+05.18.2022 - Lumira Water Leak

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Date Reported Property Name Brand

3/24/2021 Lumira Alveo


5/4/2021 Lumira Alveo

8/9/2021 Lumira Alveo

2/2/2022 Lumira Alveo


Leak Location

LEAK DESCRIPTION
Unit Floor Tower

Leak at Admin Comfort Room (interior) G


Leak at corridor G

Leak at Function Hall G

Leak at Admin Comfort Room (exterior) G


Leak Location Criticality

Type Minor
(Plumbing or MAJOR
Internal or Partition Wall, (water seepage
Structural) (with Ops or Eqpt Impact)
External Window, or Ceiling only or minor
damage)

Internal Ceiling Structural 1


Internal Ceiling Structural 1

Internal Ceiling Structural 1

External Wall Plumbing 1


RECTIFICATION / ACTIONs

Person Responsible Proposed ACTION Target Completion

OPS Application of vulca seal/ sealant on roofing; application of skim c 4/18/2021


OPS Application of vulca seal/ sealant on roofing 6/26/2021

OPS Application of vulca seal/ sealant on roofing 1/4/2022

OPS Subject for area chipping to check leakage origin 1/4/2022


Remarks

Completed
Completed
Waiting for budget; Covered by
Insurance claims on
Hailstorm/Typhoon claims
Waiting for budget; Subject for
repairs

You might also like