Pemeriksaan Rutin Bulanan - Alat Pemadam Api Ringan (APAR) : Location Cylinder Installation Notes
Pemeriksaan Rutin Bulanan - Alat Pemadam Api Ringan (APAR) : Location Cylinder Installation Notes
Ukuran
Size
Jenis Catatan
No.
Permukaan
Ketinggian
Type Notes
Pegangan
Alat Ukur
Distance
Content
Surface
Rambu
Bottom
Handle
Selang
Gauge
Height
Dasar
Jarak
Hose
Sign
(Kg)
Pin
Isi
FE-DP-01 Dry Powder 4,5 Gd. Admin Lt.2, ruang Finance Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-02 Dry Powder 4,5 Gd. Admin Lt.2, depan tangga Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-03 Dry Powder 4,5 Gd. Admin Lt.2, meeting room Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-04 Dry Powder 4,5 Gd. Admin Lt.1, Lobby Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-05 Dry Powder 4,5 Gd. Admin Lt.1, Lobby Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-06 Dry Powder 4,5 Gd. Admin Lt.1, Lobby Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-07 Dry Powder 4,5 Posko Keamanan Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-08 Dry Powder 4,5 Canteen Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-09 Dry Powder 4,5 Mess Karyawan, Lobby Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-10 Dry Powder 4,5 Mess Karyawan, Lobby Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-11 Dry Powder 4,5 Mess Karyawan, Lorong Kamar Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-12 Dry Powder 4,5 Plant Manager office Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-13 Dry Powder 4,5 Control Room Lt.2 Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-14 Dry Powder 4,5 Control Room Lt.2 Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-15 Dry Powder 4,5 MCC Panel Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-16 Dry Powder 4,5 MV Panel Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-17 Dry Powder 4,5 Workshop Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-18 Dry Powder 4,5 Generator Blackstart Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-19 Dry Powder 4,5 WTP, samping Panel RO Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-20 Dry Powder 4,5 Fire Hydrant Panel Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
Diperiksa oleh Benny R / Harits P Tanggal periksa 15 April 2021
Inspected by Date of inspection
Referensi: Permen Nakertrans No. 4 Tahun 1980 tentang Syarat-Syarat Pemasangan dan Pemeliharaan Alat Pemadam Api Ringan Halaman 1 / 2
Pemeriksaan Rutin Bulanan – Alat Pemadam Api Ringan (APAR)
Ukuran
Size
Jenis Catatan
No.
Permukaan
Ketinggian
Type Notes
Pegangan
Alat Ukur
Distance
Content
Surface
Rambu
Bottom
Handle
Selang
Gauge
Height
Dasar
Jarak
Hose
Sign
(Kg)
Pin
Isi
FE-CO2-01 Carbon Dioxide 9 MV Panel Ok Ok Ok Ok Ok Ok OK Ok Ok Next Inspection Des 2021
FE-CO2-02 Carbon Dioxide 9 MV Panel Ok Ok Ok Ok Ok Ok OK Ok Ok Next Inspection Des 2021
FE-CO2-03 Carbon Dioxide 9 Workshop Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-04 Carbon Dioxide 9 Workshop Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-05 Carbon Dioxide 9 Fire Hydrant Panel Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-06 Carbon Dioxide 4,6 Gd. Admin Lt.2, work hall Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-07 Carbon Dioxide 4,6 Gd. Admin Lt.1, lobby Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-08 Carbon Dioxide 4,6 Control room Lt.2, lorong GE Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-09 Carbon Dioxide 4,6 Control Room Lt.1, lobby MCC Ok Ok Ok Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
Dilaporkan oleh,
Benny R/ Harits P
SHE
Referensi: Permen Nakertrans No. 4 Tahun 1980 tentang Syarat-Syarat Pemasangan dan Pemeliharaan Alat Pemadam Api Ringan Halaman 2 / 2