ITEM 1049 JET GROUTING
1049.1 Description
The Works shall consist of construction of grout columns with diameter (0.80
meter) and spacing as specified on the drawings or as directed by the Engineer.
This shall consist of installation, monitoring and testing of pressure/jet grouting to
meet the acceptance criteria in the drawings. The Contractor shall provide all
labour, materials and equipment to accomplish the work.
1049.2 Materials Requirements
The grout consists of the following materials with approval of job mix that
requires laboratory testing and verification and approval by the Engineer prior
to placement;
1. Cement, Portland, which shall conform to the requirements of Item 700
of the DPWH Standard Specifications for Highways and Bridges,
Volume Il, 2013 Edition.
2. Washed Sand conforming to the requirements of Item 703.5.2 of the
DPWH Standard Specifications for Highways and Bridges, Volume II,
2013 Edition.
W1221049.3
1049.4
1049.5
1049.6
3. Water conforming to the requirements of Item 714 of the DPWH
Standard Specifications for Highways and Bridges, Volume II, 2013
Edition.
4. Shurry conforming to the requirements of Item 716 of the DPWH
‘Standard Specifications for Highways and Bridges, Volume I, 2013
Edition.
5. Other additives that may be required and approved by the Engineer.
Equipment Requirements
‘The equipment needed for the execution of the works shall be available at the site
prior to placement as follows;
1. Drilling rig equipment of a type and capacity suitable for drilling required
hole diameter and drilling down to the required depth.
Cement Grout Mixer (High Speed) and holding tank
High Pressure Pump
Pressurized grouting equipment
Measuring and recording devices
Generator Set
Water Pump
Available spare parts to maintain satisfactory operation maintenance.
SI AWAwN
Construction Requirements
Construction scheme as showa on plans shall be carried out by the contractor. The
Contractor shall submit for the Engineer’s approval shop drawings, installation
plan and construction methodologies at least two (2) weeks before commencing on
construction of bore holes and grouting works
Method of Measurement
‘The quantity to be paid for will be measured by linear meter from the top to bottom
of the grouted boreholes as determined by the Engineer conforming to the diameter
as shown on plans without additional for excess in required diameter.
Basis of Payment
‘The quantities, determined shall be paid at the contract unit price which price and
payment shall be full compensation for furnishing and placing all materials
including formworks as may be required, excavations, tools and incidentals
necessary to complete the Item.
Payment will be made under:
W123Pay em Unit oF
Number Desenption Measurement
TO Tet Grouting, Linear Meter
(0.80m, dia. X 25m.)