Proposed Starter Bar Planting For CC2 at lvl1 in Order To Comply With Architectural Concrete Profile Plan (As A Possible Solution)
Proposed Starter Bar Planting For CC2 at lvl1 in Order To Comply With Architectural Concrete Profile Plan (As A Possible Solution)
Proposed Starter Bar Planting For CC2 at lvl1 in Order To Comply With Architectural Concrete Profile Plan (As A Possible Solution)
DS
DS
DS
DS
IN ACCORDANCE WITH AS1684 AND ANY SUPPLEMENTS
DENOTES - LOADBEARING STUD WALL OVER
LBSW (LIGHT TIMBER FRAMING MANUAL) ADOPTING A WIND
1.05
2
CLASSIFICATION OF N3 FOR DETAILING PURPOSES.
S
BW
W2
DENOTES - DOUBLE STUD OVER
A
D
S.211 REFER ALSO TO THE ARCHITECTS DRAWING AND
W3
W2
SPECIFICATIONS FOR WALL TYPES AND FIRE RATING
300 REQUIREMENTS. DENOTES - ROOF ACCESS CATWALK
DS
HOB TO EXTERNAL SLAB STUDS:
DENOTES - SLAB SETDOWN
ZONES, TYPICAL. REFER UNLESS NOTED OTHERWISE ON PLAN OR SCHEDULED THE REFER TO ARCHITECTURAL DETAILS FOR
HOB W2 HOB S.231 FOR HOB DETAILS, GROUND FLOOR STUDS ARE TO BE 90x45 F17 KDHW SPACED LEVELS
TYPICAL. AT 450mm MAXIMUM CENTRES WITH 2 ROWS OF NOGGINGS
HOB
EQUALLY SPACED BETWEEN THE TOP AND BOTTOM PLATES. DENOTES - ALLOWANCE FOR CAST-IN
HOB HYDRAULIC/ELECTRIC/MECHANICAL SERVICES.
(3000mm MAX. HEIGHT.)
REFER SERVICES ENGINEERS AND ARCHITECT
DOUBLE STUDS (U.N.O.):- FOR SETOUT. REFER PT DESIGNER FOR
W2
W2
HOB
HOB
PROVIDE 2/90 x 45 F17 KDHW STUDS LOCATED UNDER ENDS TRIMMING REINFORCEMENT DETAILS, TYPICAL.
260 HOB
OF ALL FIRST FLOOR BEAMS AND LINTELS UNLESS NOTED
HOB
OTHERWISE. MULTIPLE STUDS ARE TO BE NAIL LAMINATED
B 230 TOGETHER TO FORM A SINGLE UNIT IN ACCORDANCE WITH
AS. 1684. POST TENSION NOTES:
HOB TO EXTERNAL SLAB MIN. brogue.com.au
ZONES, TYPICAL. REFER THE BUILDER SHALL ALLOW FOR FULL DESIGN,
HOB
FALL
slab set downs DOCUMENTATION, CERTIFICATION AND CONSTRUCTION (03) 9416 2092
S.231 FOR HOB DETAILS, W3 W3 updated.
HOB
TYPICAL. SUPERVISION OF ALL POST TENSIONED STRUCTURES.
W2
POST TENSION CONTRACTOR IS TO ASSUME MAXIMUM 10%
CONCRETE ROOF. FALLS TO COLUMN STIFFNESS FOR FLEXURAL DESIGN, AND 100%
BE POURED INTEGRAL WITH COLUMN STIFFNESS FOR PUNCHING CHECKS, TYPICAL.
HOB
HOB
W3
S.300
CONSIDERED ADDITIONAL TO THE POST TENSION DESIGN
AND ARE TO BE INCLUDED IN THE POST TENSION DESIGN
CW1 W3 AND DRAWINGS AS INDICATED.
C STAIR
POST TENSION CONTRACTOR IS TO PROVIDE SLIP JOINTS
TO ALL CORNERS AND OTHER AREAS AND OTHER AREAS AS
CW1
CW1
LIGHT GUAGE INFILL FRAMING
1000 REQUIRED, AND PROVIDE DETAILS TO THIS OFFICE FOR
TO FORM BRICK REVEAL BY W2 REVIEW.
OTHERS.
ALL INTERNAL AREAS ARE TO ACHIEVE A MINIMUM
1200
MIN.
MODERATE DEGREE OF CRACK CONTROL, UNLESS NOTED
W2
NOTE: CW1
W3 OTHERWISE.
W3
REFER SECTION DETAILS 1.01, 1.02, 1.03, 1.04
ON S.211 FOR TYPICAL SLAB EDGE DETAILS. 230 300 ALL EXPOSED EXTERNAL AREAS ARE TO ACHIEVE A
SHELF ANGLE REQUIRED WITH CAST-IN STRONG DEGREE OF CRACK CONTROL, UNLESS NOTED
DS
CW2 OTHERWISE.
CHANNEL FOR ALL BRICKWORK EXTENTS. W2
REFER ARCHITECT FOR LOCATIONS,
TYPICAL. THE CONCRETE OUTLINE DOCUMENTED SHALL NOT BE
LIFT
DS
ALTERED WITHOUT CONSULTATION WITH THIS OFFICE AND
CW2
CW2
CW2
THE PROJECT ARCHITECT.
W2
OF ALL INSPECTION REPORTS TO BE SUBMITTED
DURING THE CONSTRUCTION PHASE
bars to be remained
W3
TRIMMER BARS AT PENETRATIONS AND
highlighted in RE-ENTRANT
Green
DS
LIGHTWEIGHT FEATURE
HOB
HOB
DS
BOTTOM EDGES OF SUSPENDED SLABS DIAGONALLY
ARCHITECT
ACROSS ALL RE-ENTRANT CORNERS AND
W3
starter bar PERPENDICULAR TO DISCONTINUOUS EDGES. TRIMMER
DS
W1
HOB TO EXTERNAL SLAB BARS NOT SHOWN ON PLAN UNLESS NOTED OTHER
230 230
ZONES, TYPICAL. REFER
S.231 FOR HOB DETAILS,
planting for WISE.
CC2 at lvl1
DS
TYPICAL.
'X' 'X'
300
in order to
W2
HOB
HOB 400 comply with AND BOTTOM EACH SIDE OF PENETRATION. EXTEND
MINIMUM 600mm PAST EACH CORNER OF PENETRATION.
E
HOB
1.01 architectural
W2
TRIMMER BARS NOT SHOWN ON PLAN, UNLESS NOTED
2
LBSW
CC
S.211 OTHERWISE. FIRST TRIMMER BAR TO BE LOCATED AND PROJECT NORTH
W2 HOB HOB
concrete HAVE 75mm COVER FROM SIDES OF PENETRATION/VOID
OR SLAB EDGE, TYPICAL.
W2
profile plan
BW2
W2
HOB
300
HOB
MAX.
2.02
600
BW
B
W1 W1 S.221
solution) :
600
MAX.
the slab. depth
2
REVISION
F 200mm with HILTI
600
DS
DS
DS
DS
LBSW
ISSUE DATE DESCRIPTION
BW2
HOB TO EXTERNAL SLAB
RE-500 as
800 800 ZONES, TYPICAL. REFER
S.231 FOR HOB DETAILS,
highlighted in Orange
MIN. MIN. TYPICAL.
1.03 C3 02/12/2020 CONSTRUCTION ISSUE
S.211 C2 14/10/2020 CONSTRUCTION ISSUE
C3 C1 06/10/2020 CONSTRUCTION ISSUE
T2 13/03/2020 FINAL CO-ORDINATION
T1 18/12/2018 TENDER ISSUE
P1 28/06/2018 PRELIMINARY ISSUE
DENOTES EXTERNAL SLAB AREA EXPOSED TO WEATHER. AFS WALL SCHEDULE CONCRETE COLUMN SCHEDULE
POST TENSION CONTRACTOR IS TO ENSURE A HIGH DATE: JUN 2018 DESIGNED: TF
DEGREE OF CRACK CONTROL IN THESE AREAS, TYPICAL. REINFORCEMENT F'c DRAWN: MB CHECKED: AP
DENOTES FULL SLAB PENETRATION.
MARK THICKNESS (mm) F'c (MPa) VERTICAL HORIZONTAL REMARKS MARK 'H' (mm) 'B' (mm) (MPa) REINFORCEMENT LIGS REMARKS SCALE: As indicated SIZE: A1
REFER PT CONTRACTOR FOR DETAILS.
W1 200 40 N12-200 E.F. N12-200 E.F. 200D AFS WALL CC1 1000 300 40 14/N20 3/N12-300 CLOSED CONCRETE COLUMN Job No. Drawing No. Rev.
DENOTES ALLOWANCE FOR CAST-IN W2 200 40 N12-200 E.F. N12-200 E.F. 200D AFS WALL CC2 600 350 40 10/N20 2/N12-200 CLOSED CONCRETE COLUMN
HYDRAULIC/ELECTRIC/MECHANICAL SERVICES. FULL
PENETRATIONS ARE NOT ALLOWED. REFER PT DESIGNER
FOR TRIMMING REINFORCEMENT DETAILS, TYPICAL
W3
W4
162
262
40
40
N12-200
N16-200 E.F.
N12-200
N12-200 E.F.
162 AFS WALL
200D AFS WALL
CC3
CC4
300
400
300
300
40
40
4/N20
8/N20
N12-300 CLOSED
2/N12-150 CLOSED
CONCRETE COLUMN
CONCRETE COLUMN 18187 S.210 C3