FORMAT No. : .

SOP/NAYARA/PEMS/EE/P-01/IR-01B

REPORT No. :4
EARTH STRIP INSTALLION REPORT
DATE : 15/07/21 REV-1
PROJECT : CONSTRUCTION OF RAIL FED DEPOT AT VILLAGE SWAIPURA/CHOTILA,DIST-PALI, RAJASTHAN
DRG NO - SOP-NAYA-ELE-DW-ELE-515,

LOCATION- MS TANK AREA, UG TANK AND FIRE WATER

EARTH FLAT/STRIP AS PER DRAWING / SPECIFICATION


FLAT SIZE
S.NO. PHYSICAL INSPECTION FROM LOCATION TO LOCATION LAID LENGTH DATE SOPAN PEMS REMARKS
(MM) WELDING OF APPLICATION OF HESSIAN TREATMENT OF WELD
OVER LAPPING JOINT BITUMEN TAPE JOINT

1 75X10 MM Checked MCC-ROOM FRONT SIDE MCC-ROOM FRONT SIDE 49.1 150 MM 8.00 DONE DONE OK

2 50X10 MM Checked MCC-ROOM FRONT SIDE MCC-ROOM FRONT SIDE 13.4 150 MM 4.00 DONE DONE OK

3 75X10 MM Checked GANTRY (Pit-01) South Side (PIT) 32.55 150 MM 20.00 DONE DONE OK

4 75X10 MM Checked GANTRY (Pit-02) South Side (PIT) 31.55 150 MM 4.00 DONE DONE OK

5 75X10 MM Checked GANTRY (Pit-03) South Side (PIT) 25.2 150 MM 4.00 DONE DONE OK

6 40X10 MM Checked GANTRY (Pit-04) South Side (PIT) 5.35 150 MM 4.00 DONE DONE OK

7 40X10 MM Checked GANTRY (Pit-05) South Side (PIT) 9.35 150 MM 4.00 DONE DONE OK

8 75X10 MM Checked EAST TO WEST NORTH TO EAST TO WEST NORTH TO 150 MM DONE DONE OK
SOUTH SOUTH

9 75X10 MM Checked EAST TO WEST NORTH TO EAST TO WEST NORTH TO 150 MM DONE DONE OK
SOUTH SOUTH

GALAXY SOPAN

Signature

Name

Date