Pemeriksaan Rutin Bulanan – Alat Pemadam Api Ringan (APAR)

Lokasi Tabung Pemasangan


Location Cylinder Installation

Ukuran
Size
Jenis Catatan
No.

Permukaan

Ketinggian
Type Notes

Pegangan
Alat Ukur

Distance
Content
Surface

Rambu
Bottom

Handle
Selang

Gauge

Height
Dasar

Jarak
Hose

Sign
(Kg)

Pin
Isi
FE-DP-01 Dry Powder 4,5 Gd. Admin Lt.2, ruang Finance Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-02 Dry Powder 4,5 Gd. Admin Lt.2, depan tangga Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-03 Dry Powder 4,5 Gd. Admin Lt.2, meeting room Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-04 Dry Powder 4,5 Gd. Admin Lt.1, Lobby Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-05 Dry Powder 4,5 Gd. Admin Lt.1, Lobby Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-06 Dry Powder 4,5 Gd. Admin Lt.1, Lobby Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-07 Dry Powder 4,5 Posko Keamanan Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-08 Dry Powder 4,5 Canteen Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-09 Dry Powder 4,5 Mess Karyawan, Lobby Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-10 Dry Powder 4,5 Mess Karyawan, Lobby Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-11 Dry Powder 4,5 Mess Karyawan, Lorong Kamar Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-12 Dry Powder 4,5 Plant Manager office Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-13 Dry Powder 4,5 Control Room Lt.2 Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-14 Dry Powder 4,5 Control Room Lt.2 Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-15 Dry Powder 4,5 MCC Panel Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-16 Dry Powder 4,5 MV Panel Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-17 Dry Powder 4,5 Workshop Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-18 Dry Powder 4,5 Generator Blackstart Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-DP-19 Dry Powder 4,5 WTP, samping Panel RO Ok Ok Ok  Ok Ok Ok   Ok Next Inspection Des 2021
FE-DP-20 Dry Powder 4,5 Fire Hydrant Panel Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
Diperiksa oleh Benny R / Harits P Tanggal periksa 15 April 2021
Inspected by Date of inspection

Referensi: Permen Nakertrans No. 4 Tahun 1980 tentang Syarat-Syarat Pemasangan dan Pemeliharaan Alat Pemadam Api Ringan Halaman 1 / 2
Pemeriksaan Rutin Bulanan – Alat Pemadam Api Ringan (APAR)

Lokasi Tabung Pemasangan


Location Cylinder Installation

Ukuran
Size
Jenis Catatan
No.

Permukaan

Ketinggian
Type Notes

Pegangan
Alat Ukur

Distance
Content
Surface

Rambu
Bottom

Handle
Selang

Gauge

Height
Dasar

Jarak
Hose

Sign
(Kg)

Pin
Isi
FE-CO2-01 Carbon Dioxide 9 MV Panel Ok Ok Ok  Ok Ok Ok OK Ok Ok Next Inspection Des 2021
FE-CO2-02 Carbon Dioxide 9 MV Panel Ok Ok Ok  Ok Ok Ok OK Ok Ok Next Inspection Des 2021
FE-CO2-03 Carbon Dioxide 9 Workshop Ok Ok Ok  Ok Ok Ok   Ok Next Inspection Des 2021
FE-CO2-04 Carbon Dioxide 9 Workshop Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-05 Carbon Dioxide 9 Fire Hydrant Panel Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-06 Carbon Dioxide 4,6 Gd. Admin Lt.2, work hall Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-07 Carbon Dioxide 4,6 Gd. Admin Lt.1, lobby Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-08 Carbon Dioxide 4,6 Control room Lt.2, lorong GE Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021
FE-CO2-09 Carbon Dioxide 4,6 Control Room Lt.1, lobby MCC Ok Ok Ok  Ok Ok Ok Ok Ok Ok Next Inspection Des 2021

Dilaporkan oleh,

Benny R/ Harits P
SHE

Diperiksa oleh Benny R / Harits P Tanggal periksa 15 April 2021


Inspected by Date of inspection

Referensi: Permen Nakertrans No. 4 Tahun 1980 tentang Syarat-Syarat Pemasangan dan Pemeliharaan Alat Pemadam Api Ringan Halaman 2 / 2