Sr. No. Pending Sr. No.

Material
RBE 1
1 Belt 2
2 Drive pulley 3
3 Motor 4
4 Gear box 5
5 Input coupling tyre 6
6 Drive procket 7
8
PBE 9
7 Belt 10
8 Drive pulley 11
9 Motor 12
10 Gear Box 13
11 Input coupling tyre
12 Drive procket
Drag chain

13 Compelete assemby

BC-3
14 Belt
15 Motor
16 Gearbox
17 Input coupling
18 conveyor Hood
19 Safey switches
BC-4
20 Belt
21 Motor
22 Gearbox
23 Output coupling
24 conveyor Hood
25 Safety switches
26 Load Cell
27 Sheeting of CHP
Pending jobs of erection

Installation of insulators in ESP


Installation of transformers in ESP
Strengthening of top plate of ESP
Platform correction in heater area
Expansion tank level gauge fittings correction
OLCT pump alingment
CHW pump alingment
TF pump alingment
Whole of the CHP work is pending, only frame and some rollers are installed
Sheeting work in CHP
Painting jobs in heater area
Smoke test of Heater & ESP