Price Bid - Part-2 - School Flooring Work Replacement of Flooring Work For Higher Secondary School Building at SKV Nagar, Lignite Project Panandhro - Tende No-7/Lp/Colony & School Flooring Work/2019

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Tende No-7/LP/COLONY & SCHOOL FLOORING WORK/2019

Price Bid -Part-2 - SCHOOL FLOORING WORK


Replacement of Flooring work for Higher Secondary School Building at SKV Nagar , Lignite Project Panandhro .
Note: The price bid contains separate quantity for each structures in all the items and bidders has to quote the same rate for each structure . If bidder quote the
different rates for same item for different buildings , than the lowest rate of the particular item shall be considered for evaluation .

Item No Description Qty Unit Rate Amount


DISMANTLING FLOORING / DADO- Dismantling of existing floor
tiles or stone floors laid in mortar , including stacking of useful
material as directed and throw out the debrish, rubish etc. out side
1.00 1760.00 Smt 0.00 0.00
the premises as through trcator/trolly , as dircetd by EIC with all
lead and lift . (Approx- 10 Km. lead from site)

DISMANTLING - Dismantling cement concrete work , including


stacking of useful material as directed and throw out the debrish,
2.00 rubish etc. out side the premises through trcator/trolly , as dircetd 133.35 Cmt 0.00 0.00
by EIC with all lead and lift . (Approx 10 km. lead from site)

DISMANTLING - Dismantling of existing Pre cast Block Masonry


work , including stacking of useful material as directed and throw
3.00 out the debrish, rubish etc. out side the premises as through 5.28 Cmt 0.00 0.00
trcator/trolly , as dircetd by EIC with all lead and lift . (Approx 10
Km. lead from site)
DISMANTLING - Dismantling of existing Rubble soling material ,
including stacked useful material as directed and throw out the
4.00 debrish, rubish etc. out side the premises through trcator/trolly , as 713.69 Cmt 0.00 0.00
dircetd by EIC with all lead and lift ( approx 10 km. distance from
site) .
Providing Sand filling in Plinth under floors , including watering ,
ramming and consolidating , dressing etc. complete as directed
5.00 705.67 Cmt 0.00 0.00
and specified by EIC.-

Providing and laying cement concrete 1:3:6 (1-Cement:3-coarse


sand:6- aggregates 40mm nominal size) and curing complete
6.00 including cost of formwork in with all lead lift, all labours , tools , 156.24 Cmt 0.00 0.00
tackles , materials required etc. complete (A)Foundation and Plinth-

Providing and laying precast concrete block masonry (including


quoin blocks Jamb blocks, closer etc.) with solid concrete blocks
having minimum compressive stength 60 Kg/Sq cm of approved
size made of cement concrete 1:3:6 mix (1cement : 3 course sand
: 6 graded stone aggregates of 20 mm and down gauge) in
7.00 foundation , plinth & in super structureup to 3.0mt ht. in cement 10.56 Cmt 0.00 0.00
mortar 1:6 in true line level and plumb including racking out joints
up to 15mm depth rubbing and cleaning the surface including
curing ,scaffolding etc. as directed including cost of cement. etc.as
ditected by EIC.

Providing and laying Polished kota stone slab of 25 mm. thick of


approved quality , for flooring , in line and level , over 20 mm.
average thick base of cement mortar 1:6 ( 1 cement: 6 coarse
sand) laid over and jointed with grey cement slurry mixed with
8.00 pigment to match the shade , including rubbing and polishing etc. 1754.30 Smt 0.00 0.00
complete , including all materials , labours, tools , tackles, wastage
, polishing etc. complete , as directed and specified by EIC.

Providing and laying approved color and shed and aprroved


pattern Vitrified Tiles Flooring , with zero absorption of
premium grade in size 24"x24" with minimum thickness of 8mm
procured from make like Asian, Simpolo, Euro ,Kajaria and Nitco
or equivalent laid over base of 20 mm. thick cement mortar 1:3 (1
cement : 3 sand) in flooring , treads of steps , landing , skirting and
9.00 67.06 Smt 0.00 0.00
risers ,Dedo, including 12 mm. thick badding coat in CM 1:4 , etc
complete , including finishing with filling joints with matching color
grouts and white cement slury, cleaning etc. complete plus
protecting the tiled floor from scratches during construction by
appropriate mean as directed.
Price Bid -Part-2 - SCHOOL FLOORING WORK

Providing 15mm thick cement Plaster , in single coat on fair side of


Block masonry wall in C.M. 1:4 , and finished even and smooth
including finishing the surface with smooth cement finishing,
10.00 39.60 Smt 0.00 0.00
necessary drip mouldings, scaffolding, curing etc. complete ,
including all men power, labour, tools and tackles etc. complete
and as directed by Eingineer in charge
TOTAL 0.00