Professional Documents
Culture Documents
F-1 - Pile Layout at Abutments A - B
F-1 - Pile Layout at Abutments A - B
F-1 - Pile Layout at Abutments A - B
4833
4833
4833
4833
7 EQUAL PARTS @ 2000 = 14000m
4833
4833
4833
B.HOLE-2
4833
4833
4833
4833
1500
1500
1500
1500
1
3000 3000 3000 3000
7200 7200
NOTES:
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENT ING RULES AND
REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALS OF DETAILED
ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY THE CONSULTANTS NEITHER DIMINISHES
THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND
DESIGN NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS
THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE FAILURE OF THE
FACILITIES/STRUCTURES DUE TO THE FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE ORIGINAL DESIGN CONSUL TANTS.
MASATOSHI KAHAWARA
PROJECT MANAGER
JAPAN OVERSEAS
CONSULTANT CO,. LTD TCGI ENGINEERS
KENJI TANAKA MASATOSHI KAWAHARA
PILE LAYOUT AT ABUTMENTS A & B F-1
PROCONSULT, INC. EDWIN C. MATANGUIHAN VIRGILIO C. CASTILLO DANTE B. POTANTE RAUL C. ASIS ROGELIO L. SINGSON RECONSTRUCTION OF
KENSETSU GIJUTSU CENTER, LTD Consulting Engineers CLARIN BRIDGE (B00075BH)
(Bgry. Loay, Bohol Province)