G-00 - Table of Contents

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ROAD UPGRADING / IMPROVEMENT (UI) COMPONENT of the ROAD UPGRADING PRESERVATION PROJECT (RUPP)

RECONSTRUCTION/REPAIR OF BRIDGES DAMAGED BY THE 2013 EARTHQUAKE, BOHOL PROVINCE - CONTRACT PACKAGE 3

TABLE OF CONTENTS
RECONSTRUCTION OF CLARIN BRIDGE (B00075BH)
DRAWING DRAWING DRAWING
TITLE OF DRAWING TITLE OF DRAWING TITLE OF DRAWING
NO. NO. NO.
R-29 STANDARD PROJECT SIGNBOARD S-32 CABLE SUPPORT DETAILS (10)
G. GENERAL PLAN AND PROFILE SERVICE AND CROSS ROAD-1 S-33 CABLE SUPPORT DETAILS (11)
R-30
G-00 TABLE OF CONTENTS (1) (STA.242+297.87 & STA.242+379.04) S-34 CABLE SUPPORT DETAILS (12)
G-01 TABLE OF CONTENTS (2) ROADWAY CROSS - SECTIONS XROAD-1 (STA.242+297.87) S-35 DETAILS OF UPPER STRUT (1)
R-31
G-02 LEGENDS, ABBREVIATIONS AND SYMBOLS STA. 0+000.00 - STA. 0+066.58) S-36 DETAILS OF UPPER STRUT (2)
G-03 GENERAL NOTES FOR ROADS, DRAINAGE AND STRUCTURES ROADWAY CROSS - SECTIONS SROAD-1 (STA.242+379.04) S-37 DETAILS OF UPPER STRUT (3)
R-32
G-04 CONSTRUCTION SEQUENCE AND METHODOLOGY (STA. 0+000.00 - STA. 0+108.93) S-38 DETAILS OF END FLOOR BEAM (1)
G-05 RIVER CUTTING SECTION DETAILS ROADWAY CROSS - SECTIONS SROAD-1 (STA.242+379.04) S-39 DETAILS OF MID FLOOR BEAM
R-33
KEY MAP, PROJECT LOCATION MAP, ALIGNMENT LAYOUT PLAN (STA. 0+120.00 - STA. 0+154.46) S-40 DETAILS OF STRINGER 1
G-06
AND VICINITY MAP S-41 DETAILS OF STRINGER 2
G-07 SETTING OUT COORDINATE PLAN
E. BRIDGE ELEVATIONS AND LAYOUTS S-42 LATERAL BRACING DETAILS
G-08 TEMPORARY SUPPORTS E-1 BOREHOLE LOCATION PLAN, BOREHOLE LOGS & SOIL PROFILE S-43 MANHOLE AND HANDHOLE DETAIL
E-2 GENERAL PLAN AND ELEVATION S-44 MAINTENANCE PIECE
Q. SUMMARY OF QUANTITIES E-3 SUB STRUCTURE AND BAR SCHEDULE (1) S-45 DECK SLAB REINFORCEMENT DETAIL (1)
Q-1 SUMMARY OF QUANTITIES (BRIDGE) E-4 SUB STRUCTURE AND BAR SCHEDULE (2) S-46 DECK SLAB REINFORCEMENT DETAIL (2)
Q-2 SUMMARY OF QUANTITIES (APPROACH ROAD) E-5 SUB STRUCTURE AND BAR SCHEDULE (3) S-47 EXPANSION JOINT DETAIL
Q-3 SUMMARY OF QUANTITIES (TEMPORARY ROAD) E-6 TYPICAL WING WALL, APPROACH RAILINGS AND SIDEWALK DETAILS S-48 BEARING DETAILS FOR ABUTMENT A AND B
BENCH CONCRETE AND REINFORCEMENT DETAILS, UTILITY PIPE S-49 UNSEATING PREVENTION DETAILS
R. APPROACH ROAD E-7
AND UNSEATING PREVENTION BAR SUPPORT S-50 HAND RAIL DETAILS
R-1 TOPOGRAPHIC PLAN (STA. 242+230.00 - STA. 242+758.77) S-51 HANGER ROPE DETAILS (1)
R-2 GEOMETRIC PLAN (STA. 242+230.00 - STA. 242+758.77)
S. BRIDGE ELEMENTS & REINFORCEMENTS S-52 HANGER ROPE DETAILS (2)
R-3 PLAN AND PROFILE (STA. 242+230.00 TO STA. 242+758.77) S-1 WEIGHT LIST S-53 HANGER ROPE DETAILS (3)
R-4 ROADWAY CROSS - SECTIONS (STA. 242+220.00 TO STA. 242+260.00) S-2 DESIGN SUMMARY OF STRUCTURAL FRAMES S-54 HANGER ROPE DETAILS (4)
R-5 ROADWAY CROSS - SECTIONS (STA. 242+280.00 TO STA. 242+320.00) S-3 CAMBER DETAILS S-55 HANGER ROPE DETAILS (5)
R-6 ROADWAY CROSS - SECTIONS (STA. 242+340.00 TO STA. 242+372.089) S-4 COORDINATE ELEMENTS (FIGURE 1) S-56 HANGER ROPE DETAILS (6)
R-7 ROADWAY CROSS - SECTIONS STA. 242+380.00 TO STA. 242+420.00) S-5 COORDINATE ELEMENTS (FIGURE 2) S-57 HANGER ROPE DETAILS (7)
R-8 ROADWAY CROSS - SECTIONS (STA. 242+438.00 TO STA. 242+460.00) S-6 SUPERSTRUCTURE COORDINATES S-58 HANGER ROPE DETAILS (8)
R-9 ROADWAY CROSS - SECTIONS (STA. 242+480.00) S-7 GENERAL DRAWING OF SUPERSTRUCTURE (1) S-59 HANGER ROPE DETAILS (9)
R-10 ROADWAY CROSS - SECTIONS (STA. 242+500.00) S-8 GENERAL DRAWING OF SUPERSTRUCTURE (2) S-60 HANGER ROPE DETAILS (10)
R-11 ROADWAY CROSS - SECTIONS (STA. 242+520.00) S-9 ARCH CHORD DETAILS (1) S-61 BRIDGE SIDEWALK, DRAIN AND SUPPORT DETAILS (1)
R-12 ROADWAY CROSS - SECTIONS (STA. 242+540.00 TO STA. 242+560.00) S-10 ARCH CHORD DETAILS (2) S-62 BRIDGE SIDEWALK, DRAIN AND SUPPORT DETAILS (2)
R-13 ROADWAY CROSS - SECTIONS (STA. 242+580.00 TO STA. 242+600.00) S-11 ARCH CHORD DETAILS (3) S-63 ABUTMENT SLOPE PROTECTION WITH SHEET PILES
R-14 ROADWAY CROSS - SECTIONS (STA. 242+620.00 TO STA. 242+660.00) S-12 ARCH CHORD DETAILS (4) S-64 APPROACH SLAB CONCRETE AND REINFORCEMENT DETAILS
R-15 ROADWAY CROSS - SECTIONS (STA. 242+680.00 TO STA. 242+720.00) S-13 ARCH CHORD DETAILS (5)
R-16 ROADWAY CROSS - SECTIONS (STA. 242+740.00 TO STA. 242+758.77) S-14 ARCH CHORD DETAILS (6)
F. BRIDGE FOUNDATIONS
R-17 TYPICAL ROADWAY SECTIONS, DESIGN PARAMETERS & NOTES S-15 DETAILS OF STIFFENING GIRDER (1) F-1 PILE LAYOUT AT ABUTMENTS A & B
R-18 GEOMETRIC ROAD DESIGN, SUPERELEVATION S-16 DETAILS OF STIFFENING GIRDER (2) F-2 PILING WORKS SEQUENCE
TYPICAL ROAD SIGNS, DETAILS OF INSTALLATION AND S-17 DETAILS OF STIFFENING GIRDER (3) F-3 PILE CONNECTION DETAILS
R-19
PAVEMENT MARKING DETAILS S-18 DETAILS OF STIFFENING GIRDER (4)
R-20 TYPICAL GUARDRAIL DETAILS S-19 DETAILS OF STIFFENING GIRDER (5)
R-21 LINED DITCH, AND STONE MASONRY DETAILS AND TABLES S-20 DETAILS OF STIFFENING GIRDER (6)
MECHANICALLY STABILIZE EARTH (MSE) RETAINING WALL DETAILS S-21 DETAILS OF STIFFENING GIRDER (7)
R-22
FOR EMBANKMENT PROTECTION S-22 BASE PLATE DETAILS
MECHANICALLY STABILIZE EARTH (MSE) RETAINING WALL DETAILS S-23 CABLE SUPPORT DETAILS (1)
R-23
FOR EMBANKMENT PROTECTION S-24 CABLE SUPPORT DETAILS (2)
MECHANICALLY STABILIZE EARTH (MSE) RETAINING WALL DETAILS S-25 CABLE SUPPORT DETAILS (3)
R-24
FOR EMBANKMENT PROTECTION S-26 CABLE SUPPORT DETAILS (4) PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULES AND
REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALS OF DETAILED
ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY THE CONSULTANTS NEITHER DIMINISHES
R-25 RCBC : 242+320.0 EXTEND DETAIL ( 1 ) S-27 CABLE SUPPORT DETAILS (5) THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND
DESIGN NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS
R-26 RCBC: 242+32.0 EXTEND DETAIL ( 2 ) S-28 CABLE SUPPORT DETAILS (6)
THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE FAILURE OF THE
R-27 TRAFFIC MAITIGATION PLAN (1) S-29 CABLE SUPPORT DETAILS (7) FACILITIES/STRUCTURES DUE TO THE FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE ORIGINAL DESIGN CONSULTANTS.

R-28 TRAFFIC MAITIGATION PLAN (2) S-30 CABLE SUPPORT DETAILS (8)
S-31 CABLE SUPPORT DETAILS (9) MASATOSHI KAHAWARA
PROJECT MANAGER

JAPAN OVERSEAS
CONSULTANT CO,. LTD TCGI ENGINEERS
KENJI TANAKA MASATOSHI KAWAHARA
CONTRACT PACKAGE - 3: RECONSTRUCTION OF TABLE OF CONTENTS (1) G-00
PROCONSULT, INC. EDWIN C. MATANGUIHAN VIRGILIO C. CASTILLO DANTE B. POTANTE RAUL C. ASIS ROGELIO L. SINGSON B00075BH
KENSETSU GIJUTSU CENTER, LTD Consulting Engineers
(Bgry. Loay, Bohol Province)

You might also like