PRINT/STRUKTUR GUDANG TOPIK Revisi Awal
PRINT/STRUKTUR GUDANG TOPIK Revisi Awal
5 4 3 2 1
6000 6000 6000 6000
K1 K1 K1 K1 K1
C
04 DETAIL A
DT-03 SKALA 1 : 10
6900
6900
100 50
K1 ±0.000 K1
05 DETAIL KOLOM
B
DT-04 SKALA 1 : 20
POT.1-1 06
DT-05
DETAIL PEMASANGAN ANGKUR
SKALA 1 : 10
NOTE :
6900
6900
- KOLOM K1 = WF 250 x 125 x 6 x 9
30
- RAFTER R = WF 200 x 100 x 5.5 x 8
150
- BALOK TB = WF 200 x 100 x 5.5 x 8
250
K1 K1 K1 K1 K1 - OVERSTEK (OV) = WF 150 x 75 x 5 x 7
A
350
POTONGAN MELINTANG AS 1
2600
2600
08
K1 K1 K1 ST-02 SKALA
POT-01
1 : 250 07 DETAIL PLAT LANTAI
DT-06 SKALA 1 : 20
SPANDEX
15°
WIREMESH
2953
4000 3600 4400 6000 6000 POT-01 R
OV R OV
5 4' 3' 3 2 1 TB TB TB TB
250 300 250
3100
01 DENAH K1 K1 K1 K1 K1
ST-01 SKALA 1 : 150
275
8020
PL. 10X250X200 TB TB TB TB
250 (LUBANG 6Ø18)
(ANGKUR 6Ø16)
4000
800
250
800
72 78 78 72
1800
300
275
-0.500 -0.500
500
65 120 65 800
03 DETAIL BASE PLAT KOLOM K1 02 DETAIL PONDASI TAPAK K1 6000 6000 6000 6000
DT-01 SKALA 1 : 15
DT-02 SKALA 1 : 25 5 4 3 2 1
Notes : Date. Revision Sign Location : Project : Date : 31.10.19 Scale : 1 : 150
Drawn by :
PERGUDANGAN Check by :
Approved :