Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

OBSERVATION ON QUALITY ASPECTS

EIL/B018/ SN /OQA-ELE- 299

Issued to: Sandeep Nanavati. Attn: Brijesh Pandey, RCM

Job No. and Description:B018 and Guru Govind Singh Polymer Addition Project

Location of Work: Food Court Extension


Details of Observation (Deficiency) Recommended Course of Action

1. Vertical down cable tray is aligned 1. Rectify the alignment of vertical down cable
properly. tray.

Time allowed for correction: Immediately

Issued By: Ankit Srivastava Received by-

Date: 13/11/2019 Date:

Corrective Action taken by Contractor / Vendor:

Date: Name and Signature

Distribution (Before Resolution):

RCM/AC/QA
Verification of Resolution by EIL

Date: Name and Signature

Distribution (After Resolution)

RCM/AC/QA

You might also like