PROJECT : CONSTRUCTION OF RAIL FED DEPOT AT VILLAGE SWAIPURA/CHOTILA,DIST-PALI, RAJASTHAN
VENDOR : SOPAN P.O. NO. : 6300002455 Dated 15.11.2019
CLIENT : NAYARA ENERGY LIMITED REPORT NO. :
PMC : PEMS DATE :-
QUALITY INSPECTION RECORD/ ACTIVITY COMPLETION RECORD FOR HT PANEL/LT PANEL/BUS DUCT-LV BUS DUCT
Location : MCC
Ref Dwg No.: SOP-NAYA-PS-ELE-LBT-210
Sr. CHECKED
DESCRIPTION / ACTIVITY REMARKS
No. STATUS SOPAN PEMS NAYARA
A Material receiving inspection OK
B check installation of HT Panel/LT Panel / Bus Duct according to GAD drawings. OK
C Check Every panel board with supports for adequacy, workmanship, spacing, leveling, alignment & painting OK
D Ensure proper Coupling, fixing of sectionalized switch boards. OK
E Ensure all the connection of cable as per cable schedule and capacity of switch gear and equipment. OK
F Ensure earthing connection to each switch board body. OK
G Check the bus bar and cable termination tightness as required. OK
H Ensure connection of control wiring as per drawing. OK
I Check metering and function of all indicating lamps and other accessories. OK
J Check IR value & continuity of cables. OK
K Activity completion.
COMMENTS: 1. HT PANEL/LT PANEL/BUS DUCT ERECTION/INSTALLATION WORK IS COMPLETED AS PER REFER DRAWING
2. ATTACHED MEGGER REPORT NO: ___________________________________________________________________
6 Circuits checking
PT circuits
Space heater & current circuits CHECKED OK
Contactor closing &
tripping mechanism
Control circuits OK
Tested by Witnessed by
Vendor SOPAN PEMS NAYARA
Sign
Name
Date
SOPAN O&M CO. PVT. LTD.
CLIENT : Nayara Energy Limited CONSULTANT: PEMS
Electrical works at Proposed Petroleum Storage Terminal at Pali, Rajasthan
Doc.No.: SOP-NAYA-PS-ELE-LTP-204 Rev. No. : 0 FORMAT F-01
TESTING REPORT - LV BUS DUCT 415V, 3200A
REPORT NO.:- DATE:-
Sr. Instrument Calibrating
Instrument Details Make Model Calibration Validity Calibration Cert. No. Remark
No. S.No. Agency
5KVA INSULATION
1 MECO MECO DIT-954 547249 8/30/2022 PTCC PTCC/SEP/SOM-09 OK
TESTER
Sr. BUSBAR / SIZE / CHECK IR IN GΩ
PANEL TAG NO. LENGTH (M) REMARKS
No. RATING DATE R-Y Y-B B-R R-N Y-N B-N R-E Y-E B-E N-E
3200A, 2X200X10
1 LV BUS DUCT 415V, 3200A mm AL./PH. & 15969mm 29.11.2021 >812MΩ >816MΩ >79M8Ω >612MΩ >618MΩ >594MΩ >512MΩ >584MΩ >533MΩ >551MΩ
2X200X10 mm AL./N
REMARKS:-
G2 Is electrical wiring/ equipment protected from probable liquid leak sources? CHECKED OK
Is a Ground Fault Circuit Interrupt (GFCI) system installed & operating per design,where
G3 applicable?
CHECKED OK
G4 Maximo Tag, Nameplate, and Serial Number are attached to equipment. CHECKED OK
D DOCUMENTATION:
Submittal of equipment operation manuals and
D1 specifications to System Owner.
SUMITTED
E ELECTRICAL:
E6 Confirm bus bars and connecting links are tightened to specified torque. CHECKED OK
Verify unit is internally and externally clean, and covers are securely fastened with all
E8 screws in place.
CHECKED OK
E14 Verify all testing complete and documented including. CHECKED Report are attached
Note :-