton and custom code impact anlysis
fit to standard
setup and enablement
solution validation and delta design
How does the provisioning of SAP s4hana Cloud differ from the setup of sap s4hana ?
there is a present phase for q system which is unique for SAP s4hana cloud
sap s4haan system takes lesstime to provision than sap s4hana cloud system
to start a solution validation workshop a DEV system is availbale for SAP S4HAAN while a starter system is required for Fit to standard fo
In SAP S4HANA deconmmissioning / shutdown of the starter system is intiated automatically after the P system is required throught the
which of the folowing will help you avoid modification of standard funtionality in SAP s4hana cloud single tenant edition ? (3C)
The side by side extensibility option such as SAP cloud platform
contact restrictions in sap s4hanaa enterprise cloud and SAP s4hanan CLOUD SINGLE TENANT EDITION
The 5 golder rules
SAP code inspector
A developer key
what is the order of artifacts within the technical architecture and infrastruture workstream in the prepare phase?
Technical strategy - hardware specification from hardware vendor - parameter hardware sizing calculation - hardware sizing result
Technical strategy - parameter hardware siging clculation -hardware szing results-hardware specification from hardware vendor
Parameter hardware sizing calculation - technical strategy - hardware sizing results - hardware specification from ardware vendor
Parameter hardware sizing calculation - hardware sizing results - hardware specification from hardware vendor- technical strategy
in which phase should you create a data migration strtegy ( LO) during a selective data transition ?
in which phase do you create an ordered list of everything that is known to be need in the product ?
which of the the following scenarieos are enables for th eselective data transition transtion parth with the sap landscape transiont tool ?
Consolidation through online data replication
extraction of business units
security migration
system update
system cnsolidation
what is the term used for workshops which are intended to set value targets validate SAP standard funtionality against the customer req
Solution validation
design thinking
fit to standard
delta design
what solution opearation famework can customers use to create a join business and IT organizaation that will secure transaparency and
SAP operation control center
customer center of expertise
business transformation magangement methodlogy
sap activate
which tool can you use to collaborate with other SAP activate methodology practitioners?
SAP implementation assistant
who determines the tasks that are required to complete the cmmitted backlog items in a sprint
scrum master
project manager
project team
product owner
what information does the project team need beofre they can correctly estimate the relative size of backlog user stories
Test strategy
available project resources
overall project schedule
defintion of done
what are some of the key characteristics of the implementation approach in SAP activate methodology?
Based on ready to use content
cooud ready
on premise only
fixed scope
delta based
2 How would you describe the realize phase in the new implementation of SAP s4hanaa
Transtion path
configure and develp
configuration copy
configure
configure and adjust custome code
3 which of the follwing are example of ready to run sap s4hana system ?
sap best pratices explorer
sap model company
fully activated applicance
sap mission control center
4 how often will and upgrade be performed on an sap s4hana cloud singe tenant edition environemnt?
schedule is defined by service level agreement for sap hana enterpricse cloud and sap s4hana cloud single tenanan
every year
one upgrade and two feature pcks per year
every quarter
5 working in an agile approach what should your planning look like at the beginning of realise phase ?
timeline of th sprint may differ due to the workload
project scople and planning are complete and final
user stories are in a ready state for NO more than the fist three sprint
go live scope is fixed on the fist of january the following year
6 what is the purpose of the solution validation activity on the explore phase?
challenges changes to standard
log additional scope items
verify technical installation
identify gaps
educate project participants
7 Which of the following are benefits of using ready to use content ? (2C)
Run SAP like a factory
predictable results
fast time to value
minimized total cost of ownership
8 What term is used for a ready to run sap s4hana system with prebuilt solution documentation which supports end t
fully activated appliance
sap cloud appliance library
best practice system
SAP model company
9 what is the most granular level of the methodology you can view in SAP roadmap viewer?
scenario
phase
task
deliverables
11 which of the following tools are specific to the data management workstream?
SAP solution manager
sap landscape transformation
sap data services
sap roadmap viewer
sap s4hana migration cockpit ( for both sap s4hana cloud and sap s4hana edition)
12 What are the two important approaches based on the control center concept that sap proposes to use for streamli
1 Run SAP like a factory
2 Build sap like a factory
3 Intelligent Enterprice
4 Always Connected
13 Which of the following are levels in the structure of an SAP best practices solution package? ( 2 answers)
1 Scope items
2 building blocks
3 configuration guides
4 business process scenearios
15 What is the difference between the "system conversion" and the " new implementation of sap s/4 hana" transition
1 SSCUIS are used in system conversion for configuring sap S4HANA through the manage your solution app
2 there are different upgrade cycles
3 in the realize phase custom codes is adjusted rather than developer for system conversion
4 in the reaslize phase data is converted and Not migrated for system conversion
17 When does the scrum team receive formal confirmation that the user storeis are completed to the satisficaiton of t
1 During the sprint review
2 during the UAT
3 During the daily scrum meeting
4 During the sprint retrospective
18 In SAP activate what tool is used in the agile delivery approach during the realize phase to make forecast based on
1 release plan
2 product implement
3 project plan
4 burn down chart
20 what techniques helps a scrum team to prioritize a large flat back log? ( C1)
1 Fit / GAP analysis
2 Planning poker
3 user story mapping
4 retrospective
21 why is there no sandbox system in the new implementation of SAP s4hana cloud / single tennat edition transition p
1 Because the project team uses the DEV system to confirm solution FI and define Delta requirements
2 Because SAP s4hana cloud singel tenant edition , contains predefined business proceses which should no
3 Becase the FIT to statndard workshop is conducted using Q- system
4 Because the custome may use the sap model company
22 Which satatement are part of 5 golden rules for SAP S4HAN SING TEN EDI? ( 2 c)
1 Foster a cloud mindset and adherence to the fit to standard approcah
2 document deviation from golden rule for tansparency and future use in upgrade
3 use SAP solution manager 7.2 which focused build
4 stick to the security standard of the customer organization
23 Which of the following are the components of SAP model company (3c)
1 Business Process content for SAP solution manager
2 Pre configured solution business driven config questionnaire
3 quality gate checklist
4 Accelarators
25 Which E2E Turn key application LC mgt solution can support you inmanaging requirements and software devlopme
1 CR management
2 Solution manager Test suite
3 Focused Build
4 Requirement management
26 Which new project roles are introudcued with SAP activate methodology for the agile delivery approch(2 c)
1 Scrum master
2 Product owner
3 Design thinking coach
4 Integration lead
27 Via which media does SAP provide ready to run system for SAP s4hana deployments (2C)
1 Blue - ray discs
2 Sap app center
3 SAP solutin builder tool
4 SAP appliance librarty
28 Which collaboration features can SAP jam user access in the SAP methodolgies Jam GROUP(2c)
1 Tweet questions
2 Update Key deliverable wikis
3 comment on key deliverables
4 Ask questions
29 what tool would you use for managing project task and solution doucmentation when implementing SAP S4HANA c
1 SAP road map viewer
2 Implementation portal for SAP S4HANA cloud
3 SAP transformation navigator
4 Sap support Market Phase
30 What tool provides guidance on replacing custom code development for SAP ERP with SAP s4hana funtionalities for
1 Sap Code inspector
2 Software update manager with data base migration option
3 simplification item check
4 Software provsioning manager
31 What accelarator can help you document the configuration defnition in the explore phase(1c)
1 Data definition
2 CR template
3 Backlog Template
4 Test Strategy
32 which artifacts are part of the solution adoption worskstream ?( 3c)
1 System go live announcement ( order)
2 Detailed Design business process
3 Project Plan
4 Business transformation review ( Pint of view )
5 Project business case
33 Which artifacts are created within application design and configuration workstream in the explore phase of the new
1 Detailed design - business process
2 Organization structure specification
3 Delta requirement list - register
4 Roles and authorization management concept
5 project procedure mockup modeling
34 Which artifacts in the testing work stream are created within the realise phase for the new implantation of SAP S4H
1 Fuctional specifications
2 Reporting functional specifications
3 Functional test scenarios
4 UAT - Plan
35 What are some of the key topics covererd in the customer team enablement workstream ( 3C)
1 Solution expertise
2 project sourcing approcah
3 technical experetise
4 project management
5 planning skills
36 What is the best target deployment option of SAP S4HANA for the sytem conversion transition path ( 1C)
1 Sap C4HANA
2 Sap s4hana cloud
3 hybrid - saps4hana clound and sap s4hana
4 Sap s4hana
37 What are the responsibilites of the product owner in release and sprint planning (2C)
1 Priortize backlog user stories by business priorities
2 analyse the functional the technical dependencies between user stories
3 eliminate the backlog user stories
4 define objective for each release
38 What tool provides sizing estimations for the system conversion transition path (1C)
1 SAP best practices explorer
2 Sap transformation navigator
3 sap readiness check
4 scope and effort analyzer
39 In which phase should you run the sap readiness check for sap s4hana selective data transition , transition path,in a
1 Explore
2 Realise
3 Discover
4 Prepare
40 In which phase the customer develop the preliminary strategy for building a target operations and support organiza
1 prepare phase
2 explore phase
3 run phase
4 discover phase
n environemnt?
p s4hana cloud single tenanant edition sercice
realise phase ?
entation which supports end to end processes for a specific industry so that the projce team can focus on differenctiation and innovation
p proposes to use for streamlines implementation and operation withing premium engagment ( 2 answers)
ckage? ( 2 answers)
e delivery approch(2 c)