Professional Documents
Culture Documents
Draft: Existing Section
Draft: Existing Section
Draft: Existing Section
Median
Footpath M.V.Lane M.V.Lane Footpath
A
Existing Section
D R
Property Footpath Parking M.V.Lane 1 M.V.Lane Parking Footpath Property
Frontage Frontage
Median
Proposed Section
P C M C L i n k R o a d D e v e l o p m e n t Gurudwara Street, Pimpri - Chinchwad C o n s u l t i n g T e a m Dealt by : Mrunal Tambhale Date : 16 / 03 / 2021
P R A S A N N A D E S A I Job No:
Rev. No. Date Revised By Description INFRAKING CONSULTANTS
a r c h i t e c t u r e, i n t e r i o r & u r b a n d e s i g n c o n s u l t a n t s
----------------------------------------------------------- -----------------------------------------------------------------------------------------------------------------------
Project Management Consultants
1st floor,Silver Space, Vishal Nagar,Wakad, Pune- 411005
13, praniti apts, baner road, aundh, pune - 411 007. ph.: + 91 20 2565 1031
email- pdapuneindia@gmail.com reg.no. - ca / 82 / 6820.
235
24.00m
ROW
1.90m 9.2m 1.00m 9.7m 2.20m
WALKWAY+UTILITYCORRIDOR CARRIAGEWAY DIVIDER CARRIAGEWAY WALKWAY+UTILITYCORRIDOR
RHS
℄
RCC RETAINING EXISTING DEVIDER
WALL AS REQUIRED FROM CH 0/000 TO 0/ 380
0.45m
0.15m WHICH IS RETAINED 0.20m
SLOPE-2.0% 2.5 % 2.5 % SLOPE-2.0%
EXISTING WATER
SUPPLY LINE 600mm Ø
MS SEWER LINE 200mm SEWER LINE
Ø NP-2(AT 2 To 2.5m 300mm Ø NP-3
from Edge of footpath)
24.00m
ROW
3.1m 2.0M PARKING 6.00M 1.00m 6.00M 2.0M PARKING 3.9m
WALKWAY+UTILITYCORRIDOR DIVIDER WALKWAY+UTILITYCORRIDOR
RHS
BC - 40mm
STREET LIGHT
DBM - 50mm
MPM - 75mm
STREET LIGHT
PAVER BLOCK-60 & 80mm
GRIT-50mm
PCC-100mm
GSB-200 (GRADE-I)
RCC RETAINING PROPOSED DEVIDER MURUM-300
WALL AS REQUIRED
0.45m
FROM CH 0/380 TO 0/ 630
0.15m 0.20m
SLOPE-2.0% 2.5 % 2.5 % SLOPE-2.0%
LT OR HT Line
(300mm Ø)
W E
Datum: 93.0
S
OGL
Chainage
1
1
G+
G+1
G+
94
95
96
97
98
99
AR
TO AKURDI STN D W K
0.00 99.759 99.000 99.198 RU OW TO ........
Ch. 0.00 M GU CH
MH
G+2
E
VALV
G+3
30.00 99.781 98.901 99.088
Ch. 30.00 M
PUNE - 411018
CORPORATION,
40.00 99.817 98.868 99.052
G+1
Ch. 40.00 M
0
0.51
G+2
ASTA
50.00 99.817 98.835 99.015
PR
Ch. 50.00 M
1 in 303.19
MH
INDRA
60.00 99.843 98.802 98.979
1 in 273.65
Ch. 60.00 M - ROAD -
A
ANK
70.00 99.800 98.769 98.942
G+2
RAMR
Ch. 70.00 M
SAH.B JA
MH
G+1
80.00 99.800 98.736 98.906
1
MH
90.00 99.765 98.703 98.869 -ROAD-
G+
CIAL
0
ER
Ch. 90.00 M 0.55
COMM
100.00 99.795 98.670 98.833
MH
Ch. 100.00 M
110.00 99.848 98.265 98.796
MH
Ch. 110.00 M
120.00 99.693 98.232 98.682
Ch. 120.00 M
G+3
130.00 99.541 98.199 98.569
S
Ch. 130.00 M MH
-
AD
-RO
140.00 99.382 98.166 98.455 Ch. 140.00 M 0
0.75
MH
1 in 302.51
2
1 in 232.32
Ch. 150.00 M
G+
-ROAD-
MH
G+1
MH
190.00 98.671 97.198 Ch. 190.00 M
98.000
Ch. 200.00 M
200.00 98.495 96.955 97.150
Ch. 210.00 M
210.00 98.348 96.910 97.102
G+2
0
0.51
1 in 207.62
Ch. 220.00 M
220.00 98.242 96.865 97.053
Ch. 230.00 M
AD-
230.00 98.136 96.820 97.005 -RO
MH
Ch. 240.00 M
3
MH
1 in 222.21
D- D-
Ch. 280.00 M
OA OA
280.00 98.007 96.455 -R -R
96.595
1
G+
MH
Ch. 290.00 M
0
290.00 98.012 96.550 96.420 0.51
1 in 293.34
MH
Ch. 300.00 M
300.00 97.867 96.505 96.386
Ch. 310.00 M
310.00 97.779 96.460 96.352
D-
OA
-R
MH
Ch. 320.00 M
320.00 97.652 96.415 96.318
1
G+
.PUNE
MH
Ch. 350.00 M
350.00 96.931 95.625 95.925
G+2
G+1
Ch. 360.00 M
360.00 96.849 95.589 95.746 365.16 M
Ch. 365.00
S
Line- 93.620
L-SECTION
1 in 302.72
Ch. 375.00 M
Proposed (LHS) I.L. 95.208
0 OA
0.50 -R
Ch. 385.00 M
2
MH
G+
Ch. 395.00 M
D -
A D -O A 0
400.00 96.303 94.410 94.207 -RO -R 0.50
G+3
Ch. 405.00 M
Ch. 425.00 M
S
G+
94.548 E
VALV
Proposed (RHS) I.L. 94.410
Proposed (RHS) I.L. 95.479
Ch. 435.00 M
DETAIL OF PLAN
MH
2
G+
MH
440.00 96.143 94.595 94.357 Ch. 445.00 M
D-
OA
Dia 300mm
-R
94.394 MH
3
DRAWN BY :
YASH
G+3
Ch. 495.00 M
DRAWING
500.00 96.081 94.827 94.581
Ch. 505.00 M
510.00 96.045 94.851 94.619
1 in 287.52
Ch. 515.00 M
520.00 96.013 94.874 94.656
CHECKED BY :
-ROAD-
Ch. 525.00 M
530.00 95.993 94.898 94.694
Ch. 535.00 M
540.00 96.003 94.922 94.731
2-CH 0/730
1-CH 0/395
Ch. 545.00 M
TO HIGHWAY
DATE:
P.C.M.C.
Ch. 555.00 M
B - Sewerage
Ch. 565.00 M
APPROVED BY
Ch. 595.00 M
95.820
96.120
D-
Ch. 645.00 M
OA
-R
P.C.M.C.
Deputy Engineer
Invert Level of
Ch. 685.00 M
690.00 96.159 94.745
Ch. 695.00 M MH
CH 0-455 To 0-735 Sewerage
Line- 94.04
MH
Connect I.L. of
MH
MH
MH
-ROAD-
TANK
ROAD
1 in 311.74
BOUNDARY
LAMP POST
MH
STRUCTURE
WIRE FENCE
D-
FLOWER BED
OA
-R
ELECTRIC BOX
CEMENT ROAD
ELECTRIC LINE
Ch. 765.00
COMPOUND WALL
FOOTPATH BLOCK
M
TITLE: TYPICAL L- SECTION OF SEWER LINE @ CH. 0/000 TO 0/800.
TREE, COCONUT TREE
Ch. 785.00 M
DRG.NO. : PCMC/ BRTS/ GURUDWARA CHOWK TO RAJYOG COLONY /TLS/001
Executive Engineer
P.C.M.C. PIMPRI-18
Ch. 795.00 M
800.00 97.913 96.671 Ch. 800 M
802.05 97.874
TO HIGHWAY