Atazziwsr
2225 Skyland Court
Norcross, Georgia 30071
‘Telephone (678) 728-9100
Fax (770) 729-8242
Work Package Index
New Age Welding Solutions
Eskom - Koeberg
209302-WPI-001
Revision 0
Date
09-17-2015
Nuclear Safety Related
ASME Section XI; Class 2
‘The “Pre-Work Approval” WPI, Revision 0, shall be developed to identify the documents and
revision levels that have been approved for use on the project and approved prior to the start of
work activities. Revision 0 shall be maintained with the data package in its original, approved state,
and a copy of Revision 0 used to annotate and track addition documents and revisions to project
documents that occur during the project.
A “Final” WPI, Revision 1, shall be issued at the conclusion of the project to identify all revisions
of referenced documentation used to support and document the work activities and be reviewed and
approved by the WSI PM and the WSI Site Lead QA/QC.
Tite
Name atures: Date
WSI Project Manager
EIFS
WS! Quality Assurance
Glos
MPs
Z Hepes
Revision 06/01/2013,New Age Welding Solutions ~ Eskom - Koeberg
209302-WPI-001, Rey. 0
Work Package Index
Inger Document Name / Wdentifieation Rev | ,N° Remarks
No. Pages
| Haquipment Calibration Records
= MATE (includes M&TE Summary Usage Lag) =
= Weld Systems and Equipment Status Log =
10 | Referenced QA & Inspeetion Procedures
~ WSI.QAP 2.0 Ta | 7 | “Procedure forTndocirination and Training
of WSI Personne!”
~WSTQAP EO Ts | ora | “Procedure for Material Receiving and
Control"
~WSI QAP R1 Th | aa) Procedure for The Control and Tasue of
Weld Filler Metal”
~WST QAP 93 Dr) ar | cProcedure for Workmanship and Visual
Examination”
~WSTQAP 150 T1 | a4) Procedure for the Contol of
Nonconforming Conditions”
Ti_| NGR’s (with Log) and Observation Reports
12 _| Material Certifications
= CofC &CMIR 17_| Weld Wire for Prgjest
33 _| Training Records
14_| Miscellaneous
Email from R, Boderte Signature Authorization
1 | 9ans
(Sciacea)
~ Email rom Rv Bodetie~ Signature Authorization a
ren) ~ | 1 |onsas
~ Email fom M. Seiacea ~ Signature Authorization
rain ~ | 1 | snsns
-Enail from J. Faulk: Signature Authorization
Gor) ~ | 1 | sams
-Email from M, Keller Signature Authorization |], oayagy
(Powe)
Page 3 of 3New Age Welding Solutions ~ Eskom - Koeberg
209302-WPI-001, Rev. 0
Work Package Index
Tagen Document Name / Identification Rev | Ne Remarks
0. Pages
1___| Work Package Index (Pre-Work Approval): v3
‘Work Package Index (Final): 1_|- = _| Final configuration
Final Certificate of Compliance =| End of Project
Code Data Reports =| End oF Project
Final Document Pkg. Transmittal =| = | End of Project
2__| Drawings & Design Specifications:
= Procurement Document Index (QAP 3.0) =| 1 | Shallfbe updated throughout the project
=NAWS Contract! NAWSVAZZ-004 =| 24
= Addenda Oto Contract =| -2 | Material callout change to straight pipe
Eskom ‘Maintenance Welding Progran’ ~
SENMOD * | 27 | See Section 5.13 for ‘Weld Idemification”
~KBA 0207 Q 02155 Z5_| 1 | Isometric Drawing 2 RIS 001 TY (12°)
=KBA 0207 Q 02173 Z| 1 [Isometric Drawing 2 RIS 004 TY (127)
=KBA 0217 RIS 110 723 | 1 | Reactor Safety Injection System
= Email from J. Zinyana— Piping & Elbow Speos_|-- | 5 | 8/11/2015
~ Email from P. Buys ~ Current Drawing Revisions 3_[ mois
= Email from I. Zinyana — Weld ID Callout 8} 2262012
= Email from J. Zinyana — ASME Section If = [2 [oen01s
= Email from J. Zinyana ~ Construction Code 2 [992015
~ Email from J. Zinyana~316L Material 3_| 9714/2015
= Email from J, Zinyana — Existing Materials = [3 [nono
3 _ | Process Documents:
= Traveler 209302-TR-O01 1 [35 [Common
Traveler 209302-TR-004 O | 23 | Pre-Fab at 2 RIS 001 TY
=209302-WDS-004 — F4, FS, Bo 03 | Pre Fab for2 RIS OOTY
= WSI Drawing 429067 T_ [1 | Weld Map for2 RIS O01 TY
4 | Weld Operator Logs
3 _| Weld Procedure Specification(s)
= WPS 08-08-TS-001 TO_[ 6 | Tcludes PORs 08-08-TS-001, O808-TS.002
6 __| Material Issue Documents
= Weld Material Draw Chits with Filler Material | |
Log
7___|Maspection / Examination Reports
~PI, MT, VI, & UT Reports (with NDE Summary |_| __
Log)
8__| Personnel Cerfifications / Qualifications
. Cooley, Creamer, Jennings, Ledford,
= Welders/Weld Operators nudes Maitnance | | oo ea ere Share, South,
tem Wessels
= WSI QC Personnel (includes eye exam records) =| 8 | Bronson, Puca
Page 2 of 3