Dispatch Plan Date-20/05/2022: Part Name Planned Quantity Commitment Remarks Actual Dispatch Quantity

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Dispatch plan Date-20/05/2022

Part Name Planned Quantity Commitment Actual Dispatch


Quantity Remarks
Top and Bottom Housing Details
Cut Billets Forging/Machining Steel Stcok
Top Housing 850 700
56 T
Bottom Housing 300 2000
S.NO Receiving Date Grade Size HEAT.NO Party Name TOTAL

1 29.11.19 27MNVS6 100RCS SFL-1 1.04


2 6.4.21 SAE8620 56DIA 26498 6.19
3 31.1.20 S48C 56DIA B-38492 TATA.STEEL 5.251

4 17.11.17 42CRMO4 23DIA 92381 ADICO 1.89


5 5.5.21 20MNCR5 75RCS M-819056 JAYASWAL 13.27
6 8.7.20 CK-45 63DIA 912030 THAKKAR 5.85
10 15.12.20 SAE4140 110RCS KKX SFL-2 4.646
25.656

1 S45C 32DIA 18E2738 BHUPENDRA 4.99


2 13.5.21 SAE1010 56DIA 21D/21E00037 THAKKAR 30.38
3 10.3.18 SAE1010 50DIA 17D01689 RINL 5.012
Remarks

Send to unit -1
Send to unit -1
Transfer to GD Stock

Still Pending
Still Pending
Still Pending
Still Pending

Still Pending
Still Pending
Still Pending
Qty. status Complete on
Regular Export Container Status
Centre wedge 612 Completed
Friction Shoe 1224 Grinding and MPI to be done 30-Apr
Tapered Plate 1224 600 OK, Balance to be completed by today 26-Apr
OSP 1224 800 OK,Balance to be completed by 28/04 28-Apr
Spring Cap 2448 Coining to be done 29-Apr
Movable Plate 2448 Completed

SCH.
Centre wedge M-50 300 200 o.k. ,100 G.D.
Centre Wedge reg. 612 250 Deep,150 Acufab Balance to be send in G.D.
Movable Plate 1224 580 Ok, 300 Deep Balance to be send in Deep
Maintenance Issues
Presses Time in Min. Problems

4000 85 500 ton trimming press main air pipe line broken so welding work

1600-1 60 Min. 250 Ton Trimming press Balancing shaft broken so open cylinder for repairing

1600-2 50 Min. Brake packing removed and brake setting

Total 3.15 Hrs.